• 제목/요약/키워드: load duration curve

검색결과 128건 처리시간 0.021초

수질오염총량 단위유역별 LDC(Load Duration Curve, 부하지속곡선) 적용을 통한 수질관리 대안 모색 - 금호강 유역 대상 (Water Quality Management Measures for TMDL Unit Watershed Using Load Duration Curve)

  • 윤소영;류재나;오재일
    • 상하수도학회지
    • /
    • 제27권4호
    • /
    • pp.429-438
    • /
    • 2013
  • This study was to develop effective water quality management measures using LDC (Load Duration Curve) curves for TMDL (Total Maximum Daily Loads) unit watershed. Using LDC curves, major factors for BOD and T-P concentration loads generation (i.e. point source or non-point source) in the case study area (Geumho river basin) were found for different hydrologic conditions. Different measures to deal with the pollutant loads were suggested to establish BMPs (Best Management Practices). It was found that the target area has urgent T-P management methods especially at moist and midrange hydrologic conditions because of point source pollutants occurred in developed areas. One example measure for this could be establishment of advanced treatment facility. This study proved that the use of LDC was a useful way to achieve TWQ (Target Water Quality) on the target watershed considered. It was also expected that the methodology applied in this study could have a wider application on the establishment of watershed water management measures.

100kVA 이하급 배전용 변압기 일부하 패턴의 2-Step 모델링 (2-Step Modeling for Daily Load Curve of Up to and Including 100kVA Distribution Transformer)

  • 이영석;김재철;윤상윤
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.371-373
    • /
    • 2001
  • In this paper, we present 2-step load cycle for daily load curve of up to and including 100kVA distribution transformer in domestic. Daily load patterns are classified by two methods dependent upon possession information. In case we possess daily load profiles make use of K-mean algorithm and in case we have not daily load profiles, make use of customer information of KEPCO. As the parameters of the load pattern classification, we use are daily load profiles and customer information of each distribution transformers. Data management system is used for NT oracle. We can present peak load magnitude, initial load magnitude and peak load duration for daily load patterns by 2-step load cycle for daily load curve of up to and including 100kVA distribution transformer in domestic. We think that this paper contributes to enhancing the distribution transformer overload criterion.

  • PDF

오염부하지속곡선(LDC)을 이용한 수질오염총량관리 단위유역 목표수질 달성여부 평가방법 (Methodology for the Identification of Impaired Waters Using LDC for the Management of Total Maximum Daily Loads)

  • 박준대;오승영
    • 한국물환경학회지
    • /
    • 제28권5호
    • /
    • pp.693-703
    • /
    • 2012
  • Load Duration Curve(LDC) is a useful tool for analyzing water quality characteristics under various stream flow conditions. This study investigated the methods to identify impaired waterbodies in the assessment of water quality goal attainment by using LDC for the management of Total Maximum Daily Loads (TMDLs). Three methods were proposed. Non-typical regime exclusion method is a method to exclude water quality observations in the non-typical extreme flow conditions in order to minimize the influence of non-ordinary water quality. Flow regime weighted average method is a method to calculate weighted mean water quality instead of arithmetic mean in order to consider water characteristics properly on stream flow regime in addition to the effect of Non-typical regime exclusion method. Load exceeded interval comparison method is a method to compare the intervals between the attained and non-attained load duration periods on the LDC. The assessment of water quality goal attainment can be performed more reasonably and precisely considering water quality variations on stream flow conditions by applying these proposed methods.

