• 제목/요약/키워드: line test

검색결과 4,431건 처리시간 0.034초

실사용조건을 모사한 전차선 굽힘피로 특성평가 시스템개발 (Development of Bending Fatigue Test System for Trolley Line Simulating Real Conditions)

  • 강민성;안상수;구재민;석창성;이기원;조용현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.3059-3064
    • /
    • 2011
  • A Trolley line is a very important equipment among electric railway equipments since it contacts directly with pantograph and supplies electricity on the electromotive. Such it was thought that a trolley line need not to consider fatigue since the replace cycle by wear is shorter than the replace cycle by fatigue breakage. But, the bending fatigue breakage accidents occurred several times at the Shinkansen trolley line in East Japan Railway Company. Therefore, in case of a new developed trolley line, the evaluation for bending fatigue life became more important, But, since there are not an authorized fatigue test method and a testing device for the trolley line, the quantitative evaluation is difficult. In this study, we analyzed the load and environment condition of trolley line used in the actual spot and the developed testing device that can evaluate bending fatigue properties of the trolley line as simulating the real condition. The bending fatigue test of the trolley line was achieved using the developed testing device and estimated the fatigue life of trolley line and also, established the fatigue test process.

  • PDF

경계스캔 구조를 사용한 시스템의 온라인 버스 모니터링 (On-line Bus Monitoring of a System Using Bondary-Scan)

  • 송동섭;배상민;강성호;박영호
    • 대한전기학회논문지:시스템및제어부문D
    • /
    • 제49권12호
    • /
    • pp.675-682
    • /
    • 2000
  • When a system is composed of multi-boards, an efficient bus arbitration method for the data transfer bus must be provided for guaranteeing proper operations. In this paper, a new test methodology is developed which is used for testing on-line bus arbitration. In the new test methodology, events that are occurred during bus arbitration are defined, and expected signals during fault-free bus arbitration are compared with the signals captured during on-line bus arbitration using boundary-scan cells. For this, a new test architecture is proposed which is efficient for the maintenance and the repair of multi-board systems. In addition, the new methodology can be used with off-line interconnect test using boundary-scan.

  • PDF

차세대 전동차 대불선 시운전 시 유지보수방안 연구 (A study on advanced EMU's maintenance program on test operation in Dabul line)

  • 김영규;박세영;송정훈;안천헌;이한민
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.2215-2222
    • /
    • 2010
  • Advanced EMU have been enhanced in terms of safe transport and maintainability. It is a new urban railway technology that enables an operation institution to cut repair and maintenance costs and customers to use convenient service at lower costs based on IT technology. If a development vehicle of Advanced EMU is completed, it will be used to test the entire advanced EMU system through sufficient performance check and reliability check prior to operation in commercial line. It will also verify efficiency, safety, punctuality and energy efficiency of transport. Accordingly, it is necessary to figure how to repair and maintain vehicles to enhance safety of Advanced EMU system in cooperation with operation during the period of comprehensive evaluation on the operation of a development vehicle in a test line. In this paper, we investigated the maintenance program of Advanced EMU on test operation in Dabul line. The test condition and operation environment of Advanced EMU in Daebul line was analyzed.

  • PDF

HVAC에 의한 On-line, Off-line PD 모니터링 (On-line and Off-line Partial Discharge Monitoring System with HVAC Testing)

  • 최용성;이경섭
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2008년도 춘계학술대회 논문집 센서 박막재료연구회 및 광주 전남지부
    • /
    • pp.111-114
    • /
    • 2008
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

고속전철기술개발사업의 시운전시험계획 ((On-Line Test of High Speed Rail Development))

  • 김석원;최강윤;김기환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 추계학술대회 논문집
    • /
    • pp.376-384
    • /
    • 1999
  • In this paper, we introduce the on-line test plan of high speed rail development, which will be carried out at the test section of Seoul-Pusan high speed line from May to October, 2002. The test items are decided focused on the verification of the perofrmace and acquirement of the technical data of the high speed rail system development. The running time and distance of the train are calculated for several limited maximum speed cases. The detailed test scenario shall be developed according to the process of development and design of the system.

