Ryu, Hee Hwan;Cho, Seon Ah;Kim, Kyoung Yul;Cho, Gye Chun
Journal of Korean Tunnelling and Underground Space Association
/
v.19
no.3
/
pp.449-461
/
2017
The uncertain existence and insufficient information of underground structures, such as pipe lines and cable tunnels, is causing many problems related to route plan, design, construction of new underground structures. The theoretical equations that is able to predict the location, size, and direction of underground structures through electric field analysis are suggested at the previous study (Ryu., 2015). Three field tests were performed for predicting the location, size, and direction of underground structures and the existence and size of sink-hole. Prediction results were reflected at the design and follow-up measures were performed.
Lynch, Jerome Peter;Law, Kincho H.;Kiremidjian, Anne S.;Carryer, Ed;Farrar, Charles R.;Sohn, Hoon;Allen, David W.;Nadler, Brett;Wait, Jeannette R.
Structural Engineering and Mechanics
/
v.17
no.3_4
/
pp.393-408
/
2004
There exists a clear need to monitor the performance of civil structures over their operational lives. Current commercial monitoring systems suffer from various technological and economic limitations that prevent their widespread adoption. The wires used to route measurements from system sensors to the centralized data server represent one of the greatest limitations since they are physically vulnerable and expensive from an installation and maintenance standpoint. In lieu of cables, the introduction of low-cost wireless communications is proposed. The result is the design of a prototype wireless sensing unit that can serve as the fundamental building block of wireless modular monitoring systems (WiMMS). An additional feature of the wireless sensing unit is the incorporation of computational power in the form of state-of-art microcontrollers. The prototype unit is validated with a series of laboratory and field tests. The Alamosa Canyon Bridge is employed to serve as a full-scale benchmark structure to validate the performance of the wireless sensing unit in the field. A traditional cable-based monitoring system is installed in parallel with the wireless sensing units for performance comparison.
Compaction of asphalt pavement is one of the important processes to make good quality one. There are many laboratory-compaction methods to simulate field compaction, including Marshall compaction, Hveem compaction, gyratory compaction, and etc. The most common method used to determine the fundamental properties of asphalt mixture for design is Marshall method which is using impact energy. However, there is major difference between field compaction using kneading compaction and Marshall compaction using impact energy. Therefore, the gyratory compactor, which currently is the best to simulate the field compaction, was employed. The fundamental properties of asphalt specimen compacted by gyratory compactor and Marshall compactor were determined using laboratory test. From the tests, slag mixture with carbon black or pyrolyzed carbon black showed better performances, such as, in low susceptibility to temperature, high resistance against water and rutting, and high resilient modulus and indirect tensile strength.
Journal of The Korean Society of Agricultural Engineers
/
v.52
no.4
/
pp.45-52
/
2010
The purposes of this research are to analyze the internal settlement behavior of Concrete Faced Rockfill Dam (CFRD) typed 'D dam' and to evaluate the stability of the 'D dam' during dam construction using internal settlement measurements and results of numerical analysis. The field measurements were obtained during dam construction period. The numerical analysis was also carried out for the same construction period. The numerical analysis focused mainly on prediction of stress and displacement behavior of 'D dam' during dam construction stage using input parameters obtained from laboratory tests, i.e. large triaxial tests. The behavior of 'D dam' was evaluated to be stable from comparing the results of field measurements and numerical analysis. A simple empirical equation is also presented to predict final settlement at the completion of dam construction, using settlement measurement monitored during dam embankment.
The load transfer depth of a ground anchor is the minimum length required to transfer the initial prestressing to the grout column through the bonded part. A thorough understanding of the mechanism of load transfer as well as accurate prediction of the load transfer depth are essential for designing an anchorage that has an adequate factor of safety and satisfies implicit economic criteria. In the current research, experimental and numerical studies were conducted to investigate the load transfer mechanism of ground anchors based on a series of laboratory and field load tests. Optical FBG sensors embedded in the central king cable of a seven-wire strand were successfully employed to monitor the changes in tensile force and its distribution along the tendons. Moreover, results from laboratory and in-situ pullout tests were compared with those from equivalent case studies simulated using the finite difference method in the FLAC 3D program. All the results obtained from the two proposed methods were remarkably consistent with respect to the load increments. They were similar not only in trend but also in magnitude and showed more consistency at higher pullout loading stages, especially the final loading stage. Furthermore, the estimated load transfer depth demonstrated a pronounced dependency on the surrounding ground condition, being shorter in hard ground conditions and longer in weaker ones. Finally, considering the safety factor and cost-effective design, the required bonded length of a ground anchor was formulated in terms of the load transfer depth.
