• Title/Summary/Keyword: line capacity simulation

Search Result 164, Processing Time 0.029 seconds

Simulation of Assembly System using SIMAN (SIMAN을 이용한 조립 시스템의 시뮬레이션에 대한 연구)

  • Mok, Hak-Soo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.17 no.1
    • /
    • pp.59-73
    • /
    • 1991
  • In this paper, how to evaluate the assembly system was studied. The traction machine(TRM/C) is a kind of medium sized small quantity product. This work was performed on restriction of satisfying the customer's demand by simulating on the criteria of the queuing quantity in production system, the effectiveness of assembly machine and the average time spent on assembling. The problems about assembling were grasped through the analysis of products and process. The outputs of simulations that used SIMAN on four alternatives were evaluated on the basis of the average queuing quantity, the line effectiveness, the assembly time of a product and the production capacity.

  • PDF

Design of Data Retention Test Circuit for Large Capacity DRAMs (대용량 Dynamic RAM의 Data Retention 테스트 회로 설계)

  • 설병수;김대환;유영갑
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.30A no.9
    • /
    • pp.59-70
    • /
    • 1993
  • An efficient test method based on march test is presented to cover line leakage failures associated with bit and word lines or mega bit DRAM chips. A modified column march (Y-march) pattern is derived to improve fault coverage against the data retention failure. Time delay concept is introduced to develop a new column march test algorithm detecting various data retention failures. A built-in test circuit based on the column march pattern is designed and verified using logic simulation, confirming correct test operations.

  • PDF

On-line Scheduling Analysis for Job-Shop Type FMS

  • Lee, Jeong Hwan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.64
    • /
    • pp.63-76
    • /
    • 2001
  • This paper presents a job-shop type flexible manufacturing system(FMS) scheduling problem and examines the effects of scheduling rules on the performance of FMS. Several machine and AGV scheduling rules are tested against the mean flow-time criterion. In this paper, I compare the rules under various experimental conditions by using an FMS simulation model. One of the objectives of this study is to discuss how the simulation-based scheduling problem can be operated. The other is to measure sensitivity of the rules to changes at inter arrival time, queue capacity, breakdown rates for machines and AGV, and AGV speed. Therefore, the results of simulation experiments were considered on FMS design and operating stages. A comprehensive bibliograph? is also presented in the paper.

  • PDF

Compensation of Voltage Variation Using Active Power-Dependent Reactive Power Control with Multiple VRE Systems Connected in a Distribution Line (배전 선로에 연계된 다수대의 변동성 재생에너지 발전 시스템의 출력 유효전력 변동에 따른 무효전력 제어를 이용한 전압 변동 보상)

  • Lee, Sang-Hoon;Kim, Soo-Bin;Song, Seung-Ho
    • Journal of Wind Energy
    • /
    • v.9 no.4
    • /
    • pp.47-56
    • /
    • 2018
  • This paper introduces an active power dependent standard characteristic curve, Q(P) to compensate for voltage variations due to the output of distributed generation. This paper presents an efficient control method of grid-connected inverters by comparing and analyzing voltage variation magnitude and line loss according to the compensation method. Voltage variations are caused not only by active power, but also by the change of reactive power flowing in the line. In particular, the system is in a relatively remote place in a coastal area compared with existing power plants, so it is relatively weak and may not be suitable for voltage control. So, since it is very important to keep the voltage below the normal voltage limit within the specified inverter capacity and to minimize line loss due to the reactive power. we describe the active power dependent standard characteristic curve, Q(P) method and verify the magnitude of voltage variation by simulation. Finally, the characteristics of each control method and line loss are compared and analyzed.

A Hardware Architecture for Estimating Optimal Capacity of Information System based on Simulation Model (시뮬레이션 모델을 이용한 정보시스템의 적정용량 추정을 위한 하드웨어 아키텍처)

  • Kim, Jeong-su;Lee, Eun-seok;Kim, Jong-hee;Park, Jong-kook;Kim, Jong-bae
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2014.05a
    • /
    • pp.215-217
    • /
    • 2014
  • A system architecture design relying only on the experience of its designer varies in quality in line with the designer's personal experience and knowledge ability. Likewise, a wrong estimation of hardware capacity ends up in waste of resources. In practice, a range of post-hoc monitoring tools are in operation, without providing any method for estimating and reflecting the performance at an early stage of architecture design. Provided capacity requirement is estimated in advance with simulation at the stage of design, the system capacity ends up in waste of resources. In practice, a range of post-hoc monitoring tools are in operation, without providing any method for estimating and reflecting the performance at an early stage of architecture design. Provided capacity requirement is estimated in advance with simulation at the stage of design, the system performance requirement can be met with a minimal cost while the waste of resources can be reduced to a great extent. In this context, the present study develops a pilot simulation model for hardware architecture design and then verifies its validity in an experiment. If the error rate falls within a permissible range in the experiment, the simulation model may be considered to reflect well the characteristics of real-life information system architecture.

  • PDF

MIMO-OFDM BPLC over Statistical Power Line Channels with Cross-Talk (크로스 토크를 갖는 통계적 전력선 채널 하에 MIMO-OFDM 광대역 전력선 통신)

  • Yoo, Jeong-Hwa;Choe, Sang-Ho;Pine, Nazcar
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.12B
    • /
    • pp.1565-1573
    • /
    • 2011
  • In this paper, we present a MIMO-OFDM broadband power line communication (BPLC) for Smart Grid and its associated applications and analyze its performance over the 3-phase 4-wire power line channels. For practical BPLC system simulation, we adopt the statistical power line fading channel model instead of the existing deterministic fading channel models (Zimmermann model, MTL model, and so on). In this paper, we implement $2{\times}2$ and $3{\times}3$ MIMO schemes using 3-phase 4-wire power lines. We investigate the capacity loss and BER performance of the proposed MIMO system by considering the effect of cross-talk between antenna paths. We choose space-frequency coding in order to reduce frequency interference between subcarriers and employ maximum ratio combining (MRC) that achieves both multiple antenna path diversity gain and multiple fading path diversity gain. We evaluate the proposed system performance through computer simulation in terms of the impulse noise index and the capacity loss ratio and compare the different signal combining schemes including MRC, equal gain combing (EGC), and selection combining (SC).

