• Title/Summary/Keyword: line reliability

Search Result 1,093, Processing Time 0.029 seconds

Design and Implementation of XCP Network System

  • Heo, Jong-Man;Kang, Hyoung-Koo;Kim, Woo-Young;Kwon, Wook-Hyun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1581-1585
    • /
    • 2005
  • This paper describes the design and implementation of a XCP (Xeline Control Protocol) network system. XCP is an information oriented protocol which delivers information with high reliability according to the predefined rule. The XCP network system is implemented with partly hardware and partly software based on the power line communication(PLC) environment. A network management tool which interacts with devices is also developed. In order to verify the feasibility of the proposed architecture, the implemented XCP network system is evaluated using a lighting control system.

  • PDF

An Efficient Electric Installation Design and Implementation for Electric Railway Tunnels (전기 철도 터널 내 전력설비의 효율적 설계 및 구현)

  • Lee, Gyu-Dae;Jeon, Jeong-Pyo;Kim, Kwang-Ho
    • Journal of Industrial Technology
    • /
    • v.31 no.B
    • /
    • pp.23-26
    • /
    • 2011
  • The efficiency and performance of electric facilities in electric railway tunnels are quite important factors for operation and maintenance of railway since most of maintenance works for railways are doing during the night. Specially, in the railways like Gyeong-Chun Line passing through many mountains, many parts of railways are constructed with tunnels. So, this paper proposes the efficient electrical installation design scheme for railway tunnel considering the system performance, economics, and the reliability of power supply to tunnel electric facilities. Finally, the proposed design scheme is implemented to the tunnel design for Gyeong-Chun Line (Electric Railway).

  • PDF

OPGW Corrosion Detection Using Nondestructive Test Method

  • Jeong, Jae-Kee;Yoon, Gi-Gab;Kang, Ji-Won;Yang, Hai-Won
    • Journal of Electrical Engineering and information Science
    • /
    • v.3 no.1
    • /
    • pp.45-50
    • /
    • 1998
  • This paper deals with some characteristics of a nondestructive eddy current detector to measure OPGW(Composite overhead ground wire with optical fiber) corrosion. This detector is designed to automatically run on OPGW and to continuously inspect the corrosion of the line. The impedance of the eddy current coil changing by any corrosion phenomenon of OPGW is analyzed. Several performances of the detector are described and experimental procedures and test results are also given. As a result, it is shown that the implemented detector can be measured some quantitative data for crack, broken wires or severe deteriorations in OPGW. This nondestructive test method would be applied to improve the reliability and efficiency of transmission line in service.

  • PDF

Characteristics and Fault Analysis of Electric Devices for High-Speed Railway using Control Signal (제어 신호를 이용한 고속철도 전장품의 특성 및 고장 분석)

  • Han, Young-Jae
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.19 no.12
    • /
    • pp.1128-1133
    • /
    • 2006
  • The most important thing to secure safety and reliability of railway vehicles is to verify performance characteristics of equipments, and related companies or research institutes had many efforts to verify performances and functions of equipments synthetically and efficiently. KHST(Korean High Speed Train) has been developed by KRRI (Korea Railroad Research Institute). An electric railway system is composed of high-tech subsystems, among which main electric equipment such as transformers and converter are critical components determining the performance of rolling stock. We developed a measurement system for on-line test and evaluation of performances of KHST. The measurement system is composed of software part and hardware part. Perfect interface between multi-users is possible. A new method to measure temperature was applied to the ]measurement system. By using the system, fault diagnosis and performance evaluation of electric equipment in Korean High Speed Train was conducted during test running.

A study on the High Integrated 1TC SONOS Flash Memory (고집적화된 1TC SONOS 플래시 메모리에 관한 연구)

  • 김주연;이상배;한태현;안호명;서광열
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2002.07a
    • /
    • pp.26-31
    • /
    • 2002
  • To realize a high integrated Flash memory utilizing SONOS memory devices, the NOR type 1TC(one Transistor Cell) SONOS Flash arrays are fabricated and characterized. This SONOS Flash arrays with common source lines are designed and fabricated by conventional 0.35$\mu\textrm{m}$ CMOS process. The thickness of ONO for memory cell is tunnel oxide of 34${\AA}$, nitride of 73${\AA}$ and blocking oxide of 34${\AA}$. To investigate operating characteristics, CHEI(Channel Hot Electron Injection) method and Bit line erase method are selected as the write operation and the erase method, respectively. The disturbance characteristics according to the write/erase/read cycling are also examined. The degradation characteristics are investigated and then the reliability of SONOS flash memory is guaranteed.

