• 제목/요약/키워드: management periods

Search Result 1,094, Processing Time 0.027 seconds

A Study on operational issues and status of Certificate of Basic OSH Training in Construction (건설업 기초안전보건교육의 운용적 문제점과 실태에 관한 연구)

  • Park, Hyun-Geon;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.53-62
    • /
    • 2017
  • Full embroidery industrial accidents in recent years has shown a declining trend. But disaster embroidery of domestic construction industry were more than 20,000 deaths per year is about 500 people. The government has introduced a construction site often changing the recruitment of new construction based on health and safety as an alternative to road safety education training yisuje of construction workers, daily work periods short. Certificate of Basic OSH Training in Constructions had also been evaluated as successful by reducing the accident rate problem. It is conducted in private educational institutions has occurred on the friction between workers and employers and training costs are difficult to approach workers in the education standards for such facilities due to the superintendent. Educational institutions are institutions that have been caused by excessive competition lowered levels of education. There is also a lack of evaluation that the training is limited to the basic safety knowledge. These details are brought formal safety education purposes only and is introducing the results of other self jyeotgi difficult to reap the proceeds to good effect. In this study, we propose a plan for improving operational problems and enemy status based on research data presented after the Certificate of Basic OSH Training in Construction.

Bibliometric Analysis of Collaboration Network and the Role of Research Station in Antarctic Science

  • Kim, Hyunuk;Jung, Woo-Sung
    • Industrial Engineering and Management Systems
    • /
    • v.15 no.1
    • /
    • pp.92-98
    • /
    • 2016
  • Due to the large scale of Antarctic science, scientific collaboration is required for conducting scientific research. In this study, we attempted to investigate collaboration network and the role of research station in Antarctic science based on bibliometric data from 1995 to 2014. We confirmed that geographical proximity tends to be important for scientific collaboration by employing community detection in the network. This result raises the question about what the role of research station in Antarctica is. We tried to reveal its role by focusing on five countries, Belgium, China, Czech Republic, India, and Korea that constructed new research stations during the last decade. Relative growth rate, a value to measure the growth of publications, didn't differ much around the construction period compared to those in other periods for these countries except Belgium. However, we found geographical keywords emerged around the construction for all five countries. These keywords were utilized to observe national research activities in Antarctica. They show where countries started to be concerned about after the construction.

An Optimal Mission Assignment Model for Determining a Minimum Required Level of Nuclear-powered Submarines (원자력 추진 잠수함 최소 소요량 결정을 위한 임무 할당 최적화 모델)

  • Lee, Dong-Gyun;Park, Seung-Joo;Lee, Jinho
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.2
    • /
    • pp.235-245
    • /
    • 2018
  • This study first analyzes the necessity and the validity of procuring nuclear-powered submarines, and presents an optimization model as an integer program to determine a minimum required level of them. For an optimization model, we characterize a submarine's mission, ability and availability, and apply these to the model by constraints. Then, we assign the submarines available currently and the nuclear-powered submarines, that will be newly introduced, to the predefined missions over the planning time periods in a way that the number of nuclear-powered submarines be minimized. Randomly generated missions are employed to solve a mission assignment problem, and the results show that our integer programming model provides an optimal solution as designed, and this can provide a guideline for other weapon system procurement processes.

Estimating Vulnerable Duration for Irrigation with Agricultural Water Supply and Demand during Residual Periods (농업용수의 잔여 공급계획량 및 수요예측량에 의한 관개 취약시기 산정)

  • Nam, Won-Ho;Kim, Tae-Gon;Choi, Jin-Yong;Lee, Jeong-Jae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.5
    • /
    • pp.123-128
    • /
    • 2012
  • For optimal reservoir operation and management, there are essential elements including water supply in agricultural reservoir and demand in irrigation district. To estimate agricultural water demand and supply, many factors such as weather, crops, soil, growing conditions cultivation method and the watershed/irrigation area should be considered, however, there are occurred water supply impossible duration under the influence of the variability and uncertainty of meteorological and hydrological phenomenon. Focusing on agricultural reservoir, amount and tendency of agricultural water supply and demand shows seasonally/regionally different patterns. Through the analysis of deviation and changes in the timing of the two elements, duration in excess of water supply can be identified quantitatively. Here, we introduce an approach to assessment of irrigation vulnerable duration for effective management of agricultural reservoir using time dependent change analysis of residual water supply and irrigation water requirements. Irrigation vulnerable duration has been determined through the comparison of water supply in agricultural reservoir and demand in irrigation district based on the water budget analysis, therefore can be used as an improved and basis data for the effective and intensive water management.

Establishing the Importance Weights of Pilot;s Fatigue Factors through AHP analysis (AHP 기법을 활용한 조종사 피로요인의 상대적 중요도 분석)

  • Moon, Woo-Choon;Kang, Woo-Jung;Choi, Youn-Chul;Kim, Woong-Yi;Lee, Koo-Hee
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.20 no.3
    • /
    • pp.68-75
    • /
    • 2012
  • The traditional regulatory approach to managing pilots fatigue has been to prescribe limits on maximum daily, monthly, and yearly flight and duty hours, and require minimum breaks within and between duty periods. This approach comes from a long history of limits on working hours dating back to the industrial revolution. So, the Council of ICAO recently adopted International Commercial Air Transport regarding the development and implementation of fatigue risk management systems(FRMS). The FRMS can provide better safety outcomes than current prescriptive flight and duty regulations while allowing greater operational flexibility. This study aim to analyzing relative importance of pilots' fatigue factors in order to minimize pilots' fatigue-related safety risks. More researches regarding monitoring and managing fatigue, based upon scientific principles, are required in the future.

