• Title/Summary/Keyword: large area tunnel

Search Result 149, Processing Time 0.024 seconds

The effect of delay time of nonelectric detonator on the level of vibration in surface blasting (노천발파에서 비전기식뇌관의 시간차가 진동의 크기에 미치는 영향)

  • 강추원
    • Tunnel and Underground Space
    • /
    • v.6 no.3
    • /
    • pp.267-273
    • /
    • 1996
  • The types of eletric detonators manufactured in korea include instantaneous, decisecond and millisecond delays but number of delay intervals are only limited from No. 1 to No. 20 respectively. It is not sufficient to control accurately millisecond time with these detonators in large surface blasting. But nonelectric system detonators with an unlimited delay time are recently obtained. In this paper the effect of delay time of nonelectric detonator on the level of vibration in surface blasting was studied. A total of 169 data were recorded in the studied area. Blast point-to-measuring point distances ranged from 25 to 100 meter, where charge weight was 1.26 kg per delay.

  • PDF

A Case Study about the Slope Collapse and Reinforcement Method on the Infinite Slope (무한사면에서의 사면붕괴와 보강대책 사례연구)

  • You Byung-Ok;Hong Jung-Pyo;Jun Jong-Hern;Lee Tae-Sun;Min Kyoung-Nam
    • Tunnel and Underground Space
    • /
    • v.16 no.2 s.61
    • /
    • pp.146-155
    • /
    • 2006
  • The target slope of this study, formed during the construction of highway, is the very high infinite slope where sliding began along the discontinuity. Although an attempt was made to stabilize the upper part of the slope by installing the rock anchors, large scale failure was occurred at the lower part if the reinforced area. Afterwards, subsequent failures were observed two times. To investigate the cause of the failure, residual shear strength was measured by performing the direct shear test of rock specimen of the site. The anchor design was based on the pull-out test. Considering the slope surface where the undulation was severe and the variation of strength was very large, buttressing was used to obtain the required anchoring capacity.

A Study on Sensitivity of Pollutant Dispersion to Inflow Wind Speed and Turbulent Schmidt Number in a Street Canyon (도시 협곡에서 유입류 풍속과 난류 슈미트수에 대한 대기오염물질 확산의 민감도 연구)

  • Wang, Jang-Woon;Kim, Jae-Jin
    • Atmosphere
    • /
    • v.25 no.4
    • /
    • pp.659-667
    • /
    • 2015
  • In this study, sensitivity of inflow wind speed and turbulent Schmidt number to pollutant dispersion in an urban street canyon is investigated, by comparing CFD-simulated results to wind-tunnel results. For this, we changed systematically inflow wind speed at the street-canyon height ($1.5{\sim}10.0m\;s^{-1}$ with the increment of $0.5m\;s^{-1}$) and turbulent Schmidt number (0.2~1.3 with interval of 0.1). Also, we performed numerical experiments under the conditions that turbulent Schmidt numbers selected with the magnitude of mean kinetic energy at each grid point were assigned in the street canyon. With the increase of the inflow wind speed, the model underestimated (overestimated) pollutant concentration in the upwind (downwind) side of the street canyon because of the increase of pollutant advection. This implies that, for more realistic reproduction of pollutant dispersion in urban street canyons, large (small) turbulent Schmidt number should be assigned for week (strong) inflow condition. In the cases of selectively assigned turbulent Schmidt number, mean bias remarkably decreased (maximum 60%) compared to the cases of constant turbulent Schmidt number assigned. At week (strong) inflow wind speed, root mean square error decreases as the area where turbulent Schmidt number is selectively assigned becomes large (small).

Estimation of Topographic Effects over 3-Dimensional Hills with Different Slopes through Wind Tunnel Tests (경사가 다른 3차원 산악지형에서의 풍동실험을 통한 풍속할증평가)

