• Title/Summary/Keyword: loading period

Search Result 632, Processing Time 0.024 seconds

Development of Fatigue Model of Concrete Pavement Considering Environmental Loading (환경하중을 고려한 콘크리트 포장 피로모형의 개발)

  • Lim, Jin Sun;Kim, Yeon Bok;Jeong, Jin Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.819-829
    • /
    • 2008
  • Fatigue cracking occurs over long time period because dynamic strength of slab continuously decreases by vehicle loading repetitively applied to the concrete pavement. To more accurately predict the fatigue life of the concrete pavement, the stress due to environmental loading should be considered prior to calculating the stress due to the vehicle loading because the stress due to temperature and moisture distribution always exists within the slab. Accordingly, a new fatigue model considering the environmental loading was developed in this research by evaluating factors of existing fatigue models most widely used and by making data points from the models. The applicability of the new model was evaluated by performing a fatigue analysis on the general concrete pavement structure using local climatic and traffic conditions in Korea. It was concluded that the top-down cracking due to the tensile stress at top of the slab is dominant cause of the fatigue failure than the bottom-up cracking occurred at bottom of the slab. More advanced fatigue analysis considering vehicle speed is expected by developing this study.

Implant-supported fixed prosthesis restoration of fully edentulous patient using computer-guided implant surgery and immediate loading: A case report (Computer guided implant surgery와 immediate loading을 활용한 무치악 환자의 전악 임플란트 고정성 보철물 수복 증례)

  • Hyeon-Me Sung;Kyoung-Hee Sul;Sun-Woo Kang;Jung-Han Kim
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.62 no.2
    • /
    • pp.131-139
    • /
    • 2024
  • In a edentulous patient, various methods can be employed for prosthetic treatment using implants, such as implant-supported fixed prostheses, overdentures, hybrid prostheses, and implant assisted removable partial denture. In this case, in a patient with moderate to severe chronic periodontitis requiring full arch extractions, implants were strategically placed using computer-guided surgery. In the maxilla, due to inadequate bone quality and quantity leading to insufficient initial stability, delayed loading was implemented, and interim prosthesis was used during the osseointegration period. In the mandible, stable initial stability was achieved, allowing for immediate loading to reduce patient discomfort. Primary stability is considered the most crucial factor for obtaining immediate loading, so a thorough clinical and radiological evaluation of the remaining alveolar bone quantity and quality must be conducted before surgery.

A STUDY ON THE CHANGE OF IMPLANT STABILITY USING RESONANCE FREQUENCY ANALYSIS

  • Park Chan-Jin;Kim Yung-Soo;Kim Chang-Whe;Cho Lee-Ra;Yi Yang-Jin
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.41 no.3
    • /
    • pp.271-287
    • /
    • 2003
  • Statement of problem: Resonance frequency analysis (RFA) has been increasingly served as a non-invasive and objective method for clinical monitoring of implant stability. Many clinical studies must be required for standardized baseline data using RFA. Purpose: This study was performed to evaluate RFA value changes in two stage surgery group and one stage surgery group in patients. Material and method: Forty-seven mandibles in consecutively implant installed patients were selected for this study and 141 fixtures were installed. Ninety-three fixtures were double threaded, machined surface design ($Br{\aa}anemark^{(R)}$ MK III, Nobel Biocare AB, Goteborg, Sweden) and 48 fixtures were root form, threaded, HA-coated surface one ($Replace^{TM}$, Steri-Oss/Nobel Biocare AB, USA). Among those, each 10 fixture was installed in one stage group patients. ISQ values were measured using $Osstell^{TM}$ (Integration Diagnostics Ltd. Sweden) during fixture installation, at healing abutment connection and in the loading period for two stage surgery group patients and during at each 4, 6, 8, 10, 12week and in the loading phase for one stage surgery group patients and evaluated the changes according to the time and fixture type. Results: In two stage surgery group, mean and SO of ISQ values of machined surface implants were $76.85{\pm}3.74,\;75.76{\pm}5.04,\;75.73{\pm}4.41$ and those of HA-coated surface implant were $75.05{\pm}6.23,\;77.58{\pm}5.23,\;78.32{\pm}4.29$ during fixtures installation, at healing abutment connection and in the loading period, respectively. In one-stage surgery group, the ISQ values of machined surface and HA-coated surface implants decreased until 4 or 6 week and maintained at plateau for 1-3 week and increased to the loading period. Conclusions: Machined and HA-coated surface implants showed minimal ISQ changes with time if they were installed at the sites showing at least intact cortical plate and good bone qualities. And HA-coated implants had a tendency to show somewhat increased ISQ values with time.

