A Study of Successful Factor on PSD Application Technique for Manual Operation Mode(ATS) (수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구)

  • Son, Yeong-Jin;Park, Keun-Soo;Min, Kyung-Yun
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.755-770
    • /
    • 2006
  • 1974. 8.15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basic design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

  • PDF

Shear lag effects on wide U-section pre-stressed concrete light rail bridges

  • Boules, Philopateer F.;Mehanny, Sameh S.F.;Bakhoum, Mourad M.
    • Structural Engineering and Mechanics
    • /
    • v.68 no.1
    • /
    • pp.67-80
    • /
    • 2018
  • Recently, U-section decks have been more and more used in metro and light rail bridges as an innovative concept in bridge deck design and a successful alternative to conventional box girders because of their potential advantages. U-section may be viewed as a single vent box girder eliminating the top slab connecting the webs, with the moving vehicles travelling on the lower deck. U-section bridges thus solve many problems like limited vertical clearance underneath the bridge lowest point, besides providing built-in noise barriers. Beam theory in mechanics assumes that plane section remains plane after bending, but it was found that shearing forces produce shear deformations and the plane section does not remain plane. This phenomenon leads to distortion of the cross section. For a box or a U section, this distortion makes the central part of the slab lagging behind those parts closer to the webs and this is known as shear lag effect. A sample real-world double-track U-section metro bridge is modelled in this paper using a commercial finite element analysis program and is analysed under various loading conditions and for different geometric variations. The three-dimensional finite element analysis is used to demonstrate variations in the transverse bending moments in the deck as well as variations in the longitudinal normal stresses induced in the cross section along the U-girder's span thus capturing warping and shear lag effects which are then compared to the stresses calculated using conventional beam theory. This comparison is performed not only to locate the distortion, warping and shear lag effects typically induced in U-section bridges but also to assess the main parameters influencing them the most.

A Study of Successful Factor on PSD Application Technique for Manual Operation Mode(ATS) (수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구)

  • Son, Yeong-Jin;Park, Keun-Soo;Min, Kyung-Yun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.1 s.38
    • /
    • pp.57-66
    • /
    • 2007
  • 1974. 8. 15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 2224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basie design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

A Study on the Wearing Phenomenon of Pantograph Slider for the SEOUL METRO Line 4 Rail Vehicles (4호선 전동차 판토그라프 주습판 마모현상에 관한 연구)

  • Kim, Young-Gyu;Yang, Yong-Joon
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.51-56
    • /
    • 2007
  • Pantograph of the electric train is the important part receiving current by adhereing contact wire. Wearing rate of pantograph or contact wire is changed by the type of pantograph and material of adhering part. In special, the weather influences the relative wearing rate and wearing type of pantograph Slider and Contact wire with steep wearing in arc and life cycle of pantograph slider. Presently, the weather causes side-wearing and over-wearing of pantograph slide installed in electric train. So it is difficult to manage and operate the electric train. Although the quality of slide using in line4 vehicle was finished the test in line 2 vehicle experimentally, it has to apply after pantograph is installed in some electric trains and check the influence in it and contact wire. It is because line4 section is very different from line2 section. Experimental application is the sequence to certify the safety and abrasion resistance importantly by enlarging experimental application with increase of the experimental electric train. The lenth of line4 in Seoul Metro is 71.5[km]. It is long section. The line is mixed DC 1,500[V] section and AC 25,000[V] section. It has underground section of 41.5[km] and ground section of 30[km]. Ground section is about 42% and receives much influence in the rain during the rainy season. After experimental application we found that this pantograph slide has twice as much abrasion resistance despite a little deviation and found the occurrence probability of arc and side-wearing is decreased considerably.

  • PDF

Detection Method Analysis for Train Correct Position Stop in Manual Operation for PSD System (수동운전 방식에서의 PSD시스템을 위한 정위치정차 판독방법 분석)

  • Lee, Moo-Ho;Yang, Gi-Hee;Park, Jung-Soun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1678-1684
    • /
    • 2007
  • Platform Screen Door(PSD) has been installed in train manual operation section(ATS/ATC) by SeoulMetro since 2005. PSDs are now operating at 17 stations in SeoulMetro lines. As a result, it increases the safety of passenger, makes a comfortable platform and saves the energy of air conditioning. For PSD operation, train shall stop within 600mm of the train stop reference point. In train manual operation section, the detection system of train position is required to notify the train driver of train position and to ensure the condition that train stops the correct position for PSD operation. To detect the train stop position, the optical sensor shall be installed at platform. However, in case of SeoulMetro lines, the detection criterions of the train correct position stop are different because of using various types of trains which have different size and shape of front cars. In this paper, to solve this problem, the precise detection algorithm of the train stop at the correct position is used, and Laser distance measure sensor is introduced to notify the distance form the reference point of the train correct stop to train driver. This system has been applying to Seoul Metro line total.