  • Cho, Kang-Pyo;Cheong, Myung-Chae;Cho, Gi-Sung
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.20 no.3
    • /
    • pp.379-386
    • /
    • 2007
  • In this paper, topographic factors over 3-dimensional hills were estimated through wind tunnel tests. Topographic models having five different slopes of $5.71^{\circ}, \;11.31^{\circ},\;16.70^{\circ},\;21.80^{\circ}$, and $26.57^{\circ}$ which were based on Korean Building Code(KBC(2005), were made for wind tunnel tests. From the result of wind tunnel tests, topographic factors over 3-dimensional hills were obtained at various locations, and the ranges of topographic effects were decided. The ranges of topographic effects was whole area of the hills in the horizontal ranges and heights of 3.5 times of the hills in the vortical ranges. Topographic effects was large at the top of hills, and wind velocity was increased 57% over hill of $5.71^{\circ}$, 75% over hill of $11.31^{\circ}$, 79% over hill of $16.70^{\circ}$, 81% over hill of $21.80^{\circ}$, and 61% over hill of $26.57^{\circ}$. Wind velocity was bigger over surface of across-wind direction of hills than one over surface of wind direction of hills, and wind velocity was increased $10{\sim}30%$ at locations of across-wind direction.

Relation of Groundwater Flow Rate and Fracture System Associated with Waterway Tunnel Excavation (도수로터널 굴착에 따른 지하수 유출량과 단열의 관련성)

  • 이병대;조병욱;성익환;함세영;이춘오
    • The Journal of Engineering Geology
    • /
    • v.11 no.3
    • /
    • pp.327-337
    • /
    • 2001
  • To verify the characteristics of groundwater inflow accompanied by the tunnel excavation, the flow rate was measured before and after primary grouting. The relationship between the flow rate and fracture system was also analyzed. The initial flow rate was estimated as 120,990 m$^3$/day through six zones, which were characterized by a large amount of inflow before the primary grouting. After the primary grouting, although considerable amount of inflow was still recognized at the six zones, the flow rate was greatly reduced as 42,844 m$^3$/day. However, great recovery of water levels was not observed. Groundwater flow into the tunnel by excavation of the tunnel is mainly controlled by the fracture system that include faults and joints developed in the host rocks. Four sets of discontinuities affecting on the network of grondwater inflow in the study area were identified as follows: N60-85$^{\circ}C$ W.25$^{\circ}$SW/80$^{\circ}$SW(TSet 1), N40-50$^{\circ}$E.85$^{\circ}$SE/85$^{\circ}$NE(TSet 2), N10-20$^{\circ}$E.85$^{\circ}$SE(TSet 3), and N70-80$^{\circ}$E.80SE(TSet 4).

  • PDF

Pressure Analysis and Conceptual Design for Indoor Ballistic Test Range by Numerical Methods (수치해석기법을 이용한 실내시험장 압력특성해석 및 개념설계)

  • Jung, Hui-Young;Park, Kwan-Jin;Kim, Nam-Hyuk
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.20 no.1
    • /
    • pp.55-62
    • /
    • 2017
  • For evaluating a large caliber ammunition tests, indoor ballistic test range is required to reduce the noise and fragments occurring during the test. To ensure the reliability of the indoor ballistics test range design, we carried out the analysis of the indoor test range using the AUTODYNE hydrodynamic code before its construction. The 120 mm tank ammunition is adopted as a reference model and we analysed the characteristics of the pressure distribution at fire area, the structure design at impact area, the over-pressure applied to the tunnel, and the sabot stopper design. The results of the analysis were applied to the design of the indoor ballistic test range.

The Construction of Seoul Subway Line 3 and 4

  • Huh, Ginn
    • Journal of the Korean Professional Engineers Association
    • /
    • v.18 no.3
    • /
    • pp.1-20
    • /
    • 1985
  • The traffic congestion of Seoul city has been one of the most serious problems to be settled since the advent of 1970s. As a means to mitigate traffic mess, the authority concerned launched the construction of subway line 3 and 4 in 1980. The two Subway lines slated for completion by 1985 cross each other and run north-south direction, passing through the metropolitan area of Seoul city fraught with high-rise edifices and large-scale shopping centers, and, in order to reduce blasting vibration, NATM was executed for a distance of 10 Km, instead of ASSM previously employed when subway line 1 and 2 were constructed. Tunnel blastings were implemented, preceded by classifying the rocks at construction area into five categories, namely, hard rock, semi-hard rock, weak rock weathered rock and silt and by calculating their respective specific charges through standard test blastings, by employing the pre-splitting and smooth blasting with drilling patterns of burn cut type, so as not to cause damages to surface structures. Most of explosives used were the slurry of low specific gravity and low velocity, and the firings executed by the use of milli-second detonators. Empiric formula were also formulated to check blasting vibrations, based on the vibration allowable values of West Germany standard, for the application to vulnerable construction zones. Should the two lines be placed for public service in 1985, about 40% of the total traffic population of Seoul city amounting to 15 million as of 1984 is estimated to be carried by subway with no difficulties.

