• Title/Summary/Keyword: labor cost index

Search Result 59, Processing Time 0.021 seconds

Analysing Construction Cost Index Fluctuation on Apartment Housing (공동주택 건설공사비지수의 변동추세 분석)

  • Park, Won-Young;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.226-227
    • /
    • 2019
  • The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.

  • PDF

Analysis of Construction Cost Fluctuation Trends and Features on Apartment Housing

  • Park, Wonyoung;Kang, Tai-Kyung;Baek, Seung-Ho;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.624-635
    • /
    • 2012
  • Construction projects, including housing, are carried out over long periods of time. According to changes to the construction period, the cost of input materials and wages also changes. Therefore appropriate management is important in order to minimize cost risks caused by fluctuations in prices. In Korea, housing units are usually sold in lots prior to construction completion. Therefore, careful management of input elements such as materials and equipment that are sensitive to price fluctuations is very important. This study deals with how the price fluctuation of materials, labor, and equipment influences the change of housing cost and seeks a way for cost management through identifying key resources sensitive to price fluctuation. As a result, a change to the housing cost index multiplies depending on cost changes of materials and labor together. Labor costs are a major factor on the housing cost index. In addition, certain types of materials and labor input to housing construction greatly influence price fluctuations. Thus, it is found that managing those main cost factors is the key for effective cost management.

A Basic Study for Developing the Construction Cost Index by Directly Surveying the Cost Input Structure in Korea - Focused on Highway Construction Projects - (원가투입구조의 직접 조사에 의한 국내 건설공사비지수 개발을 위한 기초연구 - 도로시설물 중심으로 -)

  • Kim, Woo-Young;Yi, June-Seong;Lee, Young-Hwan;Lee, Bok-Nam;Kim, Yoon-Joo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.53-61
    • /
    • 2006
  • Korean Government started to publish Korean CCI(Construction Cost Index) again at February 2004 since CAK(Construction Association of Korea) stopped publishing it 1994. CCI is developed using the verified statistical data, that is, input-output table and producer price index by Korean Bank and labor unit cost by CAK. Though the method is available as it uses the verified statistical data, there is a limitation to reflect the characteristics of construction. For overcoming this limitation, this study suggests CCI development method investigating the input structure of labor and material cost for each type of construction project and applying the cost variations of the items.

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

A Study on the Escalation Method for Contract Adjustment Public Construction Project (물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구)

  • Bae Kyoung-Tae;Choi Dong-Soo;Hwang Chi Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

Factors Affecting Productivity for University Food Service Operations (대학급식소의 생산성 요인분석)

  • 조순희;홍성야
    • Korean journal of food and cookery science
    • /
    • v.14 no.4
    • /
    • pp.407-415
    • /
    • 1998
  • The objectives of this study were to analyze the factors that affect the productivity for university food services. In a survey involving four-year university dining centers throughout the country, and correlations among thriteen different variables that affect productivity were determined. Productivity index (PI) was determined by meals per hour, the average score for 38 institutions was found to be 14.2 meals/hour. For serving methods, the fixed ration had a higher PI than the self-serving. When two types of serving trays were considered, the PI of the compartmantalized trays was higher than that of the tray accompanying saparate small dishes. When single (S)-or. multiple(M)-menu was compared with the cafeteria style, a higher PI was obtained by the S-or M-menu. Among the three operation systems, the PI was found to be the highest by direct operation (17.6 meals/hour), followed by contract operation (11.1 meals/hour) and rent operation (7.9 meals/hour). For the factors that affect the productivity of the university food services, the total number sewed (r=0.54, p<0.001) and the use of convenient food items (r=0.28, P<0.05) exhibited positive correlations, while food costs and labor costs showed negative correlations. This suggests that the productivity of university food service increases as the total number served and the use of convenient food item increased, but decreases as the food costs and labor costs per meal increased. A regression analysis showed that three variables - total number sewed, labor cost per meal, number of employees-influenced about 73% components of food service showed a negative correlation with PI and a positive correlation with the labor cost per meal.