오염총량평가를 위한 부하지속곡선 개발 및 적용 (Development of Load Duration Curve Methodology for TMDL Evaluation)

  • 강두기;강순구;김상단;신현석
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2007년도 학술발표회 논문집
    • /
    • pp.652-656
    • /
    • 2007
  • The major streams in South Korea have established the TMDL(Total Maximum Daily Loads) regulation for just 4 years. Traditional concepts in water quality management in South Korea are based upon the selection of a design streram flow which is 10-year averged flow exeedance probability 75%(Q275). That is, a single flow value based upon average long term flow conditions is chosen for application in dilution calculations, permit design, water quality modeling, etc. While these TMDLs seems to satisfy the requirement of the target water quality regulations, they have contributed little to any watershed/waterbody assessment and restoration plans. These types of TMDLs do little to characterize the problems the TMDLs are intended to address. For TMDLs to be more beneficial in the assessment and implementation process, TMDLs should reflect adequate water quality across flow conditions rather than at a single flow value such as average daily flow. In this paper, we developed LDC (load duration curve) methodology for theevaluation of Korean TMDL evaluation based on watershed scaled, physically based on SWAT(Soil and Water Assessment Tool) model.

  • PDF

발전계통의 신속도 산정에 관한 연구 (A Study on the Generating System Reliability Evaluation)

  • 김준현;황갑주;송석하
    • 대한전기학회논문지
    • /
    • 제32권3호
    • /
    • pp.69-75
    • /
    • 1983
  • This paper presents a improved algorithm for the generating capacity reliability evaluation using the frequency and duration approach. One of the specific feature of this algorithm is that propose the cumulative state load model via analytic expression of load duration curve and cumulative load frequency characteristic in conside ration of daily peak load. The paper illustrates the utilization of the proposed algorithm in actual system studies using the generating system of KEPCO. The results presented will provide a valuable reference for maintaining and planing the generating system.

  • PDF

부하지속곡선과 부하역률 감도기법 적용에 의한 효과적인 부하역률개선 연구 (A Study on Enhancing Load Power Factor Effectively Using Load Duration Curves and the Power Factor Sensitivity of Generation Cost)

  • 이병하;김정훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.480-482
    • /
    • 2005
  • In this paper, utilization of load duration curves is presented for analyzing the effect of load power factor and determining the value of load power factor effectively. In addition, the power factor sensitivity of generation cost and integrated costs including voltage variation penalty cost are used for determining the value of the load power factor from the point of view of voltage regulation and economic investment. It is shown through the application to the KEPCO power system that the load power factor can be enhanced effectively and appropriately using the load duration curve.

  • PDF

부하지속곡선(LDC)을 이용한 영산강 · 탐진강수계 오염총량관리 목표수질 평가방법 적용 방안 (Application of the Load Duration Curve (LDC) to Evaluate the Rate of Achievement of Target Water Quality in the Youngsan · Tamjin River Watersheds)

  • 정은정;김홍태;김용석;신동석
    • 한국물환경학회지
    • /
    • 제32권4호
    • /
    • pp.349-356
    • /
    • 2016
  • Total Maximum Daily Loads (TMDLs) System has been used to improve water quality in the Youngsan·Tamjin river basin since 2004. The Basic Policy of TMDLs sets up the standard flow based on the average dry condition or mid-range flow during the last 10 years. However, Target Water Quality (TWQ) assessment on TMDLs has been used to evaluate water quality through eight-day intervals over 36 times a year. The results for allocation evaluation and target water quality evaluation were different from each other in the same unit watershed during the first period. In order to improve the evaluation method, researchers applied Load Duration Curve (LDC) to evaluate water quality in nine unit watersheds of the Youngsan·Tamjin river basin. The results showed that achievement rates of TWQ assessment with the current method and LDC were 67~100% and 78~100%, respectively. Approximately 11% of the achievement rates with use of LDC were higher than those with use of the current method. In conclusion, it is necessary to review the application of the LDC method in all Four Major River Watersheds.

