• Title/Summary/Keyword: loosening load

Search Result 59, Processing Time 0.02 seconds

Behavior of 2 Arch Tunnel in Sand (사질토지반에서 2 Arch 터널의 거동)

  • Lee, Sang-Duk;Cheon, Eun-Sook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.2
    • /
    • pp.171-182
    • /
    • 2004
  • This study is focused on finding out the mechanical behavior of pillars and the ground adjacent to the tunnel depending on the central tunnel size and the invert during the construction of 2 arch tunnels in the sandy ground. Model tests were performed in the trap door system, which was composed of 3 separately movable plates. Central pillar was installed on the central movable plate to measure the pillar loads during the excavation of pilot tunnel and the main tunnel. The load-transfer and the loosening load were measured at the bottom plates adjacent to the 2 arch tunnels. The ground settlement and displacement of the tunnel lining were also measured. As results, not only pillar load but also the load transfer mechanism was influenced by the construction sequences, central tunnel size, and the invert.

  • PDF

The Experimental Study of Insulation Structure for BOG Re-liquefaction Drum (증발가스 재액화 드럼의 단열구조에 관한 실험적 연구)

  • Kim, Ik-Soo;Jung, Young-Jun
    • Journal of the Korean Institute of Gas
    • /
    • v.25 no.1
    • /
    • pp.7-13
    • /
    • 2021
  • The re-liquefaction drum is a product that installed spray nozzles at the top to directly spray overcooled LNG into evaporative gas and installed demistors to facilitate gas separation, which was developed to increase the re-liquidity efficiency of small scale re-liquefaction facilities. In the hydrostatic test of the drum, no leakage occurred even at a pressure of 1.5 times the design pressure, but during the BOR(Boil Off Rate) test, the bolt loosening occurred due to contraction and expansion by temperature change. For the continued use of the product, insulation construction on flange connections was developed to enable detachment and attachment, and the comparison of heat load with existing insulation confirmed that it was very small compared to the inlet flow rate in the drum.

A STUDY ON SURFACE OF VARIOUS ABUTMENT SCREWS

  • Park Chan-Ik;Chung Chae-Heon;Choi Han-Cheol
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.41 no.3
    • /
    • pp.351-359
    • /
    • 2003
  • Statement of problem: Regardless of any restoration, most of case, we used in screw connection between abutment and implant. For this reason, implant screw loosening has been remained problem in restorative practices. Purpose: The purpose of this study was to compare surface of coated/plated screw with titanium and gold alloy screw and to evaluate physical property of coated/plated material after scratch test in FESEM investigation Material and methods: GoldTite, titanium screw provided by 3i (Implant Innovation, USA) and TorqTite, titanium screw by Steri-Oss (Nobel Biocare, USA) and gold screw, titanium screw by AVANA (Osstem Implant, korea) - were selected for this study. Each abutment screw surface was observed at 100 times, and then screw crest, root, and slope were done more detailed numerical value, at 1000 times with FESEM. A micro-diamond needle was also prepared for the scratch test. Each abutment screw was fixed, micro-diamond scratch the surface of head region was made at constant load and then was observed central region and periphery of fine trace through 1000 times with FESEM. Results: The surface of GoldTite was smoother than that of other kinds of screw and had abundant ductility and malleability compared with titanium and gold screw. The scratch test also showed that teflon particles were exfoliated easily in screw coated with teflon. Titanium screw had a rough surface and low ductility. Conclusion: It was recommended that the clinical use of gold-plated screw would prevent a screw from loosening. CLINICAL IMPLICATIONS Clinical use of gold-plated screw would prevent a screw from loosening because it had abundant ductility and malleability compared with titanium and gold screw.

A study on the review of the Terzaghi's tunnel load theory (Terzaghi 터널토압의 재조명에 관한 연구)

  • Park, Si-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.3
    • /
    • pp.261-268
    • /
    • 2003
  • Terzaghi's tunnel theory has been accepted to calculate tunnel loads conservatively in practical design until now. In this study, Terzaghi's tunnel theory was expanded to the inclined-layer ground with inclination of ground and stratification. Finally a new tunnel load equation was induced utilizing the original Terzaghi's tunnel theory and Terzaghi's tunnel theory was reviewed as well.

