• Title/Summary/Keyword: management performance evaluation

Search Result 2,664, Processing Time 0.03 seconds

A Case Study of Implementation of a BSC Performance Evaluation System in Manufacturing Industry based on Product Data Management (제조업 분야에서 Product Data Management 기반의 BSC 성과평가 시스템 구축 사례 연구)

  • Oh, Jeong-Su;Yang, Jeong-Sam
    • IE interfaces
    • /
    • v.23 no.4
    • /
    • pp.275-285
    • /
    • 2010
  • In complex industrial world, many companies make every effort to analyze their competition capability through various performance evaluation tools to cope with rapidly changing business environment. Among evaluation tools the balanced scorecard (BSC), put forward by Kaplan and Norton in 1992, is a strategic performance management tool for measuring whether the smaller-scale operational activities of a company are aligned with its larger-scale objectives in terms of vision and strategy. The BSC tool offers a comparative advantage over others to evaluate the objective achievement of a company by linking its strategic objectives with operational KPI. In this paper, we introduce a case that the BSC performance evaluation system was implemented based on product data management and applied it to the business process. Specially, we shows a implementation procedure to derive discipline-specific topics and key performance metrics.

A Study on Establishing Finance Performance Evaluation Model in Each Clinical Department - Factors Influencing Operating Profit of Hospitals - (진료과별 재무성과 측정모형 구축 연구 -병원의 의료이익에 영향을 미치는 요소를 중심으로 -)

  • Lee, Youn-Tae;Ryu, Kie-Hyun
    • Korea Journal of Hospital Management
    • /
    • v.4 no.2
    • /
    • pp.162-191
    • /
    • 1999
  • This study was conducted to establish finance performance evaluation model for physicians in each clinical department, by using factors which determines financial outcome(performance) in each clinical department The ultimate aim of study is to develop effective performance-based pay system for physicians. The system, by motivating physicians, should increase their productivity. To do so, it is critical to establish finance performance evaluation model to achieve final goal of this study. 232 private hospitals were chosen from 693 hospitals which were subject to hospital survey by the Korea Institute of Health Services Management and their revenue and expense-related data during 1997 were collected. By adopting multiple regression method, the study shows that the evaluation model for each clinical department was statistically significant. The study suggest the effective performance-based pay system based on financial performance of each clinical department. The pay system includes the level of compensation, the way of how to allocate profits to each department, and criteria whether the compensation should provide or not. In conclusion, the study has following implications. First, the study suggest finance performance evaluation model for each clinical department Second, the study suggest guidelines and plans to establish qualitative measure of financial performance in each clinical department. Third, the study suggest that adopting performance-based pay for physicians could be impetus to achieve organizational goal by motivating them with fair compensation.

  • PDF

PERFORMANCE EVALUATION FRAMEWORK FOR ENGINEERING CONSULTANTS OF TAIPEI RAPID TRANSIT SYSTEMS

  • Chien-Hui Sun;Nie-Jia Yau
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.426-431
    • /
    • 2011
  • The quality of performance evaluation on engineering consultants that provide design-related technical services is difficult to be measured, and only a handful of papers discussed the quality during the design stage. Although design cost is relatively far less than construction cost for a project, the decisions made in the design phase have a significant impact on the final products of the project, especially for large public construction projects. Therefore, this research focuses on reviewing and then establishing a performance evaluation framework for the consulting firms that execute detailed design and provide technical services for the Taipei Rapid Transit Systems (TRTS). By interviewing experts, this study first established a set of indicators to evaluate these firms' performance. Then, those indicators were incorporated into the four aspects of balanced scorecard (BSC) to establish the architecture of the evaluation mechanism. The weight of each indicator was calculated by analytic hierarchy process (AHP) from a survey conducted among experts. The results showed that the top-three indicators were quantity take-off, functions conformity, and budgeting. The framework of performance evaluation established by this study can be applied to measure service performance during the design stage. It not only facilitates the monitoring of consulting firms, but also helps to reduce unnecessary change orders and disputes during the construction stage.

  • PDF

Performance management of communication networks for computer integrated manufacturing Part ll: Decision making (컴퓨터 통합 샌산을 위한 통신망의 성능관리)

  • Lee, Suk
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.11 no.4
    • /
    • pp.138-147
    • /
    • 1994
  • Performance management of computer networks is intended to improve a given network performance in order for more efficient information exchange between subsystems of an integrated large-scale system. Improtance of performance management is growing as many function of the large- scale system depend on the quality of communication services provided by the network. The role of performance management is to manipulate the adjustable protocol parameters on line so that the network can adapt itself to a dynamic environment. This can be divided into two subtasks : performance evaluation to find how changes in protocol parameters affect the network performance and decision making to detemine the magnitude and direction of parameter adjustment. This paper is the second part of the two papers focusing on conceptual design, development, and evaluation of performance management for token bus networks. This paper specifically deals with the task of decision making which utilizes the principles of stochastic optimization and learning automata. The developed algorithm can adjuxt four timer settings of a token bus protocol based on the result of performance evaluation. The overall performance management has been evaluated for its efficacy on a network testbed.