  • PDF

765kV 시험선로를 이용한 전기환경장해 특성연구 (Study on Electrical Environmental Obstacle Using a 765kV Double Circuit Test Line)

  • 김정부;조성배;신구용;이동일;양광호;안희성;배정효;구자윤;민원석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1994년도 하계학술대회 논문집 C
    • /
    • pp.1517-1519
    • /
    • 1994
  • This paper describes electrical environmental study of a 765kV double circuit test line. Corona performance on several candidate conductor bundles has been investigated in the corona cage (single phase simulation facility) since 1984. We have known that six RAIL conductor bundle is the most suitable for the 765kV transmission Line, [3] To investigate electrical environmental impact of the future commerciale line, we build a full sacle 765kV test line in 1993. The test results of Audible Noise, Radio Interference, TV Interference from August, 1993 to Jan. 1994 were measured as $48.7[dBA](L_{50})$. $57.4[dB{\mu}V/m]$(Fair weather, $L_{50})$. $14.5[dB${\mu}$V/m]$(Fair weather, $L_{50}$). We have found that the Audible Noise data were very close to the predicted(48.5 [dBA]) by BPA Corona and Field Effects Computer program, however, the RI and TVI data were much higher than predicted(42 [dBmV/m], $7.9[dB{\mu}V/m)$ by the BPA program. We have investigating the reason of the difference. In the constructing of full scale test line, we developed the tubular tower, 765kV test transformer and hardwares of 765kV transmission line insulator strings. Also we will investigate the effects of plants under the 765kV test Line.

  • PDF

실증시험선로를 이용한 도체귀로형 HVDC ±500 kV Double Bipole 가공송전선로의 이온류 특성 평가 (Ion Effects of HVDC ±500 kV Double Bipole Overhead Transmission Line with Metallic Return Conductor Using Full-scale Test Line)

  • 신구용;권구민;주문노;우정민
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제5권4호
    • /
    • pp.249-256
    • /
    • 2019
  • 국내에 향후 건설 예정인 도체귀로형 HVDC ±500 kV Double Bipole 가공송전선로의 최적선로 형상을 설계하고 송전선로에서 발생되는 전기환경장해를 검증하기 위해 실증시험장을 구축하여 1년간 전기환경장해 평가시험을 수행하였다. 또한, HVDC Double Bipole 실선로에서 인체의 지표면 전계인지도 평가시험을 통해 HVDC 실규모 실증선로 직하에서 인체가 직류 전계를 감지하는 임계값을 조사하여 HVDC ±500 kV Double Bipole 가공송전선로의 직류전계 설계기준안의 타당성을 검증하였다. HVDC ±500 kV Double Bipole 시험선로의 극형상은 전기환경장해와 운영관점에서 동일한 극성을 대각으로 배치하였으며, 국내 가공송전선로의 전기환경장해의 사회적인 수용성을 고려하여 선로에서 코로나방전이 거의 발생되지 않도록 소도체 방식은 6 도체를 선정하였다. 도체귀로형 HVDC ±500 kV Double Bipole 가공송전선로 방식인 Cardinal×6B를 적용한 실증시험결과, 선로 도체에서 코로나 방전이 거의 발생되지 않았으며, 따라서 지표면 전계와 이온전류밀도는 모두 국내 가공송전선로 설계 기준값을 만족하였다. 또한 선로직하에서 피조사자들에 대한 전계 인지도 평가결과, 피조사자들의 70%는 23 kV/m에 노출되어도 직류전계를 인지하지 못하는 결과를 나타냈다.

실증시험을 통한 지중배전선로 모델링 기법 검증 연구 (Verification of Underground Distribution Line Modeling with Field Test)

  • 윤창섭;이재봉;김병숙;이종범
    • 전기학회논문지
    • /
    • 제56권12호
    • /
    • pp.2091-2097
    • /
    • 2007
  • This paper described the verification of modeling technique of underground distribution from comparison between field test and simulation. It needs more exact transient phenomenon analysis model to establish lightning protection of underground distribution line. Although, there were a lot of transient phenomenon researches, nobody could has verified the confidence of modeling from field tests in interior until now. So, simulation model verified field test is needed to analyse transient phenomenon of underground distribution system. The examination must be accomplished in many different condition before suggesting these verified analysis model. In this paper, the conditions were examined and the various data results on the different line composition was compared with the EMTP simulation, when the lightning impulse test was accomplished at underground distribution line. Also the value between field test and simulation was very closed and the method of modeling has demonstrated confidence, when the method is used to analyse domestic transient phenomenon of underground distribution.

인공고장 발생장치(AFG)를 이용한 지락고장 실증시험 (The field-test for single line-to-ground fault by an artificial fault generator)

  • 최선규;김동명;강문호
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2004년도 학술대회 논문집
    • /
    • pp.97-100
    • /
    • 2004
  • This paper introduced an artificial fault generator which was operated in the Go-Chang field-test center and explained the result of single line-to-ground fault by AFG. The AFG can basically experiment line-to-line and line-to-ground faults. This facility directly connected distribution transmission lines, so the test results are very useful for power system analysis and protection. Using the function of the AFG, we briefly said the test methods ud results for the 22.9[kV-v] and $6.6[kV-{\Delta}]$ system.

  • PDF