• 제목/요약/키워드: machine utilization

검색결과 404건 처리시간 0.031초

A Heuristic Time Sharing Policy for Backup Resources in Cloud System

  • Li, Xinyi;Qi, Yong;Chen, Pengfei;Zhang, Xiaohui
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제10권7호
    • /
    • pp.3026-3049
    • /
    • 2016
  • Cloud computing promises high performance and cost-efficiency. However, most cloud infrastructures operate at a low utilization, which greatly adheres cost effectiveness. Previous works focus on seeking efficient virtual machine (VM) consolidation strategies to increase the utilization of virtual resources in production environment, but overlook the under-utilization of backup virtual resources. We propose a heuristic time sharing policy of backup VMs derived from the restless multi-armed bandit problem. The proposed policy achieves increasing backup virtual resources utilization and providing high availability. Both the results in simulation and prototype system experiments show that the traditional 1:1 backup provision can be extended to 1:M (M≫1) between the backup VMs and the service VMs, and the utilization of backup VMs can be enhanced significantly.

셀형 제조시스템설계를 위한 machine-part의 그룹형성에 관한 연구 (A study on machine-part group formation for designing the cellular manufacturing systems)

  • 김성집;김낙현
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.125-130
    • /
    • 1996
  • This study is concerned with a heuristic algorithm that can make effectively the machine-part grouping in early stage for designing cellular manufacturing systems. By enhancing the Close Neighbour Algorithm(CNA), the proposed algorithm is concerned with making the machine-part grouping that can maximize machine utilization and minimize part's intercell movement by reducing exceptional elements. The algorithm is tested against existing algorithms in solving several machine-part initial matrices extracted from references and obtained by using random number. Test results shows that a solution matrix of the algorithm has superior grouping efficiency to Close Neighbour Algorithm.

  • PDF

유연 Job Shop 일정계획의 유연성에 대한 시뮬레이션 (Simulation for Flexibility of Flexible Job Shop Scheduling)

  • 김상천;김정자;이상완;이성우
    • 한국산업융합학회 논문집
    • /
    • 제4권3호
    • /
    • pp.281-287
    • /
    • 2001
  • Traditional job shop scheduling is supposed that machine has a fixed processing job type. But actually the machine has a highly utilization or long processing time is occurred delay. Therefore product system is difficult to respond quickly to the change of products or loads or machine failure etc. Here we use flexible job shop which is supposed that a machine has several jobs by tool change. The heuristic for the flexible job shop scheduling has to solve two problems. One is a routing problem which is determine a machine to process job. The other is sequencing problem which is determine processing sequence. The approach to solve two problems arc a hierarchical approach which is determined routing and then schedule, and a concurrence approach which is solved concurrently two problems by considering routing when it is scheduled. In this study, we simulate for flexibility efficiency fo flexible job shop scheduling with machine failure using hierarchical approach.

  • PDF

Dynamic Scheduling of FMS Using a Fuzzy Logic Approach to Minimize Mean Flow Time

  • Srinoi, Pramot;Shayan, Ebrahim;Ghotb, Fatemeh
    • Industrial Engineering and Management Systems
    • /
    • 제7권1호
    • /
    • pp.99-107
    • /
    • 2008
  • This paper is concerned with scheduling in Flexible Manufacturing Systems (FMS) using a Fuzzy Logic (FL) approach. Four fuzzy input variables: machine allocated processing time, machine priority, machine available time and transportation priority are defined. The job priority is the output fuzzy variable, showing the priority status of a job to be selected for the next operation on a machine. The model will first select the machines and then assign operations based on a multi-criteria scheduling scheme. System/machine utilization, minimizing mean flow time and balancing machine usage will be covered. Experimental and comparative tests indicate the superiority of this fuzzy based scheduling model over the existing approaches.

The feasibility and properties of dividing virtual machine resources using the virtual machine cluster as the unit in cloud computing

  • Peng, Zhiping;Xu, Bo;Gates, Antonio Marcel;Cui, Delong;Lin, Weiwei
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제9권7호
    • /
    • pp.2649-2666
    • /
    • 2015
  • In the dynamic cloud computing environment, to ensure, under the terms of service-level agreements, the maximum efficiency of resource utilization, it is necessary to investigate the online dynamic management of virtual machine resources and their operational application systems/components. In this study, the feasibility and properties of the division of virtual machine resources on the cloud platform, using the virtual machine cluster as the management unit, are investigated. First, the definitions of virtual machine clusters are compared, and our own definitions are presented. Then, the feasibility of division using the virtual machine cluster as the management unit is described, and the isomorphism and reconfigurability of the clusters are proven. Lastly, from the perspectives of clustering and cluster segmentation, the dynamics of virtual machines are described and experimentally compared. This study aims to provide novel methods and approaches to the optimization management of virtual machine resources and the optimization configuration of the parameters of virtual machine resources and their application systems/components in large-scale cloud computing environments.

