A new precast wall connection subjected to monotonic loading

  • Vaghei, Ramin;Hejazi, Farzad;Taheri, Hafez;Jaafar, Mohd Saleh;Ali, Abang Abdullah Abang
    • Computers and Concrete
    • /
    • v.17 no.1
    • /
    • pp.1-27
    • /
    • 2016
  • Final construction project cost is significantly determined by construction rate. The Industrialized Building System (IBS) was promoted to enhance the importance of prefabrication technology rather than conventional methods in construction. Ensuring the stability of a building constructed by using IBS is a challenging issue. Accordingly, the connections in a prefabricated building have a basic, natural, and essential role in providing the best continuity among the members of the building. Deficiencies of conventional precast connections were observed when precast buildings experience a large induced load, such as earthquakes and other disasters. Thus, researchers aim to determine the behavior of precast concrete structure with a specific type of connection. To clarify this problem, this study investigates the capacity behavior of precast concrete panel connections for industrial buildings with a new type of precast wall-to-wall connection (i.e., U-shaped steel channel connection). This capacity behavior is compared with the capacity behavior of precast concrete panel connections for industrial buildings that used a common approach (i.e., loop connection), which is subjected to monotonic loading as in-plane and out-of-plane loading by developing a finite element model. The principal stress distribution, deformation of concrete panels and welded wire mesh (BRC) reinforcements, plastic strain trend in the concrete panels and connections, and crack propagations are investigated for the aforementioned connection. Pushover analysis revealed that loop connections have significant defects in terms of strength for in-plane and out-of-plane loads at three translational degrees of freedom compared with the U-shaped steel channel connection.

Impact of Bank-protection Work on Stenopsyche marmorata (Trichoptera) in the Middle Reaches of the Chikuma River in Central Japan (Chikuma 강 중류 수역에서 하안 보호 공사가 Stenopsyche marmorata (Trichoptera)에 미치는 영향 (Central Japan))

  • Fukunaga, Yachiyo;Kimura, Goro;Kimio, Hirabayashi
    • Korean Journal of Ecology and Environment
    • /
    • v.37 no.4 s.109
    • /
    • pp.400-405
    • /
    • 2004
  • Since a large bank-protection works project was undertaken during winter in the middle reaches of the Chikuma, the riverbed structure was drastically altered. In order to assess the short-term impact of bank-protection works on the abundance Pattern of Stenopsyche marmorata (Trichoptera) from spring to early summer, we conducted an investigation on the capture of adults using light traps before and after construction work. The patterns of the daily capture of S. marmorata and the Namely, after construction, the daily catch of adult numbers increased only slightly during the investigation periods. This suggested that the age structure of the S. marmorata larval population had changed in the construction area. Our data suggest that bank-protection projects impact the abundance pattern of adult caddisflies in the river ecosystem.

Benefit Cost Analysis on Mitigation of Environmental Impacts Using Contingent Valuation Method : The Kwangyang Habor Case (환경저감화 시설에 대한 비용편인분석 : 광양만 사례연구)

  • Kang, Hee Yong;Jung, Seung Jin;Kim, Kyu Han;Pyun, Chong Kun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.2B
    • /
    • pp.217-223
    • /
    • 2006
  • This study is to investigate the effect of environmental mitigation in relation to the construction of quay structures for containers and to estimate economic values of environment-friendly structures using CVM. The result shows that the B/C ratio of environment-friendly quay structures designed to mitigate environmental impact is 4. That is, environmental improvement work proves to generate environmental benefit over 4 times as much as the construction cost. Considering the results of the study, environmental improvement work is of great benefit to citizens, and CVM is expected to become an efficient method to measure a proper size for a large construction project as well as to forge public consensus.

Knowledge Domain and Emerging Trends of Intelligent Green Building and Smart City - A Visual Analysis Using CiteSpace

  • Li, Hongyang;Dai, Mingjie
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.24-31
    • /
    • 2017
  • As the concept of sustainability becomes more and more popular, a large amount of literature have been recorded recently on intelligent green building and smart city (IGB&SC). It is therefore needed to systematically analyse the existing knowledge structure as well as the future new development of this domain through the identification of the thematic trends, landmark articles, typical keywords together with co-operative researchers. In this paper, Citespace software package is applied to analyse the citation networks and other relevant data of the past eleven years (from 2006 to 2016) collected from Web of Science (WOS). Through this, a series of professional document analysis are conducted, including the production of core authors, the influence made by the most cited authors, keywords extraction and timezone analysis, hot topics of research, highly cited papers and trends with regard to co-citation analysis, etc. As a result, the development track of the IGB&SC domains is revealed and visualized and the following results reached: (i) in the research area of IGB&SC, the most productive researcher is Winters JV and Caragliu A is most influential on the other hand; (ii) different focuses of IGB&SC research have been emerged continually from 2006 to 2016 e.g. smart growth, sustainability, smart city, big data, etc.; (iii) Hollands's work is identified with the most citations and the emerging trends, as revealed from the bursts analysis in document co-citations, can be concluded as smart growth, the assessment of intelligent green building and smart city.