An Alternative Modeling for Lot-sizing and Scheduling Problem with a Decomposition Based Heuristic Algorithm (로트 크기 결정 문제의 새로운 혼합정수계획법 모형 및 휴리스틱 알고리즘 개발)

  • Han, Junghee;Lee, Youngho;Kim, Seong-in;Park, Eunkyung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.3
    • /
    • pp.373-380
    • /
    • 2007
  • In this paper, we consider a new lot-sizing and scheduling problem (LSSP) that minimizes the sum of production cost, setup cost and inventory cost. Setup carry-over and overlapping as well as demand splitting are considered. Also, maximum number of setups for each time period is not limited. For this LSSP, we have formulated a mixed integer programming (MIP) model, of which the size does not increase even if we divide a time period into a number of micro time periods. Also, we have developed an efficient heuristic algorithm by combining decomposition scheme with local search procedure. Test results show that the developed heuristic algorithm finds good quality (in practice, even better) feasible solutions using far less computation time compared with the CPLEX, a competitive MIP solver.

An Empirical Analysis on the Spillover Effects of R&D Investment in the ICT industry (ICT 산업의 R&D 투자가 타 산업에 미치는 파급효과 측정)

  • Jung, Woo-Jin;Kim, Hyunsuk;Cho, Shin
    • Knowledge Management Research
    • /
    • v.20 no.1
    • /
    • pp.27-43
    • /
    • 2019
  • This paper examines spillover effects of R&D investment in the ICT industry to other industries by analyzing panel data composed of 6 manufacturing industries for the period of 1983~2011. Major findings are as follows; (1) The increase of R&D investment in ICT industry has a significantly positive relationship with the increase in the value-added of the remaining 5 industries with 3~10 year lags, depending on the source of R&D funds and R&D stage. (2) More specifically, public R&D shows the spillover effects during 3~7-year lag periods, whereas private R&D started to exert spillover effects from 9-year lag. The result implies that the public R&D appropriately targets projects with more spillover effects. (3) Basic research, applied research, and development showed the spillover effects for the period of 9~10, 7~10, and 10-year lag, respectively. (4) The R&D investment in 5 other industries such as machinery, chemicals, and materials does not have positive spillover effects to the remaining industries. Few studies have been done to analyze the R&D spillover effects to other industries, with certain limitations. This study contributes to the existing literature by analyzing the spillover effects of the different R&D funds and R&D stages, and by considering various time-lag effects.

The Momentum Strategy of Small Foreign Investors in the Indonesia Stock Exchange

  • SYAMNI, Ghazali;AZIS, Nasir;MUSNADI, Said;FAISAL, Faisal
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.3
    • /
    • pp.361-372
    • /
    • 2021
  • This research aimed to analyze the momentum strategy of foreign investors with the smallest trading transactions in the Indonesian stock market. This study applied a quantitative method approach using intraday transaction data of companies listed on the LQ-45 Index for March, April, and May 2017, obtained from the Indonesia Capital Market Institute (TICMI) which is a subsidiary of the Indonesia Stock Exchange (IDX). The number of companies with available data is 35 companies, consisting of 23 non-government stocks and 12 government stocks. The number of observations from the 35 companies was 8,686,030 observations where the government companies recorded 2,751, 545 and the non-government companies 1,387,016 observations. All data was then squeezed and grouped into small, medium, and large trade transaction orders. The data analysis method used was paired t-test with SPSS to analyze cumulative abnormal returns in the formulation and test periods. This study found that small foreign investors carried out momentum strategies on stocks listed on the LQ-45 Index. However, re-testing was done by separating government and non-government shares. It turned out that small foreign investors performed a momentum strategy on non-government and a contrarian strategy on government.

A Study on the Optimal Design of the Arterial in Pusan Area Using the TSM Techniques (TSM기법을 고려한 부산지역 간선도로의 최적설계에 관한 연구)

  • An, H.C.;Kim, T.G.
    • Journal of Korean Port Research
    • /
    • v.7 no.2
    • /
    • pp.19-36
    • /
    • 1993
  • In this study for relieving traffic congestion on the main arterial in Pusan using TSM Techniques, the travel system, roadway system and signal system analyses were dine. Through these above analyses, it was shown that the peak-time periods on the main arterial were shaped between 10 : 00 and 11 : 00 in the morning and between 15 : 00 and 16 : 00 in the afternoon for the business and shopping trips. Especially, there appeared to be about 23% reduction in the average delay when roadway system management including left-turn links increased were done, about 29% reduction in the average delay when signal system management including the signal phases and timings readjusted were conducted, and about 48% reduction in average delay when roadway system and signal system management were taken into consideration simultaneously. Based upon these results, it was concluded that there might be considerably better results in the average delay if the progressive signal system analyses on the arterial were applied with the land and road widths balanced, the difference on the turning vehicles and mid-block volumes readjusted, and roadside parking traffic prohibited.

  • PDF

A Review on the Decision-making Process for Calculating Land and Construction Costs in the Early Stages of the Project - Focusing on the Housing Vonstruction Project in Jeju Island - (사업초기단계에서 토지비 및 건축공사비 산정을 위한 의사결정프로세스에 관한 고찰 - 제주도 내 주택건설사업 중심으로 -)

  • Jo, Seong-Min;Cho, Sung-Hee;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.321-322
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF