• Title/Summary/Keyword: mega project

Search Result 102, Processing Time 0.024 seconds

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.12 no.1
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

Development of Work Breakdown Structure Basis for Mega-Project (메가프로젝트를 위한 업무분류체계기준(WBS Basis) 개발)

  • Lee, Hei-Duck;Seo, Yonng-Chil;Lee, Seung-Hoon;Woo, Yu-Mi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.441-444
    • /
    • 2008
  • 메가프로젝트(Mega-Project)는 다양한 유형의 시설군을 복합 개발하는 건설사업으로서 규모가 크고 복잡한 경우가 많기 때문에 종합적인 사업관리에 어려움이 따른다. 따라서 메가프로젝트는 기존의 단위프로젝트 수준이 아닌 프로그램 수준에서의 관리체계를 필요로 하며 그에 적합한 업무분류체계(WBS)를 구축해야 한다. 업무분류체계는 사업관리를 위한 전체적인 구조를 수립하는 기반으로서, 현재 프로그램 관리 수준의 업무분류체계의 기준이 갖추어지지 않은 상황이다. 이에 본 연구에서는 메가프로젝트를 위한 업무분류체계기준(WBS Basis)를 개발하여 메가프로젝트의 업무분류체계 구축을 지원하고자 한다. 메가프로젝트 생애주기에 포함되는 전체 시설군, 업무 및 용역, 기록문서, 정보 등을 대상으로 하였으며, 기존 사례분석과 관련 분류체계들을 바탕으로 초안을 작성하였다. 이후 현장시험을 통한 검증을 거쳐 최종 업무분류체계기준을 완성하였고 분류내용과 활용방안을 소개한다.

  • PDF

Development of Progress Measurement Framework for Mega Construction Project (대규모 건설프로젝트의 진도율 측정 프레임워크 개발에 관한 연구)

  • Ko, Sungjin;Chi, Seokho;Kim, Jinwoo;Song, Junho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.419-425
    • /
    • 2017
  • Managing mega construction project is a very challenging task due to its large scale and complexity. To deal with the challenge, progress measurement must be estimated reliably and effectively. Many researchers have presented progress measurement methods, but previous studies are limited to single or several types of facilities. Thus, they have difficulties to being applied to mega construction projects that covers multiple facilities. To overcome the limitations, this paper proposes a progress measurement framework considering characteristics of mega construction projects. The framework consists of four phases : development of Work Breakdown Structure, determination of weights of main facilities and sub facilities, and calculation of the integrated progress rate. To validate the proposed approach, a case study of Sejong city in Korea was performed. The results of the case study showed the applicability of the proposed framework and confirmed that it enables to reliably measure progress rate of mega construction projects.

The Application of using BIM(Building Information Modeling) for a Mega-Complex Building Construction - Focused on using for L-Project - (초고층 대형복합 건축공사에 있어 BIM 활용에 관한 고찰 - 해운대 L-Project 적용 성과를 중심으로 -)

  • Park, Hee-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.42-43
    • /
    • 2020
  • Recently as construction projects have been complicated, it has been wearing thin to draw on their personal experiences for management. Although the advance of IT, using the technology for construction is insufficient in contrast to other industries. BIM has been steadily used in construction projects, but it is not easy to find the case of successful use. This research considers ways in which BIM technology can be applied to useful management on a construction site and derives a method of application of using BIM for a Mega-complex Building Project especially.

  • PDF

The Case Study on a Documentation of Mega Sports Event (메가 스포츠이벤트의 기록화를 위한 사례연구)

  • Cheon, Ho Jun
    • The Korean Journal of Archival Studies
    • /
    • no.42
    • /
    • pp.37-71
    • /
    • 2014
  • The purpose of this study was to analyze developed case of archiving on Mega Sport Event for searching effective method on a documentation of Mega Sport Event. In order to conduct this study, literature review method was using about book, thesis and data of internet homepage for exploring the stage on Mega Sports Event and case of Mega Sports Event record management. The field study was conducted about institute related to Olympic record management institution for analysing Mega Sports Event record management. The result of this study is following: Firstly, 2012London Organizing Committee of the Olympic Games's case(The People's Record Project) is useful to ex-ante event phase. Secondly, 2000Sydney Organizing Committee of the Olympic Games's case(Olympic Games Knowledge Management Project) is useful to event operation phase. Thirdly. LA84Foundation's case(Olympic Oral History Project) is useful to ex-post event. The significance of this study which came up with the study result above can be presented as follows. Based on the result of this study, it is assumed that three case for documentation about Mega Sports Event. Lastly, the result of this study was useful to Mega Sports Event record management institution. For the more, it will be conducted to study law of Mega Sport Event record management, humane and Material resource and method related to record management of the Mega Sports Event organizing committee.