Development of a Real-Time Simulation Algorithm of HTS Power Cable using HTS Wire (고온초전도선을 이용한 초전도전력케이블의 실시간 시뮬레이션 알고리즘 개발)

  • Kim Jae-Ho;Park Min-Won;Cho Jeon-Wook;Sim Ki-Deok;Yu In-Keun
    • Progress in Superconductivity and Cryogenics
    • /
    • v.8 no.3
    • /
    • pp.54-58
    • /
    • 2006
  • In this paper, authors developed a real-time simulation algorithm for the power device application of HTS(High Temperature Superconducting) wire by using Real Time Digital Simulator(RTDS). At present, in order to extend the power capacity of some area where has a serious problem of power quality. especially metropolitan complex city, there are so many problems such as right of way for power line routes. space for downtown substations. and the environmental protection, etc. HTS technology can be useful to overcome this problem. Recently, according to the advanced HTS technology, the power application is being researched well. Simulation is required for safety before installation of HTS power cable, a fabrication model used at the power system simulation. This paper describes a real time digital simulation method for the application of HTS wire to power device. For the simulation analysis, test sample of HTS wire was actually manufactured. And the transient phenomenon of the HTS wire was analysed in the simulated utility power grid. This simulation method is the world first trial in order to obtain much better information for installation of HTS power device into a utility network.

Performance Analysis of High-Speed Transmission Line for Terabit Per Second Switch Fabric Interface (테라급 스위치 패브릭 인터페이스를 위한 고속 신호 전송로의 성능 분석)

  • Choi, Chang-Ho;Kim, Whan-Woo
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.51 no.12
    • /
    • pp.46-55
    • /
    • 2014
  • PCB design technology for high-speed transmission line has been developed continuously. Adapting to the high capacity of the communication system, switch fabric interface used for backplane is being standardized to accommodate more than 10Gbps serial interface. In this paper, various computer simulations are performed to compare the performance of each transmission line per length according to PCB material, and also to analyze the effect from via stub length and crosstalk, for the purpose of applying 11.5Gbps serial interface as a switch fabric interface in tera-bit switching system. As a result of the simulation, important design issues, such as PCB material of each board supporting 8dB improvement in transmission loss using low loss PCB, maximum available stub length on transmission line via, whether or not to apply the backdrill process to the via, and the clearance of the differential pair between transmission lines, are determined. The most efficient system architecture which could be applied 11.5Gbps serial interface in all switch fabric interfaces is defined from the simulation results.

A Simulation Study for Evaluation of Alternative Plans and Making the Upper-limit for Improvement in Productivity of Flow-shop with Considering a Work-wait Time (흐름생산 공정에서의 작업 대기시간을 고려한 공정 개선 상한선 도출 : H사의 공정 개선 계획안 시뮬레이션 사례를 중심으로)

  • Song, Young-Joo;Woo, Jong-Hun;Lee, Don-Kun;Shin, Jong-Gye
    • Journal of the Korea Society for Simulation
    • /
    • v.17 no.2
    • /
    • pp.63-74
    • /
    • 2008
  • The design of best efficient production process is common requirements of the production strategy department and the process planning department to maximize the revenue and accomplish target production volumes in the production periods. And they use several general methods for that-line-balancing, removing of the bottle-neck process, facility ramp-up, increasing of the worker's utilization, etc. But, those methods have depended on analytic, static and arithmetic calculations, yet. So, irregular work-waiting time causing the delay time isn't include in extracting production capacity, especially in the line production process. The work-waiting time is changed irregularly along the variation of each machine and very important for calculate real product lead-time and forecasting target production volumes. At this thesis, i'm going to mention the importance of the delay time of conveyor system which can be extracted by discrete-event simulation. And suggest it as a new main variable that must be considered at designing new production system. Then experimented and tested that's effects in the H-company case, conveyor based line production process.

  • PDF

A Simulation Analysis on the Assembly System of Mobile Bath Vehicles (이동식 목욕차량의 조립시스템에 대한 시뮬레이션 분석)

  • Chung, Hoyeon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.2
    • /
    • pp.93-101
    • /
    • 2021
  • The purpose of this study is to analyze the adequacy of production capacity of the assembly process system of mobile bath vehicle's top box panel and process design through a simulation analysis. Towards this end, the layout of the facility designed with pre-verification job using a simulation modeling and an experiment, and facility, logistics process, and personnel input method were made into a simulation model, and the design system's adequacy was evaluated through an experiment. To produce 120 mobile bath vehicles annually, it was analyzed that 14 general workers and seven skilled workers were adequate through the experiment. It was also identified that three painting process lines carried out through outsourcing were adequate. Production lead time was 201.7 hours on average and it was 230 hours maximum. To meet customer delivery service level of 95% within the deadline when establishing a customer order and vehicle delivery plan, it was analyzed that more than 215 hours of lead time is needed minimum. If the process cycle time is reduced to 85% upon system stabilization and skillfulness improvement, it was analyzed that annual output of 147 vehicles can be achieved without additional production line expansion.