  • PDF

Effectiveness of the Preprocessed Foods on Productivity and Satisfaction in School Foodservices (전처리 식재료 사용이 학교급식 생산성과 만족도에 미치는 영향)

  • Yun, Hye-Jung;Chang, Hye-Ja
    • Journal of the Korean Dietetic Association
    • /
    • v.15 no.3
    • /
    • pp.262-277
    • /
    • 2009
  • Fresh-cut foods have been widely used in the school foodservice industry due to their convenience and saving effects of labor and working hours. This study evaluated the effectiveness of using fresh-cut foods in school foodservice with respect to cost efficiency, customer satisfaction, employee satisfaction, and productivity. First, in terms of cost efficiency, the cost of the fresh-cut food per meal price significantly increased by 2.6% via the new production plan. Meanwhile, the costs of labor and food wastes significantly decreased by 3.0% and 0.3%, respectively, after implementing the new plan. Second, customer satisfaction towards foodservice significantly increased, from 2.94 points prior to the new plan to 3.45 points. Third, foodservice productivity such as of the number of meals per full-time equivalent employee increased by 5.7 meals, from 143.0 meals to 148.7 meals after intervention. The productivity index of work hours for producing a meal also increased and was reflected by a work time reduction of 0.77 minutes, specifically from 4.25 minutes to 3.48 minutes. The labor cost per meal also decreased by 29.9 won, from 331.91 won to 301.97 won, but there was no significant difference. Through these results, we identified that using pre-process foods in school foodservice has positive effects on labor saving, customer satisfaction, and employee work satisfaction.

  • PDF

A Study on the Construction Cost Index for Calculating Conceptual Estimation : 1970-1999 (개략공사비 산출을 위한 공사비 지수 연구 : 1970-1999)

  • Nam, Song Hyun;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.5
    • /
    • pp.527-534
    • /
    • 2020
  • A significant factor in construction work is cost. At early- and advanced-stage design, costs should be calculated to derive realistic cost estimates according to unit price calculation. Based on these estimates, the economic feasibility of construction work is assessed, and whether to proceed is determined. Through the Korea Institute of Civil Engineering and Building Technology, the construction cost index has been calculated by indirect methods after both the producer price index and construction market labor have been reprocessed to easily adjust the price changes of construction costs in Korea, and the Institute has announced it since 2004. As of January 2000, however, the construction cost index was released, and this has a time constraint on the correction and use of past construction cost data to the present moment. Variables were calculated to compute a rough construction cost that utilized past construction costs through surveys of the producer price index and the construction market labor force consisting of the construction cost index. After significant independent variables among the many variables were selected through correlation analysis, the construction cost index from 1970 to 1999 was calculated and presented through multiple regression analysis. This study therefore has prominent significance in terms of proposing a method of calculating rough construction costs that utilize construction costs that pre-date the 2000s.

The Development of the Composite Index as a method of rate adjustment (의료보험수가 조정을 위한 복합지표 개발에 관한 연구)

  • 김한중;조우현;이해종
    • Health Policy and Management
    • /
    • v.3 no.1
    • /
    • pp.84-101
    • /
    • 1993
  • The current method of rate adjustment is based on the evaluation of the financial performance of hospitals. The method has the disadvantages such as too complicated, expensive process as well as low reliability due to small sample size. This study, therefore, develops a new model for the rate adjustment with the use of the composite index. In addition to that, it examines the validity of the model by comparing the result of the new method with that of the conventional method. The idea of the new model comes from the Medicare Economic Index(MEI) on which physician fees for the Medicare patients are adjusted periodically in the United States. Medical costs are classified into three groups : labor costs, materials and other expenses. Labor costs are subdivided into physicians and other personnels. Materials are subdivided into drugs and others. Other expenses are subdivided into 5 items. Macro economic indices are selected for each cost item in order to reflect the cost inflation during the specific period. Then the composite index which integrate all items according to the ration of each item in the total costs is calculated. The result from the application of empirical data to the new model is very similar to that of the current method. Furthermore, this method is very simple and also to easy to get social concensus. This model can be replaced the current method based on the analysis of the financial performance for the adjustment of medical fees.

  • PDF

Development of Electrical Construction Cost Index Applied Chain-Weighted Method (연쇄방식 전기공사비지수 개발에 관한 연구)

  • Park, Houng-Hee;Choi, Seung-Dong;Hyun, So-Young;Park, Min-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.49-60
    • /
    • 2014
  • Electrical construction cost index has been applied fixed-weighted method. But fixed-weighted method can't faithfully reflect industrial structure changes. Because the weighted value and price index of fixed-weighted method is fixed on the basic period. Electrical construction cost index is composed of the cost of labor and material. So it fluctuates sharply whenever the construction association of korea announces the laborer's wage of electrical construction. And it depends on only the producer price index changes that is related to electrical construction since then. So a study is focused on developing electrical construction cost index applied chain-weighted method. Because chain-weighted method can reflect the realities of the electrical construction and alleviate the sudden changes of labor cost with link index. We verify that chain-weighted method relieves the step states of electrical construction cost index applied fixed-weighted method.