Effects of Packing Materials and Inorganic Chemicals During the Start Up in Anaerobic Filter Process (혐기성 생물막법의 Start Up에 있어서의 충진제 및 무기염류의 영향)

  • 정경훈;최형일;신대윤
    • Journal of Environmental Health Sciences
    • /
    • v.20 no.2
    • /
    • pp.73-79
    • /
    • 1994
  • The effects of packing materials in the anaerobic reactor and inorganic chemicals in the synthetic wastewater on the anaerobic treatment during the start up period were investigated using anaeroic filter process. The Ringlace and Honeycomb tube as packing materials were used in the anaerobic reactors. The Ca$^{2+}$ and Fe$^{2+}$ ion concentration as inorganic chemicals contained higher 40 times and 100 times as compared to the control synthetic wastewater, respectively. A start up period 104 and 150 days were necessary to achieve loading rate of 0.37 and 0.74 kg-Toc/m$^3$.d in the anaerobic filter process packed by Ringlace and Honeycomb tube, respectively. The loading rates of the reactor using the synthetic wastewater containing Ca$^{2+}$ (40 times) could be increased faster than in the reactors using the synthetic wastewater containing Fe$^{2+}$ ion (100 times) and control synthetic wastewater. The results of XMA analysis that a lot of the Ca$^{2+}$ ion on the surface of the anaerobic sludge in the anaerobic reactor packed by Ringlace which were fed supplied with synthetic wastewater containing Ca$^{2+}$ ion (40 times) observed as compared to the reactors supplied with control synthetic wastewater and containing Fe$^{2+}$ ion (100 times).

  • PDF

3D Characteristics of Dynamic Response of Seabed around Submerged Breakwater Due to Wave Loading (파랑하중에 의한 잠제 주변 해저지반의 3차원 동적응답 특성)

  • Hur, Dong-Soo;Park, Jong-Ryul;Lee, Woo-Dong
    • Journal of Ocean Engineering and Technology
    • /
    • v.28 no.4
    • /
    • pp.331-337
    • /
    • 2014
  • We analyzed the 3-D characteristics of the dynamic response of seabed around a submerged breakwater due to wave loading using a 3-D numerical scheme (LES-WASS-3D). Using our model, which considers the wave-structure-sandy seabed interactions in a 3-D wave field, we were able to investigate the 3-D characteristics of the pore-water pressure in the seabed around the submerged breakwater under various incident wave conditions. To verify the 3-D numerical analysis method suggested in this study, we compared the numerical results with the existing experimental results and found good agreement between them. The numerical analysis reveals that high pore-water pressure in the seabed is generated below a large wave height at the front slope of the submerged breakwater. It was also shown that the non-dimensional pore-water pressure in the seabed increases as the wave period increases because the wave energy dissipation decreases on the submerged breakwater and seabed as the wave period increases.

Effects of Algae Growth on the Effluent of Wastewater Treatment Systems by Using Water Hyacinth (조류 성장이 부레옥잠을 이용한 폐수처리공법의 유출수에 미치는 영향)

  • Lee, Byung-Hun;Lee, Nam-Hee;Kim, Jeong-Suk
    • Journal of Environmental Science International
    • /
    • v.1 no.2
    • /
    • pp.81.2-92
    • /
    • 1992
  • Growing algae spread over open water surface of water hyacinth system the leaves of hyacinth prevented the passage of sunlight through the water surface. The objectives of this study were to investigate the effects of the algae growth on the effluent of water hyacinth wastewater treatment systems operated with the variation of an organic loading rate between 190 to 550 kg COD/ha.day. The effluent from the system contained algae was discharged for about 2-3 weeks from the beginning of experimental operation of water hyacinth systems. BOD and 55 concentration of effluents during algae growthing periods were higher than those during the period of algae control. But nitrogen and phosphrous romoval efficiencies during in algae growthing periods were slighty higher than those during the period of algae control.

  • PDF

Unit Loading Factor of Nitrogen and Phosphorus for Controlling Eutrophication of Youngsan Lake (영산호의 부영양화방지를 위한 질소, 인의 배출원단위에 관한 조사연구)

  • 류일광;이치영;강영식;김관천
    • Journal of Environmental Health Sciences
    • /
    • v.15 no.2
    • /
    • pp.51-58
    • /
    • 1989
  • In order to estimate unit loading factors of N, and P for controlling eutrophication of Youngsan lake. This study was performed in 4 kinds of pollutant sources from domestic sewage, industrial waste water, livestock stall waste water and drainage of agricultural area during the period from april to october 1988. These results were as follows: 1. The sewage flow for domestic waste water was 191.2 l/capita, day and that of the gray and toilet waste water among the domestic waste water were shown 152.9 l/capita, day(80%) and 38.3 l/capita, day(20%), respectively. 2. The unit loading factor total nitrogen(T-N) for domestic waste water was 7.582g/capita, day, and that of the gray and toilet waste water among the domestic waste water were 1.826g/ capita, day(24.1%) and 5.756g/capita, day(75.9%), respectively. The other hand, the unit loading factors of total phosphorus(T-P) for domestic waste water was 0.925g/capita, day, and that of gray and toilet waste water among the domestic waste water were 0.470g/capita, day(50.8%) and 0.455g/capita, day(49.2%), respectively. 3. In offering Price per million won, the T-P loading factor for drinking manufacture, confectionery manufacture, beer-manufacture and fibre manufacture in the industrial pollutant sources estimate to be 0.350g/day, 0.099g/day, 32.351g/day and 1.536g/day, while T-N loading factor about them in the industrial pollutant sources estimate to be 4.117g/day, 2.414g/day, 106.726g/day and 60.504g/day, respectively. 4. The T-P loading factor according to wash-water of milch cow and pig were 6.735g/day and 18.526g/day, in case of T-N they were 42.397g/day and 27.226g/day, respectively. 5. The T-P loading factor for pollutants drainage in the Paddy fields, fields and forests area were 0.082g/are, day, 0.014g/are, day and 0.002g/are, day, and the T-N loading factor were 0.309g/are, day, 0.158g/are, day and 0.064g/are, day, respectively. The diffrent of the loading factor for pollutants discharges in the agricultural area were resulted from the rainful intensity, the rainful, the amount of fertilization manure, and etc.

  • PDF

STABILITY CHANGES OF IMMEDIATELY LOADED AND DELAYED LOADED IMPLANTS IN EDENTULOUS MANDIBLE (하악 무치악에서 즉시하중과 지연하중간 임플랜트의 안정성 변화)