  • PDF

Biomechanical Test for Repair Technique of Full-thickness Rotator Cuff Tear

  • Lim, Chae-Ouk;Park, Kyoung-Jin
    • Clinics in Shoulder and Elbow
    • /
    • v.19 no.1
    • /
    • pp.51-58
    • /
    • 2016
  • The arthroscopic rotator cuff repair is now considered a mainstream technique with highly satisfactory clinical results. However, concerns remain regarding healing failures for large and massive tears and high revision rate. In recent decades, various repair strategies and construct configurations have been developed for rotator cuff repair with the understanding that many factors contribute to the structural integrity of the repaired construct. The focus of biomechanical test in arthroscopic repair has been on increasing fixation strength and restoration of the footprint contact characteristics to provide early rehabilitation and improve healing. These include repaired rotator cuff tendon-footprint motion, increased tendon-footprint contact area and pressure, and tissue quality of tendon and bone. Recent studies have shown that a transosseous tunnel technique provides improved contact area and pressure between rotator cuff tendon and insertion footprint, and the technique of using double rows of suture anchors to recreate the native footprint attachment has been recently described. The transosseous equivalent suture bridge technique has the highest contact pressure and fixation force. In this review, the biomechanical tests about repair techniques of rotator cuff tear will be reviewed and discussed.

Control effect and mechanism investigation on the horizontal flow-isolating plate for PI shaped bridge decks' VIV stability

  • Li, Ke;Qian, Guowei;Ge, Yaojun;Zhao, Lin;Di, Jin
    • Wind and Structures
    • /
    • v.28 no.2
    • /
    • pp.99-110
    • /
    • 2019
  • Vortex-Induced-Vibration (VIV) is one kind of the wind-induced vibrations, which may occur in the construction and operation period of bridges. This phenomenon can bring negative effects to the traffic safety or can cause bridge fatigue damage and should be eliminated or controlled within safe amplitudes.In the current VIV studies, one available mitigation countermeasure, the horizontal flow-isolating plate, shows satisfactory performance particularly in PI shaped bridge deck type. Details of the wind tunnel test are firstly presented to give an overall description of this appendage and its control effect. Then, the computational-fluid-dynamics(CFD) method is introduced to investigate the control mechanism, using two-dimensional Large-Eddy-Simulation to reproduce the VIV process. The Reynolds number of the cases involved in this paper ranges from $1{\times}10^5$ to $3{\times}10^5$, using the width of bridge deck as reference length. A field-filter technique and detailed analysis on wall pressure are used to give an intuitive demonstration of the changes brought by the horizontal flow-isolating plate. Results show that this aerodynamic appendage is equally effective in suppressing vertical and torsional VIV, indicating inspiring application prospect in similar PI shaped bridge decks.

Evaluation of Optical Porosity of Thuja occidentalis by Image Analysis and Correlation with Aerodynamic Coefficients (이미지 분석을 통한 서양측백나무의 광학적 공극도 산정 및 공기역학계수와의 상관성 평가)

  • Jang, Dong-hwa;Yang, Ka-Young;Kim, Jong-bok;Kwon, Kyeong-seok;Ha, Taehwan
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.63 no.6
    • /
    • pp.39-47
    • /
    • 2021
  • Reduction effect of the spread of odorant and fine dust through windbreak trees can be predicted through numerical analysis. However, there is a disadvantage that a large space and destructive experiments must be carried out each time to calculate the aerodynamic coefficient of the tree. In order to overcome these shortcomings, In this study, we aimed to estimate the aerodynamic coefficient (C0, C1, C2) by using image processing. Thuja occidentalis, which can be used as windbreak were used as the material. The leaf area index was estimated from the leaf area ratio using image processing with leaf weight, and the optical porosity was calculated through image processing of photos taken from the side while removing the leaves step-by-step. Correlation analysis was conducted with the aerodynamic coefficient of Thuja occidentalis calculated from the wind tunnel test and leaf area index and optical porosity calculated from the image analysis. The aerodynamic coefficient showed positive and negative correlations with the leaf area index and optical porosity, respectively. The results showed that the possibility of estimating the aerodynamic coefficient using image processing.