  • PDF

A Study on Safety Evaluation of Wheel Using Roller Rig Tester (주행시험기를 이용한 차륜의 안전성 평가에 관한 연구)

  • Ham, Young Sam
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.32 no.7
    • /
    • pp.591-595
    • /
    • 2015
  • The roller rig tester for safety performance evaluation of wheel derailment is a test facility which can give the test load condition to the test wheel, similar to the actual dynamic condition in actual running condition. This study describes the evaluation result on the durability of the resilient wheel equipped with the ring damper and the damping material, and installed in the half part of a full scaled bogie in combination with the primary spring when it rotates under the dynamic condition. The evaluation result on durability of resilient wheel after load test of 2 million cycles shows that the safety of wheel is not affected by the applied load in visual inspection and nondestructive test, however, in the bolt used for fastening the ring damper to the wheel the loosening was found. Accordingly the use of self-locking nut and washer is recommended.

Structural Analysis for Thread Joint Part of Rocket Motor Case Applied Pre-load (초기하중을 받는 로켓모타 케이스 나사체결부의 구조해석)

  • Koo, Song-Hoe;Cho, Won-Man;Lee, Bang-Eop
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.1
    • /
    • pp.144-149
    • /
    • 2007
  • Behaviour of a thread joint of a rocket motor case show complex structural characteristics. Pre-torque must be applied to the threads to prevent the loosening of the interface from the additional pressure load. During the pressurization of the rocket motor case, the jointing face may be opened if the pre-torque were not set properly or the structure may be failed if the local concentrated stress exceeds the strength of the material. In this paper, the structural behaviour of a thread joint of a rocket motor case were analyzed by the finite element method and the results were compared to the experimental ones. A method to set a pre-torque for a thread joint were proposed to ensure the structural safety.

THE EFFECT OF INTERNAL IMPLANT-ABUTMENT CONNECTION AND DIAMETER ON SCREW LOOSENING

  • Ha, Chun-Yeo;Kim, Chang-Whe;Lim, Young-Jun;Jang, Kyung-Soo
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.43 no.3
    • /
    • pp.379-392
    • /
    • 2005
  • Statement of problem. One of the common problems of dental implant prosthesis is the loosening of the screw that connects each component, and this problem is more common in single implant-supported prostheses with external connection, and in molars. Purpose. The purposes of this study were: (1) to compare the initial abutment screw detorque values of the six different implant-abutment interface designs, (2) to compare the detorque values of the six different implant-abutment interface designs after cyclic loading, (3) to compare the detorque values of regular and wide diameter implants and (4) to compare the initial detorque values with the detorque values after cyclic loading. Material and methods. Six different implant-abutment connection systems were used. The cement retained abutment and titanium screw of each system were assembled and tightened to 32Ncm with digital torque gauge. After 10 minutes, initial detorque values were measured. The custom titanium crown were cemented temporarily and a cyclic sine curve load(20 to 320N, 14Hz) was applied. The detorque values were measured after cyclic loading of one million times by loading machine. One-way ANOVA test, scheffe’s test and Mann-Whitney U test were used. Results. The results were as follows : 1. The initial detorque values of six different implant-abutment connections were not significantly different(p>0.05). 2. The detorque values after one million dynamic cyclic loading were significantly different (p<0.05). 3. The SS-II regular and wide implant both recorded the higher detorque values than other groups after cyclic loading(p<0.05). 4. Of the wide implants, the initial detorque values of Avana Self Tapping Implant, MIS and Tapered Screw Vent, and the detorque values of MIS implant after cyclic loading were higher than their regular counterparts(p<0.05). 5. After cyclic loading, SS-II regular and wide implants showed higher detorque values than before(p<0.05).