  • Jung, Hye-Eun;Kim, Dae-Gon;Park, Chan-Jin;Cho, Lee-Ra;Yi, Yang-Jin
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.45 no.2
    • /
    • pp.250-262
    • /
    • 2007
  • Statement of problem: It was reported high success rate of implant-supported fixed prostheses using with $5{\sim}6$ implants on anterior mandible. Recently, immediate loading protocol was focused to overcome disadvantages of classic 2-stage delayed loading protocol. Purpose: This clinical study was to evaluate stability changes with time of immediately loaded and delayed loaded implants in edentulous mandible and to compare stability changes with time according to implantation sites. Materials and methods: Five or six implants were placed on anterior mandible depending on the arch shape. The immediately loading group was consisted of 8 patients received their prostheses within $24{\sim}48$ hours after implantation. The delayed loading group was consisted of 8 patients received their definitive prostheses following classical prosthetic procedures after a healing period of 3 months. All patients were recalled every 6 months for check-up. The evaluations of radiographic examination, ISQ value measurement and recording of complication were done. To evaluate marginal bone level, intraoral periapical radiographs were taken with long cone paralleling technique. At every evaluation recall, all prostheses were removed and ISQ values were measured with OsstellTM on individual implants. Results: 1. None of implants was failed. All implants showed stable marginal bone levels and ISQ values. 2. Marginal bone level changes with time showed statistically significant difference between immediately loading group and delayed loading group (P<0.001). 3. ISQ value changes with time did not show statistically significant difference between immediately loading group and delayed loading group (P=0.079). ISQ value decreased with time in both groups, however, all implants showed stable ISQ value at 30 months-recall evaluation. 4. Marginal bone level changes with time did not show statistically significant differences among implantation sites (P=0.604). 5. ISQ value changes with time showed statistically significant differences among implantation sites (P=0.047). ISQ values of most posterior implants decreased with time comparing to other implants. Conclusion: Although the marginal bone level of the terminal abutment didn't different with the other implants, ISQ value of the terminal abutment was lower than that of the other implants. Therefore, further clinical evaluation would be needed in this point of view.

Spectral analysis of semi-actively controlled structures subjected to blast loading

  • Ewing, C.M.;Guillin, C.;Dhakal, R.P.;Chase, J.G.
    • Structural Engineering and Mechanics
    • /
    • v.33 no.1
    • /
    • pp.79-93
    • /
    • 2009
  • This paper investigates the possibility of controlling the response of typical portal frame structures to blast loading using a combination of semi-active and passive control devices. A one storey reinforced concrete portal frame is modelled using non-linear finite elements with each column discretised into multiple elements to capture the higher frequency modes of column vibration response that are typical features of blast responses. The model structure is subjected to blast loads of varying duration, magnitude and shape, and the critical aspects of the response are investigated over a range of structural periods in the form of blast load response spectra. It is found that the shape or length of the blast load is not a factor in the response, as long as the period is less than 25% of the fundamental structural period. Thus, blast load response can be expressed strictly as a function of the momentum applied to the structure by a blast load. The optimal device arrangements are found to be those that reduce the first peak of the structural displacement and also reduce the subsequent free vibration of the structure. Semi-active devices that do not increase base shear demands on the foundations in combination with a passive yielding tendon are found to provide the most effective control, particularly if base shear demand is an important consideration, as with older structures. The overall results are summarised as response spectra for eventual potential use within standard structural design paradigms.

Pollutant Control using the Separation Wall between Stormwater and Sewage in a Combined Sewer System (우오수분리벽을 이용한 합류식 하수관거의 오염물질 제어효과)

  • Lee, Kuang Chun;Choi, Bong Choel;Lim, Bong Su
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.4
    • /
    • pp.461-469
    • /
    • 2004
  • This research is to determine the stormwater effects on sewer concentrations by measuring and comparing the flow and pollutant concentrations during dry and rainy periods in the existing BOX type combined sewer pipes. The monitoring was carried out in two sites, which are the Daesachen outfall having PE separation wall in BOX type combined sewer pipes and the Yongunchen outfall not having seperatioin wall. The average flow-weighted BOD concentraion in Yongunchen outfall is 2-fold lower than in Daesachen outfall because of the dilution effect from ravine water. However, the pollutant mass loading is 16 fold higher in Yongunchen outfall than in Daesachen outfall because of more flows. According to the research, the separation wall controls 52% pollutant mass during a storm period (11.5 mm/hr rainfall intensity). Therefore, the Yongunchen combined sewer system (CSS) need separation wall to control and to prevent more pollutant input in stream. In Daesachen area, the maximum sewer flow rate during a storm period measured about 10 fold bigger than average sewer flow during dry periods. Also the concentrations between rainy and dry periods increase approximately 33 fold for BOD and 120 fold for SS. In Yongunchen area, it increases about 9 fold for the maximum flow rate, 18 fold for BOD and 22 fold for SS during a storm. Therefore, the research is concluded that the separation wall between stromwater (or ravine water) and sewage can decrease the dilution effect in CSS and control the pollutant loading.