부하지속곡선과 유량-부하량 상관곡선을 이용한 낙동강 유역의 오염총량평가 (TMDL Evaluation of Nakdong River Basin Using Load Duration Curve and Streamflow-Load Rating Curve)

  • 손태석;주재승;박재범;신현석
    • 대한토목학회논문집
    • /
    • 제31권5B호
    • /
    • pp.475-481
    • /
    • 2011
  • 유역관리제도로써 시행 중인 현재의 수질오염총량관리제도의 기준유량은 과거 10년 평균저수량을 적용하고 있으며, 오염총량관리 이행평가는 단위유역별 목표수질을 만족할 수 있는 부하량에 대한 관리를 통해 시행되고 있다. 현재의 단순화되고 평균화된 개념의 기준유량을 이용한 단위유역별 부하량 할당과 관리는 목표수질 달성이라는 규제 기준을 달성하기 위한 관리측면에서의 편리성은 있으나 유역관리를 통한 유역 혹은 수체의 건전한 회복과 평가를 통해 문제점을 도출하고 해결하고자 하는 근본적인 유역관리의 역할은 미흡하다. 동일한 수질 농도를 유지, 관리하기 위해서는 매시간, 매일 변동하는 유량, 즉 전체유량을 고려한 부하량 관리를 통해서만 하천 생태계의 건강성을 유지할 수 있으며 이를 위해서는 전체 유량 규모를 고려해야 한다. 전체 유량 규모를 고려한다는 의미는 자연 현상인 강우-유출에 의해 다양하게 변동되는 유량과 인위적인 조절 유량 등을 고려한 오염총량관리 기준 설정과 이러한 양상을 반영한 과학적, 합리적인 평가가 가능하다는 의미이다. 이에 본 연구에서는 전체 유량 규모가 고려되는 유량-부하량 상관곡선을 이용한 오염총량평가 기법을 개발하고 이를 낙동강 수질오염총량관리 단위유역에의 실적용을 통해 문제점과 개선방향을 도출하고 본 기법의 국내 오염총량관리의 부하량 할당 및 이행평가에의 적용 가능성을 평가하였다.

각 부하지점별 확률론적 발전비용 산정을 위한 수치해석적 방법의 개발 (Development of a New Numerical Analysis Method for Nodal Probabilistic Production Cost Simulation)

  • 김홍식;문승필;최재석;노대석;차준민
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제50권9호
    • /
    • pp.431-439
    • /
    • 2001
  • This Paper illustrates a new numerical analysis method using a nodal effective load model for nodal probabilistic production cost simulation of the load point in a composite power system. The new effective load model includes capacities and uncertainties of generators as well as transmission lines. The CMELDC(composite power system effective load duration curve) based on the new effective load model at HLll(Hierarchical Level H) has been developed also. The CMELDC can be obtained from convolution integral processing of the outage capacity probabilistic distribution function of the fictitious generator and the original load duration curve given at the load point. It is expected that the new model for the CMELDC proposed in this study will provide some solutions to many problems based on nodal and decentralized operation and control of an electric power systems under competition environment in future. The CMELDC based on the new model at HLll will extend the application areas of nodal probabilistic production cost simulation, outage cost assessment and reliability evaluation etc. at load points. The characteristics and effectiveness of this new model are illustrated by a case study of MRBTS(Modified Roy Billinton Test System).

  • PDF

부하지속곡선(LDC ; Load Duration Curve)을 활용한 낙동강수계 오염총량 단위유역 목표수질 평가방법 적용 방안 (Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Nakdong River Unit Watersheds)

  • 정강영;김홍태;김상수;김신;신동석;김경훈
    • 한국환경과학회지
    • /
    • 제26권4호
    • /
    • pp.433-445
    • /
    • 2017
  • In recent years, the United States has used the Load Duration Curve (LDC) method to identify water pollution problems, considering the size of the pollutant load in the entire stream flow condition to effectively evaluate Total Maximum Daily Loads (TMDLs). A study on the improvement of the target water quality evaluation method was carried out by comparing evaluations of two consecutive years of water quality and LDC data for 41 unit watersheds (14 main streams and 27 tributaries). As a result, the achievement rate of the target water quality evaluation method, according to current regulations, was 68-93%, and that by the LDC method was 82-93%. Evaluating the target water quality using the LDC method results in a reduction in the administrative burden and the total amount of planning as compared to the current method.