• Title/Summary/Keyword: major causative factors

Search Result 37, Processing Time 0.025 seconds

An Evaluation Model for Human Attributes of Industrial Accidents (인적 요인을 중심으로 하는 산업재해 평가 모델에 대한 연구)

  • Bae, Sung-Kyu;Park, Dong-Hyun
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.4
    • /
    • pp.155-163
    • /
    • 2003
  • The intensity of industrial accidents has been increased while the number of industrial accidents has been decreased in theses days. It represents that we need safety guidelines based on personal attributes as well as physical attributes. This study tries to identify major causative factors for industrial accidents and to suggest an evaluation model based on personal attributes. Specifically, relationship between self-efficacy belief associated with industrial safety and other relative personal attributes has been analyzed. First, FGI(Focus Group Interview) was conducted to identify important personal attributes of industrial accidents. The questionnaire was prepared based on the results of FGI and was applied to identifying personal attributes. The relationship between personal attributes identified in this study and self-efficacy belief was assessed using fuzzy logic and fault tree analysis. The results of the assessment showed that self-efficacy belief was closely associated with industrial accidents. Specifically, workers with accident experience had higher level of self-efficacy beliefs than workers without accident experience.

Stochastic Strong Ground Motion Simulation at South Korean Metropolises' Seismic Stations Based on the 2016 Gyeongju Earthquake Causative Fault (2016년 경주지진 원인단층의 시나리오 지진에 의한 국내 광역도시 지진관측소에서의 추계학적 강진동 모사)

  • Choi, Hoseon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.25 no.6
    • /
    • pp.233-240
    • /
    • 2021
  • The stochastic method is applied to simulate strong ground motions at seismic stations of seven metropolises in South Korea, creating an earthquake scenario based on the causative fault of the 2016 Gyeongju earthquake. Input parameters are established according to what has been revealed so far for the causative fault of the Gyeongju earthquake, while the ratio of differences in response spectra between observed and simulated strong ground motions is assumed to be an adjustment factor. The calculations confirm the applicability and reproducibility of strong ground motion simulations based on the relatively small bias in response spectra between observed and simulated strong ground motions. Based on this result, strong ground motions by a scenario earthquake on the causative fault of the Gyeongju earthquake with moment magnitude 6.5 are simulated, assuming that the ratios of its fault length to width are 2:1, 3:1, and 4:1. The results are similar to those of the empirical Green's function method. Although actual site response factors of seismic stations should be supplemented later, the simulated strong ground motions can be used as input data for developing ground motion prediction equations and input data for calculating the design response spectra of major facilities in South Korea.

Factors Influencing Ventilator-Associated Pneumonia in Cancer Patients

  • Park, Sun-A;Cho, Sung Sook;Kwak, Gyu Jin
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.15 no.14
    • /
    • pp.5787-5791
    • /
    • 2014
  • Background: With increasing survival periods and diversification of treatment methods, treatment of critically ill cancer patients has become an important factor influencing patient prognosis. Patients with cancer are at high risk of infections and subsequent complications. This study investigated the incidence and factors contributing to the development of ventilator-associated pneumonia (VAP). Materials and Methods: This retrospective study investigated the incidence of VAP and factors leading to infection in patients admitted to the intensive care unit (ICU) of a cancer center from January 1, 2012 to December 31, 2013. Results: The incidence of VAP was 2.13 cases per 1,000 days of intubation, and 13 of 288 patients (4.5%) developed VAP. Lung cancer was the most common cancer associated with VAP (N=7, 53.9%), and longer hospital stays and intubation were associated with increased VAP incidence. In the group using a "ventilator bundle," the incidence was 1.14 cases per 1,000 days compared to 2.89 cases per 1,000 days without its use; however, this difference was not statistically significant (p=0.158). Age (${\geq}65$, OR=5.56, 95% confidence interval [CI]=1.29-23.95), surgery (OR=3.78, 95%CI=1.05-13.78), and tracheotomy (OR=4.46, 95%CI=1.00-19.85) were significant VAP risk factors. The most common causative organisms were methicillin-resistant Staphylococcus aureus (MRSA) and Pseudomonas aeruginosa (N=4, 30.8% each), followed by Acinetobacter baumannii and Candida albicans (N=2, 15.4% each). Conclusions: The incidence of pneumonia among critically ill cancer patients is highest in those with lung cancer, but lower than among non-cancer patients. The length of hospital stay and time on mechanical ventilation are important risk factors for development of VAP. Although not statistically significant, "ventilator bundle" care is an effective intervention that delays or reduces incidence of VAP. Major risk factors for VAP include age (${\geq}65$ years), surgery, and tracheostomy, while fungi, gram-negative bacteria, and multidrug-resistant organisms were identified as the major causative pathogens of VAP in this study.

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

Fall-Down Injuries in children in Treated at the Emergency Department; Preventable Aspects (학령 전 아동에서의 추락 손상의 특징 : 예방적 측면)

  • Kim, Sun-Deok;Jung, Si-Young;Jung, Koo-Young
    • Journal of Trauma and Injury
    • /
    • v.23 no.2
    • /
    • pp.96-101
    • /
    • 2010
  • Purpose: This study was conducted in order to evaluate the epidemiological characteristics of?children with fall-down injuries according to age groups and to analyze the major trauma groups that were treated at the emergency room (ER). Methods: Among 1,222 children under age 6 who were treated at the ER from January 2008 to December 2009, a retrospective study was conducted through examination of medical records. The children were classified by age into 3 groups: infant, toddler, and pre-schooler. In each group, the differences between the causative factors that led to the fall-down injuries were analyzed. Also, ISS (Injury Severity Score) score above 4 was classified as major trauma, and an ISS score 0-1 was classified as a minor trauma. The relationship between major trauma and age group was also analyzed. Results: Through an analysis of child fall-down injuries, men (56.6%), toddler (47.3%), head-related symptoms (72.9%), furniture-related traumas (80.2%), and falls from less than a 1-m height (69.9%) were found to be common factors. Furthermore, in radiological studies, fractures and brain hemorrhages accounted for 16.9% of major traumas, and simple skull fractures were the most common (21.4%). Distributed according to age group, the factors relevant to fall injuries were fall height and head-related symptoms for infants, accident site, fall height and head-related symptoms for toddlers, and accident site for pre-schoolers (p<0.05). Also, headrelated symptoms and fall height were independent factors of major trauma in all age groups. However, major traumas (17.3%) were related to dumped trauma, fall height and accident site (p<0.05). Conclusion: This study was mainly about head-related injuries, and toddler were most common victims. The relevant factors for the major trauma were falling height for infants, accident site and falling height for toddlers, and accident site, falling height for pre-schoolers.

Delay Factors in Building Construction Projects in Rwanda

  • Umuhoza, Esperance;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.5
    • /
    • pp.467-475
    • /
    • 2019
  • Delay is one of the most critical issues for construction projects and leads to huge losses in both developing and industrialized countries. The construction sector in Rwanda, a rapidly-developing nation, is no exception. Delays can be mitigated only once we have identify their primary causes, and these may not be the same in each region. This study aims to ascertain the main critical factors responsible for delays in building construction in Rwanda through an intensive literature review and questionnaire survey. A total of 40 delay causative factors were obtained from a literature review and were further classified into nine major categories. The questionnaire survey was distributed to about 80 respondents from clients, contractors, and consultants. From the list of 40 different factors, the top twelve most critical causes were identified as stoppage of work due to cash flow constraints, delay in approving design documents, confidentiality of physical plan, price fluctuations and delay in approving significant change, change orders, delay in performing inspections, Ineffective project planning, inadequate drawing details, unqualified labor, lack of materials on the market and dishonesty.

Toxicity Assessment of Heavy Metals in Shihwa Lake and Its Tributaries using the Algae (조류를 이용한 시화호 및 시화호 유입수 내 중금속 물질의 독성 평가 연구)

  • Woo, Minhui;Lee, Gyuyoung;Kim, Jihye;Lim, Jihyun;Lee, Yong-Woo
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.2
    • /
    • pp.171-177
    • /
    • 2012
  • This research investigates how using algae as an ecotoxicological test species is easier than using daphnia for identifying toxic causative substances. From the results of the ecotoxicity measurements on the Shihwa lake and its tributaries, heavy metals were considered as one of major factors in causing toxicity. The algae ecotoxicity value was 9.6 while the daphnia ecotoxicity value was 0.8 in the Jeongwang stream. By using algae as the test species, we could identify the toxicity that causes heavy metals which might otherwise have been missed with only daphnia. The results from the EDTA addition test showed that zinc and copper were the main toxic causative substances in the Jeongwang stream and Gunja stream.