Kim, Hong-Taek;Park, Si-Sam;Cho, Byeong-Guk;Jung, Sung-Pil
Proceedings of the Korean Geotechical Society Conference
/
2004.03b
/
pp.342-347
/
2004
Excavation nearby the existing structures is being performed vigorously to get the greatest use of land along with fast economic growth in the downtown area. The application of soil nailing system gradually increases because of an advantage of soil nailing system adjacently constructed in the existing structures. In this study, friction resistance by pull-out is considered as main resistance except resistance formed by flexural rigidity of nail observing that resistance of flexural rigidity is about $0{\sim}15\;%$ of whole safety factor according to degree of flexural rigidity in general soil nail wall and application of geosynthetic fiber soil nailing system is evaluated through laboratory tensile strength test and field pull-out test.
Yang, Byoung Seon;Choi, Se Mook;Bae, Hyung Joon;Kim, Yoon Sik;Lim, Yong;Kang, Hee Jung;Bae, Do Hee;Choi, Byoung Ho;Lee, Jae Suk;Park, Ji Ae
Korean Journal of Clinical Laboratory Science
/
v.54
no.1
/
pp.49-60
/
2022
This study attempted to provide the basic data for developing a system to identify the role of medical technologists and ensure an efficient response for quick and accurate diagnostic tests in the COVID-19 era. The research method involved using focus group interviews for a survey and analysis of 15 medical institutions. Eleven sample collection institutions, 10.4 medical technologists, 2.1 minutes of collection time, 5.4 hours of test time, 9,670 tests, 6.2 member test workforce size, and 7 screening center operating institutions were surveyed. The results of the focus group interview analysis revealed that there were no standardized guidelines covering working hours, area, and environment to protect sample collectors and testers in relation to the COVID-19 tests. Also, legal protection measures were insufficient in the event of accidental infections and there were no personnel regulations related to COVID-19. In addition, the professional training of sample collectors and molecular diagnostic testers was required for reliable COVID-19 testing. In conclusion, it is necessary to provide professional education through special test short-term training institutions to cope with emergency infectious diseases such as COVID-19. Legal systems should be put in place to protect the workforce and ensure stability.
Journal of Korean Tunnelling and Underground Space Association
/
v.6
no.2
/
pp.161-169
/
2004
In this study, a similarity rule is thoroughly discussed for tunnelling model tests which can simulate actual ground conditions. Based on this prior consideration, theoretical works are performed to simulate a real ground condition into a gravitational field with a similarity. A process is arranged to determine a lining condition in laboratory tests for a sandy ground tunnel.
It is very improtant to evaluate the reliable nonlinear deformational characteristics of soils not only in the analysis of geotechnical structures under working stress conditions but also for the soil dynamic problems. Field testings such as crosshole and pressuremeter tests can be used to determine the modulus of soils under in-situ conditions, but it is not possible to determine the modulus over the entire strain amplitude range. Laboratory methods such as resonant column 1 torsional shear test can be used to determine the modulus over the whole strain amplitude range, but it is very difficult to obtain the representative undisturbed samples on the sixte. For the reliable evaluation of nonlinear deformation characteristics of soils on a typical site, small strain modulus obtained from field testy and nomalized modulus reduction curve determined by laboratory bests need to be combined. In this paper, laboratory and Held testy were performed at a sixte which consisted of granite wearthered residual boils to evaluate the nonlinear deformational characteristics of coils such as the effects of strain amplitude, loading frequency, confining pressure and sample disturbance. It has been shorn that when the effects of these factors are properly taken into account, the stiffness values evaluated by various field and labrotary tests are comparable to each other fairly well. Finally, the procedure to evaluate the nonlinear deformstional characteristics of the sixte was proposed.
Compressibility of the marine clay was mainly studied velocity of consolidation and numerical analysis by this time but studies of reevaluated from the field measurement data was a little. For last three years, areal fills and extensive field instrumentations including settlement and pore water pressure were performed in the site of the Youngsan River estuary site, South Korea. From the settlement data, field consolidation curves for sub-layers were reconstructed. Effective surcharge loads during the staged loadings were calculated using the fill heights and the excess pore water pressures in the ground. In the numerical analysis (PLAXIS), prefabricated vertical drains were also simulated. Laboratory, field, and numerical analysis showed good agreements in compressibility. Due to different conditions and limitations of the clay was the same range of the oedometer tests.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.