영구자석 사용 효율 향상을 위한 IPM 전동기의 최적 토폴로지 (Topology Optimal Interior Permanent Magnet Machine to Improve the Utilization Ratio of Permanent Magnet)

  • 도욱;장전해;주립훈;고창섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.862-863
    • /
    • 2015
  • This paper presents an improved estimation procedure for the contribution to no-load flux linkage created by the permanent magnet (PM) in interior permanent magnet synchronous machines. In the proposed method, the saturation effect in stator and rotor cores are taken into account by utilizing the frozen permeability method (FPM). This improved procedure can evaluate the contribution for each local element in the PM to the no-load flux linkage. According to the analysis results, an effective PM topology optimal design can be carried out to achieve high utilization ratio of PM in the machine. In order to determine the threshold of the low contribution of PM for removing, one multi-objective optimization model is proposed. Based on the optimal threshold, the final optimal topology design of PM can be achieved.

  • PDF

수직구의 상향굴착을 위한 RBM 굴진성능의 분석 (Analysis of RBM한s Penetration Capacity for Upward reaming of Shaft)

  • 이석원;조만섭;서경원;배규진
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.157-164
    • /
    • 2002
  • Based on the results of prototype air-shaft construction, penetration capacity of RBM(Raise Boring Machine) was analyzed and compared with TBM(Tunnel Boring Machine) performance in this study. Utilization, down time, net penetration rate and advance rate were evaluated and compared. By conducting the laboratory tests for rock properties with the analysis of penetration capacity, relation of penetration capacity and geotechnical parameters was studied. The results showed that much more higher value of utilization, however lower value of net penetration rate for RBM was obtained compared to those of TBM. In addition, as the strength of rock penetrated increased, higher value of net penetration rate was obtained contrarily to the results of TBM performance. Finally, new relationship between total hardness and net penetration rate for weak and weathered rock was derived from these results.

  • PDF

항공기 부품의 생산 및 정비를 위한 공정 계획 시스템의 개발 (Development of a CAPP System for Production and Maintenance of Aircraft Parts)

  • 노경윤;강수준
    • 한국군사과학기술학회지
    • /
    • 제2권2호
    • /
    • pp.83-91
    • /
    • 1999
  • Dynamic characteristic of manufacturing stage is understood and the utilization of each machine is maximized by developing on-line dynamic CAPP system to consider the overloads in the aircraft part manufacturing line. In this paper, a scheme of production planning and scheduling system was proposed through inspection about some predeveloped CAPP system. Developed production planning and scheduling system included process planning module. After precise inspection of some FMS line schema at domestic heavy industry, optimized FMS line was applied to aircraft part manufacturing and repairing factory. By virtue of considering overloads of factory and machine through on-line dynamic CAPP system, the utilization of resources is maximized and manufacturing lead time is minimized.

  • PDF

핵연료 계장을 위한 천공조건에 대한 실험적 연구 (An Experimental Study on Drilling Conditions for the Instrumentation of Nuclear Fuel)

  • 홍진태;김가혜;정황영;안성호;정창용
    • 한국정밀공학회지
    • /
    • 제30권1호
    • /
    • pp.113-119
    • /
    • 2013
  • To develop a new nuclear fuel, it needs to make a test fuel rod and carry out burn-up test in the test loop of a research reactor to check the irradiation characteristics of the nuclear fuel. At that time, several sensors such as thermocouples, LVDTs and SPNDs are needed to be attached in and out of the fuel rod and connect them with instrumentation cables. Then, the instrumentation cables deliver the signals measured by the sensors to the measuring device located outside of the reactor pool. In particular, to install a thermocouple in a fuel rod, it needs to drill off holes on the alumina blocks and sintered $UO_2$ pellets. However, because the hardness of a sintered $UO_2$ pellet is 700 Hv (or HRC 61) and that of an alumina block is 1480 Hv, a special drilling machine which adapts a diamond coated drill bit had developed. In this study, several case experiments have been carried out to find an optimal drilling condition of the drilling machine. And, using the optimal drilling condition, minimum numbers of the holes that a drill bit can drill off are verified.

Efficient Idle Virtual Machine Management for Heterogeneous Cloud using Common Deployment Model

  • Saravanakumar, C.;Arun, C.
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제10권4호
    • /
    • pp.1501-1518
    • /
    • 2016
  • This paper presents an effective management of VM (Virtual Machine) for heterogeneous cloud using Common Deployment Model (CDM) brokering mechanism. The effective utilization of VM is achieved by means of task scheduling with VM placement technique. The placements of VM for the physical machine are analyzed with respect to execution time of the task. The idle time of the VMis utilized productively in order to improve the performance. The VMs are also scheduled to maintain the state of the current VM after the task completion. CDM based algorithm maintains two directories namely Active Directory (AD) and Passive Directory (PD). These directories maintain VM with proper configuration mapping of the physical machines to perform two operations namely VM migration and VM roll back. VM migration operation is performed from AD to PD whereas VM roll back operation is performed from PD to AD. The main objectives of the proposed algorithm is to manage the VM's idle time effectively and to maximize the utilization of resources at the data center. The VM placement and VM scheduling algorithms are analyzed in various dimensions of the cloud and the results are compared with iCanCloud model.