A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims (해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법)

  • Kim, Young-jae;Kim, Tae-kyoung;Jo, Duk-sang;Lee, Hwang-ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.165-176
    • /
    • 2015
  • Recently many Korean large-sized construction companies as well as specialty contractors have been expanding their business in the overseas market to mitigate impacts from long-term stagnation in the domestic market. Such as a result, it has been arisen as a major issue that contractors effectively manage the delays which have been commonly faced with in international mega-projects. Therefore it can be said that the ability of the delays management leads a success of project. This paper presents a review of literature for delay analysis methods such as time impact analysis(TIA) and raises practical problems to rationally substantiate the duration of extension of time(EoT) in international mega projects which have wide scope of works as well as complicated and detailed contract baseline programs by taking theoretical approaches. We suggest the two improvement concepts to substantiate the EoT claims which are effectively applicable to practical projects. The first is to sort out dominant delays among numerous delays in advance of applying a delay analysis. The second is to set up the delay sections with the advanced concept for analysing delays' effects by TIA. This study performed a case study on an actual international mega-project. to confirm the effectiveness of improvement concepts that this practical approach is applicable for the assessment of EoT. In conclusion, this paper supposes to provide practitioner in charge for an EoT claim with an advanced substantiation methodogy when they not only analyse the construction delays by using TIA, but also negotiate with stakeholders about with the assessment of EoT.

Construction Process & Technologies Applied to Parc.1 Project

  • Hoi-soo, Seo;Jae-min, Baek
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.181-187
    • /
    • 2022
  • POSCO E&C has completed Parc.1 project successfully. The construction period was 42months, and 1.5 million workers were participated till completion. To meet schedule management and quality control, POSCO E&C has adopted a lot of technologies such as GPS measurement, 3D scanning, vibration control, stack effect control, column shortening control, etc

Development of Pre-workshop Phase for the VE application at the Early Planning Stage of the Mega Project (메가프로젝트 기획/계획단계 VE적용을 위한 준비단계 수행방안)

  • Ha, Seung-Ryong;Hyun, Chang-Taek;Son, Myung-Jin;Kim, Yun-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.29-39
    • /
    • 2011
  • In Korea, many mixed-used development projects(MXD) in mega project size are currently active. As these mega projects require long-term construction and execution and involve by different subjects in different fields, their completion breeds various problems, such as conflicts among project participants due to their complicated interest relationships and inaccuracy in predicting the economic performance of the projects due to inappropriate facility capacity planning. To solve these problems, it is essential to apply value engineering (VE) at the planning phase of the project, which can result in the best possible cost reduction and improvement of project performance. However, not many projects are actually implementing VE because of the lack of available information, as well as the limitations due to uncertainty in the early period of project execution. Therefore, this study aimed at proposing VE Team Building, Quality Model Performance Indexes, Space Model so as to resolve common mega project problems and overcome VE application limitations at planning stage. The result of this study is expected that the data can be utilized as basic data to apply VE at the planning phase of the large complex projects.

A Development of Risk Performance Index for Mega-project Performance Measurement in view of the integrated Cost/Schedule/Risk (비용/공정/위험 통합 관점에서 메가 프로젝트 성과측정을 위한 위험성과지수 개발)

  • Kim, Seon-Gyoo;Park, Kyoo-Young;Yu, Young-Jeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.69-77
    • /
    • 2009
  • Recently, a research of the urban regeneration has been performed very actively. This is one of the efforts to resolve various social and economic problems coming from the existing deteriorated building and facilities by new urban development or redevelopment. However, an urban regeneration has a characteristic to be unable to ensure the project performance due to the exposed numerous risks coming from the various and complex stake-holders, and its mega sizes. This paper proposes the method of risk performance index in order to improve an efficiency of performance measurement expanding to the risk view point from the existing integrated cost/schedule performance measurement. A risk performance index is compatible with the existing EVMS, and can make the performance measurement in 3 dimensions of the integrated cost/schedule/risk with 18 sub-indexes and variables.

XML-based Information Model for Interactive Electronic Technical Manual for Urban Regeneration Project

  • Sunghoon Kang;Hyun-Soo Lee;Moonseo Park;Jin-Wook Jung
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.841-846
    • /
    • 2009
  • Recently, the construction industry is getting more complex and sophisticated having the characteristics of a mega project. Mega project pursues a value that can't be gained with an approach of seeing a project as just a simple sum of different parts but a mutual combination. However, the current manuals can't fulfill the needs for supporting, therefore, need a tool to support the decision making and an IETM is expected to take this role. Despite the a lot of expected advantages of IETM, it is still difficult to apply because of the frequent changes of information of detailed process and its complexity. In this research, as part of developing an IETM, we aim to propose a system frame which is based on the analysis of processes of a project. It is basic part of IETM to give information to users and IETM consists of normal mode that offers general information about the urban regeneration project and user-specified mode that gives classified and reorganized information to user. For supporting these functions, IETM should be stored in a form that can classify the information about urban regeneration project and be tagged with meaningful tags. Moreover IETM developers have to consider the interoperability of IETM because it ultimately should be coordinated with overall Project Management System like an iPMIS. We used XML for solution of interoperability because it stores information as just text-file that doesn't need a special form.

  • PDF