In this paper, to systematically assess the abandonment risk of main control room (MCR) fire, fire simulations with Fire Dynamics Simulator were performed and abandonment probabilities were estimated for the MCR bench-board fire of domestic reference nuclear power plant. The fire simulation scenarios performed in this study included propagating and non-propagating fires of the MCR bench-board, and the availability and unavailability of heating, ventilation, and air conditioning system (HVACS). The following results were obtained. First, temperature was the major abandonment impact factor for the MCR bench-board fire if the HVACS was available and optical density was that if the HVACS was unavailable. Second, the fire scenario contributing the MCR bench-board fire abandonment risk was identified to be only the propagating fire. Third, it was confirmed that the abandonment probability of the MCR bench-board fire for domestic reference nuclear power plant could be reduced by using the fire modeling.
Kim, Sa-Kil;Byun, Seong-Nam;Lee, Dhong-Hoon;Jeong, Choong-Heui
IE interfaces
/
v.22
no.2
/
pp.104-115
/
2009
The objective of the study is to evaluate the effectiveness of Crew Resource Management (CRM) training program for operators in the Main Control Room (MCR) simulator of APR-1400 Nuclear Power Plant. The experiments were conducted for two different crews of operators performing six different emergency operating scenarios during four-week period. Each crew consisted of the five operators: senior reactor operator, safety technical advisor, reactor operator, turbine operator, and electric operator. All crews (Crew A and B) participated in the training program for the technical knowledge and skills which were required to operate the simulator of the MCR during the first week. To verify the effectiveness of the CRM training program; however, only Crew A was selected to attend the CRM training after the technical knowledge and skills training. The results of the experiments showed that the CRM training program improved the individual attitudes of Crew A significantly. Team skills of Crew A were found to be significantly better than those of Crew B. The CRM training did not have positive effects on enhancing the individual performance of Crew A; however, as compared to that of Crew B. Implication of these findings was discussed further in detail.
Designing and constructing a proper simulator for real power plants requires extensive research in human engineering and computer science and integration of different fields of technologies such as system analysis, operational knowledge for nuclear plant, etc. A full scope replica type simulator for nuclear power plant is developed. The simulator has the same feature and operational functions as one in the main control room (MCR) of a reference power plant. The simulator provides the necessary training to recover or reduce damages from accidents that usually are unpredictable. This paper describes the configurations and characteristics for the simulator that is developed for Younggwang Nuclear Power Plant #3,4 which is the basic model of the Korean Nuclear Power Plant. The paper also describes technical aspects of Auto Code Generator that is used for developing the simulator. The successful development of the simulator will contribute to improve safety in operation of nuclear power plants.
In a training simulator for power plant, operator's action in the MCR(Main Control Room) are given to plant process and computer system model as an inputs, and the same response as in real power plant is provided in real time. Inter-process communication and synchronization are especially important among various inputs. In the plant simulator, to simulate the digital control system such as FOXBORO SPEC-200 Micro control system, modification and adaptation of control card(CCC) and its continuous display station(CDS) is necessary. This paper describes the modeling and simulation of FOXBORO SPEC-200 Micro control system applied to Younggwang nuclear power plant unit #3 & 4, and its integration process to the full-scope replica type training simulator. In a simulator, display station like CDS of FOXBORO SPEC-200 Micro control system is classified as ITI(Intelligent Type Instrument), which has a micro processor inside to process information and the corresponding alphanumeric display, and the stimulation of ITI limits the important functions in a training simulator such as backtrack, replay, freeze and IC reset. Therefore, to achieve the better performance of the simulator, modification of CDS and special firmware is developed to simulate the FOXBORO SPEC-200 Micro control system. Each control function inside control card is modeled and simulated in generic approach to accept the plant data and control parameter conveniently, and debugging algorithms are applied for massive coding developed in short period.
Journal of Institute of Control, Robotics and Systems
/
v.4
no.3
/
pp.392-399
/
1998
A full-scope replica type simulator whose MCR(main control room) has the same features and operation functions as MCR of the reference power plant has been developed for a fossil power plant. This simulator was developed with the model of Poryung Fossil Power Plant #3,4 which is the standard model of the Korean fossil power plant. It is the first localized simulator for the supercritical, variable boiler pressure type fossil power plant. The simulator provides various kinds of accidents which are in normal plant operation and thus enables operators to recover or reduce possible damages. To design and develop this kind of simulator, we need to integrate high technologies such as system analysis, plant operation and system integration of mechanics, physics, computer science. CASE(Computer Aided Software Engineering) tools were used to develop the dynamic model. This simulator will greatly contribute to the improvement of the safety and efficiency of the fossil power plant by implementing operator training. In this paper, the outline of software and hardware configuration and characteristics of the simulator are described, and the results of 30%, 50%, 75%, 100% load operation test will be discussed.
발전소 운전원 훈련용 시뮬레이터는 중앙제어실(MCR:Main Control Room) 운전원의 운전결과가 실시간 운영체계하에 발전소 프로세스 모델 및 컴퓨터 시스템과 통합되어 실제 발전소와 같은 반응을 운전원에게 제공하여야 한다. 따라서 시뮬레이터에는 프로세스의 동특성 이외에도 제어시스템의 모델링 및 운전원과 인터페이스되는 제어기들이 실제적으로 구성되어야하며, 이들 제어기와 컴퓨터시스템간 다양한 입력간의 통신 및 동기(Synchronization)가 중요하다. 본 논문에서는 원자력 발전소 시뮬레이터에서 쓰이는 지능형 계기(Intelligent Type Instrument)로 분류된 기기를 살펴보고 시뮬레이션을 위해 개발 구현된 방법들을 기술하고자한다.
Proceedings of the Korea Society for Simulation Conference
/
1998.03a
/
pp.86-90
/
1998
The safety and reliability of nuclear power plant operations relies heavily on the plant operators ability to respond to various emergency situations. It has become standard industry practice to utilize simulators to improve the safety and reliability of nuclear power plants operations. The simulators built for Younggwang#3,4, which is the basic model of the Korean Nuclear Power Plant design, has been developed precisely for this purpose. Dynamic Model and Display Model are developed under US3(UNIX Simulation Software Support System) environment in simulator for Younggwang#3,4. Since these two models are developed under each own operating system, it is necessary to develop a method for transporting data between these two systems. This paper descirves communication environment between Dynamic Model and Display Model, and addresses a file generation method for the Display Model, which will be necessary for designing MMI of MCR(Main Control Room) in the furture.
Kim, HyungJun;Kim, Seunghwan;Park, Jinkyun;Lee, Eun-Chan;Lee, Seung Jun
Nuclear Engineering and Technology
/
v.52
no.6
/
pp.1180-1187
/
2020
A team of operators is required for nuclear power plant operation, and communication between the operators is an important aspect of the team's ability to successfully carry out tasks. It has been difficult to evaluate the quality of this communication though, and as the relationship between communication quality and team performance has yet to be clarified, it has not been applied to most human reliability analysis (HRA) methodologies. This study investigates the relationship between the quality of communication and team performance using data from a full-scope training simulator of a digital main control room (MCR). Two important characteristics of communication were considered to determine quality: each operator's ability to self-confirm the status of a given task in a digital MCR, and the type of communication, as divided into 1-way, 2-way, and 3-way between operators. To measure team performance, the concept of an unsafe act was employed, which is defined as a human error that has the potential to negatively affect plant safety. Analysis results showed that the communication quality and team performance were related to each other. With this more clearly defined relationship, the results of this study can be applied to related performance shaping factors to improve HRA.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.8
no.4
/
pp.319-327
/
2010
A nuclear plant ESF ACS simulator was designed, built, and verified to perform experiment related to ESF ACS of nuclear power plants. The dimension of 3D CAD model was based on drawings of the main control room(MCR) of Yonggwang units 5 and 6. The CFD analysis was performed based on the measurement of the actual flow rate of ESF ACS. The air flowing in ACS was assumed to have $30^{\circ}C$ and uniform flow. The flow rate across the HEPA filter was estimated to be 1.83 m/s based on the MCR ACS flow rate of 12,986 CFM and HEPA filter area of 9 filters having effective area of $610{\times}610mm^2$ each. When MCR ACS was modeled, air flow blocking filter frames were considered for better simulation of the real ACS. In CFD analysis, the air flow rate in the lower part of the active carbon adsorber was simulated separately at higher than 7 m/s to reflect the measured value of 8 m/s. Through the CFD analyses of the ACSes of fuel building emergency ventilation system, emergency core cooling system equipment room ventilation cleanup system, it was confirmed that all three EFS ACSes can be simulated by controlling the flow rate of the simulator. After the CFD analysis, the simulator was built in nuclear grade and its reliability was verified through air flow distribution tests before it was used in main tests. The verification result showed that distribution of the internal flow was uniform except near the filter frames when medium filter was installed. The simulator was used in the tests to confirm the revised contents in Reg. Guide 1.52 (Rev. 3).
원자력 교육원 #2(KNPEC-2) 시뮬레이터는 1980년도 중반에 웨스팅하우스에 의해 공급되어 계속 사용되어 오다가 현재 성능개선 연구가 진행 중이다. 이번 성능개선을 통해 기존의 컴퓨터 시스템(Gould MPX)와 소프트웨어의 전면 교체가 이루어지고 있으며 최적 계산 코드를 이용한 실시간 열수력 모델 (ARTS; Advanced Real-Time Thermal-Hydraulics Simulation) 개발 , 2-Group 3D 실시간 노심모델(REMARK ; REal Time Multigroup Advanced Reactor Kinetics)를 이용한 노심 주기개선 (Cycle Update) 가상현실 기술 등을 이용한 컴퓨터 교육지원 시스템(CATS: Computer Assister Training System)등 새로운 시도가 이루어지고 있으며 본 논문은 이러한 새로운 시도가 이루어지고 있으며 본 논문은 이러한 새로운 시도들 및 그 결과에 대해 기술하고 있다. 기준발전소(Reference Plant)인 영광 1호기 12주기의 노심모델로 주기개선(Cycle Update)을 위한 REMARK의 입력자료 생성을 위해 핵설계 전산체계인 APA(ALPHA-PHOENIX-ANC) 시스템의 출력으로부터 자동으로 REMARK 입력데이타를 생성하기 위한 GUI툴 개발하였다. 또 이를 이용하여 개발된 노심모델은 최적계산코드(RETRAn 3D) 의 열수력 해법을 이용하여 개발된 NSSS 열수력코드(ARTS) 와 결합(Integration) 되어 안정 및 과도 상태 시험에 사용되었으며 원자로 냉각재 펌프 정지등의 몇 가지 과도 시험 계산결과 기존 해석 결과와 잘 일치하였다 중앙제어실(MCR; Main Control Room)내의 운전원 행동만 훈련하도록 되어있는 기존시뮬레이터의 한계를 극복하기 위해 가상현실 (VR) 저작도구를 이용한 발전소 현장 내부를 표현하는 가상발전소 (Virtual Plant) 발전소 현장에 소재하여 기존 시뮬레이터의 모의한계 밖에 있던 패널을 표현한 가상판넬(Virtual Panel)등과 강의실에서 발전소 모의 훈련을 가능케 하기 위해 가상현실 기술을 이용한 컴퓨터 지원 교육훈력 시스템(CATS ; Computer Assister Training System)을 개발 중이며 일부 개발부분을 소개하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.