  • PDF

Decision Making of Seismic Performance Management Using Seismic Risk Assessment (지진위험도평가 방법을 이용한 내진성능관리 의사결정)

  • Kim, Dong Joo;Choi, Ji Hye;Kim, Byeong Hwa
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.23 no.6
    • /
    • pp.329-339
    • /
    • 2019
  • The strategy for the management of earthquakes is shifting from post recovery to prevention; therefore, seismic performance management requires quantitative predictions of damage and the establishment of strategies for initial responses to earthquakes. Currently, seismic performance evaluation for seismic management in Korea consists of two stages: preliminary evaluation and detailed evaluation. Also, the priority of seismic performance management is determined in accordance with the preliminary evaluation. As a deterministic method, preliminary evaluation quantifies the physical condition and socio-economic importance of a facility by various predetermined indices, and the priority is decided by the relative value of the indices; however, with the deterministic method it is difficult to consider any uncertainty related to the return-year, epicenter, and propagation of seismic energy. Also this method cannot support tasks such as quantitative socio-economic damage and the provision of data for initial responses to earthquakes. Moreover, indirect damage is often greater than direct damage; therefore, a method to quantify damage is needed to enhance accuracy. In this paper, a Seismic Risk Assessment is used to quantify the cost of damage of road facilities in Pohang city and to support decision making.

MAINTENANCE PERFORMANCE EVALUATION OF THE BUILDINGS IN THE DESIGN PHASE

  • Hakyu Baeck;Chansik Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1138-1143
    • /
    • 2005
  • As the importance of building maintenance is being emphasized, studies regarding the efficient building maintenance focus on the evaluation of the maintenance plan, implementation and its cost only while the evaluation of the maintenance performance is nearly ignored. At this point when the importance is placed on the performance design we need to have methods to improve maintenance performance of the buildings in Design Phase. The purpose of this study was to set the design evaluation items to improve the maintenance performance of the buildings. Through the review of the existing literature, we set the concept of the maintenance performance and suggested evaluation items to evaluate the maintenance performance through the analysis of domestic and overseas certification and design guidelines.

  • PDF

A Research of EA's Expanded Utilization for Management Evaluation of Public Agencies (공공기관 경영실적 평가에 대한 EA의 광범위한 활용 연구)

  • Lee, Hun Jung
    • Journal of Information Technology and Architecture
    • /
    • v.11 no.3
    • /
    • pp.271-283
    • /
    • 2014
  • The government has conducted a management evaluation for business management and main business to establish autonomous responsibility management system of public agencies. And many public agencies build and operate EA for alignment of strategy and technology, information resources management, IT standardization. There are many similarities between management evaluation and EA, such as BSC-based performance management, based on the PDCA management procedures can improve, etc. This paper analyzes the similarities and relationships between the two institutions, research ways to apply to management evaluation in the EA in terms of resource management, strategic management, and performance management. Through this expanded utilization of EA and propose a ways to systematically preparing management evaluation and to operating the performance-based management system.

Quality Management Performance Evaluation Using A Computer Support System (컴퓨터 지원시스템을 활용한 품질경영 성과측정)

  • Shin, Wan-Seon;Kang, Eun-Kyung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.4
    • /
    • pp.529-537
    • /
    • 1998
  • Appropriate performance evaluation is a key successful factor for continuous improvement and systematic management support in the implementation of quality management. This research deals with the development of a computer support system for performance evaluation of quality management and its application to a real world problem. It, first, investigates existing performance evaluation methods and classifies them into three styles. A number of key factors for designing computer support systems are then elicited by analyzing the characteristics of the existing methods in terms of the requirements needed for a successful evaluation tool. The computer support system is designed by incorporating the key factors in the system design process and it is implemented as a network version. Finally, a case study is performed in order to verify the proposed support system. The pros and cons of the system are also discussed.

  • PDF

Development and Management of Performance Indicators of Local Government for Citizen's Communication (지방정부의 소통성과지표 개발 및 관리방안에 관한 연구)

  • Chai, Eunkyong;Lee, Chang Kil
    • Journal of Urban Science
    • /
    • v.7 no.2
    • /
    • pp.11-19
    • /
    • 2018
  • Local governments in South Korea are making efforts to promote highly effective policies through activating communication with citizens as a major innovation strategy. The performance evaluation system includes new performance indicators related to communication with citizens. This is a change to build a consumer-centered performance management system. The purpose of this study is to present guidelines when developing and applying the communication indicators promoted by local governments with interest. For this purpose, the development scope and management methods of the communication performance indicators are presented. For communication performance management, this study emphasized building a strategy planning based performance management system, presenting information that can be understood by citizens, complying with the development procedures of performance indicators, and improving qualitative indicators. In addition, for effective performance management, this study presented the decision-makers' strong willingness, gradual expansion of communication evaluation, establishment in organizational performance culture, and so on.

A Study on the Previous Evaluation Model for Safety Performance of Construction Companies (건설회사의 사전 안전성 평가모델에 관한 연구)

  • 손창백;홍성호
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.2
    • /
    • pp.73-78
    • /
    • 2003
  • In order to improve the safety performance oi construction projects, effective and corporative safety management program between head office and job site must be implemented. And its performance must be measured and analyzed for the identification of the problems in the safety management area. This study proposes a previous evaluation model of safety performance for the large construction firm in order to enhance their safety level. The fundamental data for proposed model is based on the past research(Son 2002), which is structured of evaluation criteria. weighted factor. statistical evaluation formula. The model would help the firm management in identifying the weak areas of safety performance in terms of the degree performing certain safety tasks. It is expected that the model could contribute to achieving the "zero accident" level.ot; level.