A Study on the Gymnodinium nagasakiense Red-Tide in Jinhae Bay of Korea (진해만의 Gymnodinium nagasakiense 적조에 관한 연구)

  • Lee, Jin-Hwan;Kwak, Hi-Sang
    • The Korean Journal of Ecology
    • /
    • v.9 no.3
    • /
    • pp.149-160
    • /
    • 1986
  • Relationship between the causative organi는 of red-tide and environmental factors had been ecologically dealt wtih. The surveys were conducted at seven station in Jinhae Bay from July to September 1981. The water temperature and salinity had wide range, i.e. 23.3~29.3$^{\circ}C$ and 19G.78~31.29$\textperthousand$, but several chemical factors remarkably fluctuated; dissolved oxygen 102.9~210.4%, COD 2.10~8.96mg$O_2$/l, pH 8.1~9.4, $NO_3$-N trace~1, 052$\mu$g/l, $PO_4$-P 0.6~58.9$\mu$g/l and chlorophyll-a 2.18~290.5mg/$m^3$ in the observed area. The red-tide was mainly caused by two dinoflagellata taxa throughout major outbreaks occurred in July through September. Leading species of red-tide were Gymnodinium nagasakiense belong to the ajor species. During the surveyed period, cell nubers of the causative organisms of the red-tide extensively varied from 3${\times} /10^4$ cells/l to $1.5\times10^7 $cells/l with moths and stations; Prorocentrum spp. 0.3~12.5$\times\10^5$ cells/l in July; Gymnodinium nagasakiense 0.2~5.9$\times10^6 cells/l, 1.1~4.7$\times10^6$ cells/l, and 0.2~15.1$\times10^6$ cells/l in July, August, and September, respectively. Gymnodinium nagasakiense red-tide seemed to be caused by the high water temperature in summer, unusually low salinity due to heavy rains, and the concentrated nutrients for phytoplankton supplied with the municipal sewages from the urban areas and the wastewaters from the industrial complexes.

  • PDF

Molecular cloning, Expression and purification of Anthrax toxin from Bacillus anthracis

  • Yoon, Moon-Young
    • Journal of Photoscience
    • /
    • v.9 no.2
    • /
    • pp.323-325
    • /
    • 2002
  • Bacillus Anthracis is the causative agent of anthrax. The major virulence factors are a poly-D glutamic acid capsule and three-protein component exotoxin, which is collectively known as anthrax toxin, protective antigen (PA, 83 kDa), lethal factor (LF, 90 kDa), and edema factor (EF, 89 kDa). These three proteins individually have no known toxic activities, but in combination with PA form two toxins (lethal toxin and edema toxin), causing different pathogenic responses in animals and cultured cells. However, it remains to be elucidated for pathogenic mechanism of anthrax toxin. In this study, we constructed toxin component in bacterial overexpression system and purified the native toxin from Bacillus anthracis delta sterne F32 using FPLC system. Recombinant toxin showed high homogeneity and rapid purification processes. Also, this recombinant toxin was comparable to B. anthracis native toxin in terms of cytotoxic effects on cultured cell lines.

  • PDF

Farm evaluation program on swine health management to control piglets' diarrhea (돼지 설사병 방제 양돈장 위생관리 프로그램 개발)

  • Park, Jong-myung;Hwang, Eui-kyung;Kim, In-cheon;Rhee, Jae-chin;Chung, Hyun-kyu;Kang, Ku-hwan
    • Korean Journal of Veterinary Research
    • /
    • v.38 no.1
    • /
    • pp.201-208
    • /
    • 1998
  • Piglets' diarrhea is one of the major causes of economic loss in Korean swine industry. To prevent this serious and persistant problem, we have developed systemic farm evaluation and analysis program. The program consists of the checklist and the computerized program. The items of the checklist are selected on the basis of various causative factors related with the piglets' diarrhea including sanitational status, nutritional management, or farm environment. The checklist is composed of 30 items including 6 factors on facility, 8 factors on environment, 6 factors on nutrition and 10 factors on sanitation, respectively. Minimum 1 to maximum 10 points was assigned to each item depending on level or status of farm. The scores calculated by sum of points obtained from each item could find out the problems which the farm was confronted with. To investigate the applicability of a program 150 swine farms raising over 500 heads were selected from 7 provinces throughout the country and surveyed. There were significant correlations between the piglets' diarrhea and the scores of the checklist. Based on above results we revised the checklist which consisted of 22 items including 5 factors on facility, 7 factors on environment, 3 factors on nutrition and 7 factors on sanitation. After that we composed a computerized diagram out of each point of an item which showed and indicated weak factors to be improved promptly. Our present study suggested that this newly established swine farm evaluation program would be a very efficient way to find out the problems and support the systemic control program of the piglets' diarrhea for swine farms.

  • PDF