Effect of various abutment systems on the removal torque and the abutment settling in the conical connection implant systems (원추형 연결 임플란트에서 지대주 종류에 따른 나사풀림과 침하현상에 관한 연구)

  • Lee, Jin-Seon;Lee, Joon-Seok
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.50 no.2
    • /
    • pp.92-98
    • /
    • 2012
  • Purpose: The aim of this study was to evaluate the effects of different abutment materials on abutment screw loosening and settling-down effect in conical connection type implant system. Materials and methods: Three types of abutment, cementation, gold UCLA, and metal UCLA abutment were used. Two UCLA groups were fabricated in a similar pattern to cementation abutment. Type III gold alloy and Nickel-Chromium alloy was used for casting gold UCLA abutment and metal UCLA abutment, respectively. Fixture and abutment were tightened to 30 Ncm by using digital torque controller and re-tightening was conducted with same force after 10 minutes. Digital torque gauge was used to measure loosening torque and fixture/abutment length was measured by digital micrometer. Dynamic loads between 25 N and 250 N were applied with $0^{\circ}$ angle to the abutment axis. After loading, fixture/abutment length was re-measured and amount of settlement was calculated. Loosening torque value was also measured for comparison Results: All three groups showed significant differences of length when comparing before and after loading, but there was no significant difference of settling amount in all groups. Loosening torque values were significantly decreased when comparing before and after loading in all groups($P$<.05). However, there was no significant difference in loss of loosening torque values when compared to groups. Conclusion: In internal conical connection type implants, dynamic load affected on settlement and loosening torque of implant, but there was no differences between abutments materials. Likewise gold UCLA abutment, metal UCLA abutment might be able to withstand functional load.

Behavior of shallow 2-Arch tunnel due to excavation under horizontal discontinuity plane (수평 불연속변 하부에 굴착한 얄은 심도의 2-Arch 터널의 거동)

  • Cheon, Eun-Sook;Kim, Hong-Moon;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.3
    • /
    • pp.227-237
    • /
    • 2005
  • In this study, the behavior of shallow 2-Arch tunnel due to excavation under horizontal discontinuity plane was verified experimentally. The model tests were carried out by varying the overburden height and the location of the discontinuity plane. The model tests followed exactly the real 2-Arch tunnel construction stages. As a result, it is discovered that stress-transfer mechanism and loosening area around the 2-Arch tunnel depends on the overburden heights and the location of the discontinuity plane. And central pillar load is also dependent on overburden height, location of discontinuity plane and construction stages.

  • PDF

Evaluation of Fracture Strength and Screw Loosening of a New Angled Abutment with Angulated Screw Channel (나사 접근 구멍 각도가 조절 가능한 새로운 경사형 지대주의 파절강도 및 나사 풀림력 연구)

  • Jae-Won Choi
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.4_2
    • /
    • pp.623-628
    • /
    • 2023
  • The purpose of this study was to evaluate the fracture strength and removal torque value (RTV) of a conventional angled abutment and a newly developed angled abutment (Beauty up abutment) with an angulated screw access hole. Each abutment was divided into a control group and an experimental group (n = 20, respectively). To measure the fracture strength, the abutment was connected to the internal hex implant with 30 Ncm torque, and a load was applied at 30 degree angle with cross-head speed of 1 mm/min using a universal testing machine according to the ISO 14801:2016 standard. To measure RTV, each abutment was fastened to the implant with 30 Ncm torque. Retightening was performed after 10 minutes, and initial RTV was measured with a digital torque gauge. After retightening, a load of 250 N was applied to the abutment at a 30 degree angle using a chewing simulator. After a total of 100,000 repeated loads, RTV was measured. Statistical analysis was performed using Wilcoxon signed rank test and Mann-Whitney U test (α = .05). The fracture strength of the experimental group was statistically significantly lower than that of the control group (P = .009). There was no significant difference between initial RTV and post-loading RTV between the experimental group and the control group (P = .753, P = .527, respectively), and cyclic loading did not significantly affect RTV in both groups (P = .078).