  • PDF

New Paradigm and its Policy Framework in Decision-making on Large Dams

  • Park, Sungje
    • Journal of Wetlands Research
    • /
    • v.8 no.1
    • /
    • pp.97-106
    • /
    • 2006
  • This study discusses two canceled dam projects, Youngwol Dam in South Korea and Two Forks Dam in Colorado of the United States. Both of them illustrate how the new paradigm applies to regional water projects because they became victims of environmental opposition in the new paradigm. While the cases have no apparent close relationships and they occurred in different decades, they offer interesting comparisons. They were basically struggles between water development coalitions and environmental protection coalitions on regional water conflicts. The two proposed projects brought about fierce debates on large dam as they embraced a wide-range of environmental, social, and political issues rather than construction of dams themselves. Huge anti-dam oppositions scrapped them at the cost of nearly ten years for decision-makings and enormous financial resources for feasibility studies respectively. It identifies who the policy actors were, what the policy strategies were, and how the water policies evolved in both countries. The decision-makings on the two projects appeared at first glance to be made under formal institutional frameworks, but in actuality, they relied significantly on decisions of the two important political actors. The Korean society began to learn negotiation and cooperation approaches to solve the water conflict by establishing the Joint Task Force Team on Youngwol project in 1999. The team is recognized as a new conflict resolution method in South Korea because a diverse of stakeholder interests voluntarily participated in the decision-making process and discussed water issues directly. Even though the projects resulted in futile fruits in each country, they illustrate the images of the new paradigm that significantly affected in formulating regional water policies in South Korea and the United States.

  • PDF

Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis (IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가)

  • Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.145-156
    • /
    • 2024
  • In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.

Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

A Study on Countermeasures for Risk Factors Through Risk Analysis of Earthwork (흙막이공의 리스크 분석을 통한 리스크 요인별 대응 방안에 관한 연구)

  • Jeon, Byung Ju;Isah, Muritala Adebayo;Kim, Hyun Bee;Lee, Yang Gyu;Kim, Byung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.681-688
    • /
    • 2022
  • According to a recent study, most construction companies in Korea do not manage risk effectively, and it is judged that the risk management system needs to be improved. In addition, most risk-related studies deal with risks from a macroscopic perspective, and there are few studies dealing with process risks at the project construction stage. Therefore, this study tried to suggest a risk response plan through analysis and classification of risk factors that may occur in retaining work among process risks. To this end, a workshop was held for risk experts to identify and analyze risks that may occur during the construction of retaining work for apartments. As a result of the study, it was expected that savings of KRW 4.97 billion would be possible in the 95 % confidence interval, and the maximum possible cost was reduced from KRW 15 billion to about KRW 10 billion. Based on the risk reduction ratio, it was found that risks that can be reduced without any special input cost, risks with large effects in response to risks, and risks with insignificant effects were found. Therefore, using the types and risk factors presented in this study as guides, it is expected that it will be helpful in successfully operating the project if an appropriate response strategy is prepared and systematically responded to the site conditions.

A Case Study on the Construction at Near Verge Section of Secure Objects Using Electronic Detonators (전자뇌관을 이용한 보안물건 초근접구간 시공 사례)

  • Hwang, Nam-Sun;Lee, Dong-Hee;Lim, Il-soo;Kim, Jin-soo
    • Explosives and Blasting
    • /
    • v.37 no.2
    • /
    • pp.22-30
    • /
    • 2019
  • On sites where explosives are used, the effects of noise and vibration produced by the blast wave are subject to a number of operational restrictions. Recently, the number of civil complaints has increased and the standard of environmental regulations on secure goods has been greatly tighten. Therefore, work is generally carried out by machine excavation in case of close proximity of safety thing. Machine excavation methods have the advantage as reducing noise and vibration compared to blasting methods, but depending on the conditions of rock intended to be excavated, they are sometimes less constructive than planned. In general, the closer a rock type is to hard rock, the less constructible it becomes. In this paper, we are going to explain the construction of a construction section with a close proximity to a safety thing using electronic detonators. While the project site was designed with a machine excavation methods due to the close(9.9m) proximity of safety thing(the railroad), construction using electronic detonators was reviewed as an alternative method for improving rate of advance time and construction efficiency when expose to hard rock. Through blasting using electronic detonators, construction and economic efficiency were maximized while minimizing impact on surrounding safety things. Because $HiTRONIC^{TM}$, which is produced by Hanwha, has innovative stability and high explosion reliability, it is able to explode with high-precision accuracy. Electronic detonators are widely used in construction sites of railway or highway, other urban burrowing areas and large limestone mines.

Revision of related Regulations and Construction Standards for the Use of Information on Underground Facilities Quality Level (지하시설물 품질등급 정보의 활용을 위한 관련 규정 및 건설기준 개정 방안)

  • Park, Joon Kyu;Kim, Tae Hoon;Kim, Won Dae
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.4
    • /
    • pp.343-350
    • /
    • 2022
  • The computerization project for underground facilities in Korea began in earnest after the city gas explosion in Seoul in 1994, and the Daegu subway explosion in 1995. As such a large-scale gas explosion accident caused enormous economic loss including human casualties and potential benefits, the need for computerized for efficient management of underground facilities was greatly emphasized in society. Meantime, computerization of underground facilities has been carried out according to the basic plan for building national geographic information system. In this study, problems were identified based on the current status of construction and management of underground facility information, as well as laws and regulations, and directions for establishing quality standards were presented. In addition, construction work standards such as 「Public Survey Work Regulations」, design standards, standard specifications, and technical specifications, gas technology standards, design standards, and communication works so that underground facility information can be linked and utilized in construction work by examining the linkage of the underground facilities, the targets that can be used for quality level information on underground facilities were derived, and a proposal to revise the construction standards was presented. In the future, if the quality standards are established, it is expected that the accuracy and utilization in the construction field will be increased.