  • PDF

Case of track improvement in the area of redevelopment project surrounding around Seoul Metro Lin.4(R=250m) (서울지하철 4호선 R250m 인접구간 도시개발정비에 따른 궤도방진설계)

  • Kong, Sun-Yong;Kim, Sang-Jin;Yang, Tae-Kyung;Baik, Chan-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.324-329
    • /
    • 2010
  • The surroundings around subway are becoming more lively for project of CBD (an redevelopment project), however vibrations which are made through passing train cold spread buildings around. The structure-borne noise could be generated at the same time that makes people including developers and th citizens have negative viewpoint on railway. Especially, Seoul Metro 1-4 lines ar built alongside the road nearby houses and business district. That could make plenty of public resentments because of the structure-borne noise. Seoul Metro should make active alternative plans for their future urban environment projects which will be conducted. The case was Railway Facility which were conducted to minimize structure-borne noise from sharp curved track section (4 line, Sinyongsan~Ichon, R 250m). The section is adjacent to house district as near as 6.6m related with pusing international city project, the 4th urban environment project around international building, near Yongsan station. The interval of sleepers would be downsized in half with breaking existing case, and pad stiffness is reduced 4 ton from 10 ton. That makes structure-borne noise minimized because of vibrations are lowered about 19.1-23.0db. The structure above has remained for a year and a half from October, 2008, and had not any trouble to perform excellence with 80million ton rail accumulated tonnage.

  • PDF

The Funding system for Shanghai Metro And The Practical Experiences of Utilizing Foreign Funds

  • Zhou Yao Dong
    • Proceedings of the KOR-KST Conference
    • /
    • 1998.09a
    • /
    • pp.185-191
    • /
    • 1998
  • Metro, as a kind of city rail transit, is a modem city passenger transit system with mass transportation and independent special rails. It has become a backbone of the traffic in the metropolis and an important modern symbol of a city. A modem traffic system is indispensable for Shanghai to be an international metropolis of finance, trade and economy. At present, Shanghai metro line No. 1 and its extension have been put into operation, metro line NO. 2 will be put into trial operation by the end of 1999, the Pearl Line, an elevated rail transit system is under construction and other lines will be constructed later according to the plan. But the funding of the city rail transit construction (both metro and light rail) is a big difficult problem to the infrastructure construction of the metropolises either at home or abroad, which is also a problem to restrict the development of the city rail transit of Shanghai. We have learned from the internal and external experiences of the rail transit construction that it is an important means to deal with the funds of the city rail transit construction to actively utilize foreign funds. It makes up the shortage of the internal funds on the one hand, the external advanced science and technology and the management experiences can be introduced on the other hand. In order to discuss and study conveniently with you together the new problems appearing in the metro construction and to open up a new train of thought, this article will give out a certain analysis and description to the funding method in the metro construction of Shanghai and the characteristics of utilizing foreign funds in the rail transit construction as well as the problems which we are faced with.

  • PDF

A Study on an Analysis of Noise Reduction Effects using the tentatively Installed Sound-absorbing Materials in Metro Tunnel (도시철도 터널내 흡음재 시험설치 및 소음저감효과 분석에 관한 연구)

  • Hong, Chul-Kee;Jeong, Ri-Taek;Kim, Byeong-Hong
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.125-131
    • /
    • 2008
  • This research tries to analyze and investigate the effects of the noise reduction test for the sound-absorbing materials installed tentatively on Metro Line 5. Though the noise reduction effects of each sound-absorbing material showed that there was about $2{\sim}5\;dB$ compared with before and after of the tentative installation, it shows that the noise reduction effects are reducing because of the section change condition such as dust absorption and the rail abrasion as time passes after the tentative installation. Also, many difficulties are occurring in the maintenance of the orbit facilities because of the installation of sound-absorbing materials. Though various abroad products for noise reduction are imported like this, the researches for the noise reduction effect increase for this and the improvement direction are being required because of the poor circumstance of the efficiency aspect compared to the economic investment effect because those are not suited to the character of domestic Metro.

  • PDF

Theoretical Study of Neutral Section Considering the Driving Characteristics of ATO Urban Railway Vehicle (자동운전 도시철도차량의 운전특성을 고려한 절연구분장치 이론적 고찰)

  • Lee, Jae-Bong;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.10
    • /
    • pp.1470-1474
    • /
    • 2013
  • In this paper, proper length of neutral section and neutral section system configuration is proposed to minimize accidents if ATO urban railway vehicle stops maintaining the leading vehicles in air section at regular intervals. When considering the minimum voltage sensing of power conversion unit in the urban railway vehicle, the effective length of 14,280[mm] with neutral section can be minimized damage due to high current because the urban railway vehicle is very little present chance compare neutral section with pantograph interval installed on a unit vehicle. In addition, uplift of catenary line and contact wire consider to minimize damage. The result of theoretical review, as the proposed neutral section shorter, isolated neutral section is effective than the integrated neutral section.

Change analysis with A.C of D.C electric railway (직류 전기철도의 교류화 분석)

  • Kim, Youn-Sik;Lee, Gi-Seung;Sim, Jae-Suk
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.151-156
    • /
    • 2008
  • The after 1974 capital region electric railroad is opened to traffic Koraill and Seoul metro adopt each other different power supply method and they operate and they are come. AC 25[kv] method voltage the insulation becomes larger standing distance highly, the case tunnel section which will introduce in the underground segment becomes on a large scale and the cost of construction increases to the city center and the underground segment adoption of DC method was many. To recent times with R-bar (Rigid-bar) introductions change of tunnel section the introduction of AC method came to be easy without in the underground segment. Operates sees in the electric protection where the Seoul metro and the Korail are different each other and, from the dead section segment the interior electric light to put out lights the passenger brings about inconveniently and the civil appeal which demands a power supply method unification occurs, within the company interchange electric railroad brazier safety improvement and maintenance expense curtailment etc. the flaw is original proposal, is a condition which finishes a feasibility study service about the power supply method fringe land. Interchange analysis of the DC electric railway it leads from the present paper and it compares under analyzing being it could be reflected to also the route which is in the process of actual using boil the strong point and a weak point of DC and AC method of the establishment route constructive at the time of and

  • PDF