  • PDF

MM PWM Scheme for High Performance and Harmonic Effects Minimization of VSI-IM Drive System (VSI-IM 구동시스템의 고동작 및 고주파영향 최소화를 위한 MM PWM 방식)

  • Min Soo Kim
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.25 no.1
    • /
    • pp.42-48
    • /
    • 1988
  • MM(multimode) PWM(pulse width modulation) Suitable for high performance and harmonic effects minimization of VSI (voltabge source invertetr)-IM (induction motor)drive system is proposed. The approximated optimal, suboptimal and optimal PWM are implemented in the low frequency range, while square wave operation is realized in the hibh frequency range. The pulse width Modulator is capable of generating control signals to a transistorized inverter operating at about 1KHz. All functions except digital comparison have been implemented in softyware making the scheme economical, flexible and reliable. Pulse width modulator is built and tested experimentally. In order to confirm the effectiveness and the reliability of the theoretical proposition, this scheme is applied to 1Hp, Three phase IM. As results, it is concluded that the scheme of MM PWM is superior to other conventional switching scheme through the discussions or analysis carried out on the items such as line-to-line voltage, current and spectrum of current harmonic components observed at the output terminal of inverter, noise level of motor.

  • PDF

Fault Diagnosis and Performance Evaluation of Auxiliary Block for Korean High-Speed Railway (한국형 고속열차 보조전원장치 고장진단과 성능평가)

  • Kim, Seog-Won;Kim, Ki-Hwan;Kim, Sang-Soo;Koo, Hun-Mo;Joo, Hyun-Wook;Han, Young-Jae
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.612-617
    • /
    • 2006
  • As the on-board electric devices determine the performances of vehicles, production of reliable devices is important. To keep the reliability of devices constant, management of performance evaluation of the on-board devices is crucial. Because temperature has a serious effect on failures of the components of the devices, its measurement is the first step for good management. In this study, we described performance characteristics of domestic auxiliary block developed through G7 project. We measured the performances of auxiliary block during test running by the developed on-line measurement system. After we save the input real-time data from each signal of Korean High Speed Train through the network line, we can acquire necessary information through post-processing program. We verify the motor block characteristics of Korean High Speed Train by this system.

A Study On Full Load Test of IGBT Type Propulsion System for Electric Railway in SMG 6 Line (전동차용 IGBT형 추진제어장치의 6호선 본선 만차 시험에 관한 연구)

  • 박건태;정만규;고영철;방이석;서광덕
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.666-673
    • /
    • 2000
  • This paper describes the full load test results of IGBT VVVF inverter for the railway propulsion system. The 1,650kVA IGBT VVVF inverter has been developed. Therefore, the field test is performed in SMG 6 Line to confirm its the reliability and performance. The train consists of 4M4T(4 Motor car 4 Trailer Car) and the electrical equipment for field test are as follows VVVF inverter 4 sets, 16 traction motors and 2 SIVs. The propulsion system is composed with IC4M(1-Controller 4-Motors). The results of propulsion system which have the excellent acceleration/deceleration and the jerk characteristics as well as starting ability on slope are taken through the field test.

  • PDF

The Rolling Stock operation reliability improvement plan which applies a data base of the RIMS (RIMS 데이타를 활용한 전동차 운행 신뢰성 향상방안)

  • Park, Soo-Choong;Lee, Do-Sun;Jeon, Seo-Tak;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.57-64
    • /
    • 2007
  • RIMS(Rolling Stock Information Maintenance System) was installed in structure which it can analyze the data base in need of credibility maintenance. So it could accumulate real data without repulsion of working spot. Information system was installed not following to system but following to working spot. The development of RIMS project was started from March 29, 2001 and it has been operating from October 12, 2004 in Chang-dong Car depot for light maintenance in charge subway line4. So substantial data base was accumulated for three years. This study calculated all RAMS data by analyzing data base accumulated in RIMS and used in dada base about credibility maintenance and found investigation of propriety, expectation of the life cycle cost, the improvement plan on credibility of sorts of cars and formation about the cycle of repairing and maintenance. This got MKBSF MKBF and MTBF about devices and sorts of line4 Rolling Stocks for it.

  • PDF

The Rolling Stock operation reliability improvement plan which applies a data base of the RIMS (RIMS 데이타를 활용한 전동차 운행 신뢰성 향상방안)

  • Park, Soo-Choong;Lee, Do-Sun;Jeon, Seo-Tak;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.143-150
    • /
    • 2007
  • RIMS(Rolling Stock Information Maintenance System) was installed in structure which it can analyze the data base in need of credibility maintenance. So it could accumulate real data without repulsion of working spot. Information system was installed not following to system but following to working spot. The development of RIMS project was started from March 29, 2001 and it has been operating from October 12, 2004 in Chang-dong Car depot for light maintenance in charge subway line4. So substantial data base was accumulated for three years. This study calculated all RAMS data by analyzing data base accumulated in RIMS and used in dada base about credibility maintenance and found investigation of propriety, expectation of the life cycle cost, the improvement plan on credibility of sorts of cars and formation about the cycle of repairing and maintenance. This got MKBSF MKBF and MTBF about devices and sorts of line4 Rolling Stocks for it.

  • PDF