• Title/Summary/Keyword: karst conduit

Search Result 4, Processing Time 0.021 seconds

Application of activated carbon bugs to the dye tracer study in a Karst area

  • Hwang Hyeon-Tae;Lee Myeong-Jae;Choi Ye-Gwon;Mok Jong-Gu;Lee Jin-Yong;Kim Yong-Cheol;Yeom Byeong-U
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2006.04a
    • /
    • pp.407-410
    • /
    • 2006
  • Studies were performed on evaluating the applicability of activated carbon bugs on dye tracer tests as tracer detectors by using its adsorption isotherm of the grained activated carbon. We preliminary conducted several standard adsorption and extraction tests and obtained the relationship between standard dye solution and detected concentrations from activated carbon samples in dry and wet conditions. the slopes of the regression line were 0.71 for wet condition and 0.74 for dried one. Field dye tracer tests were performed in a karst area, where several faults occur along a stream and pass the test area. We sampled water samples and activated carbon samples at three points in Hwangji Pond, where groundwater outflows from the karst conduit. According to the results of breakthrough curve analysis, the regional flow along the conduit, which is assumed to cause a karst conduit, was estimated as 0.18 m/day. The relationship between the concentrations of water sample and extracted activated carbon bugs shows the similar slopes with those from standard solution tests. This suggests that activated carbon could be useful as a dye tracer detector because the extraced concentration can be quantified.

  • PDF

태백시 황지용해공동의 수리지구화학적 연구

  • Kim Yong-Cheol;Kim Yu-Hong;Go Dong-Chan;Lee Jin-Yong;Yeom Byeong-U
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2006.04a
    • /
    • pp.97-99
    • /
    • 2006
  • Occurrence of Hwangji pond in Taebaek karst area was investigated in various hydrogeochemical ways and it is found out that there are underground cavern network and sinkholes under the pavement of Taebaek city. It is partially proved by dye tracing method.

  • PDF

Experimental investigation of blocking mechanism for grouting in water-filled karst conduits

  • Zehua Bu;Zhenhao Xu;Dongdong Pan;Haiyan Li;Jie Liu;Zhaofeng Li
    • Geomechanics and Engineering
    • /
    • v.34 no.2
    • /
    • pp.155-171
    • /
    • 2023
  • Aiming at the grouting treatment of water inflow in karst conduits, a visualized experiment system for conduit-type grouting blocking was developed. Through the improved water supply system and grouting system, and the optimized multisource information monitoring system, the real-time observation of diffusion and deposition of slurry, and the data acquisition of pressure and velocity during the whole process of grouting were realized, which breaks through the problem that the monitoring element is easy to fail due to slurry adhesion in conventional test system. Based on the grouting experiments in static and flowing water, the diffusion and deposition behavior of the quick-setting slurry under different working conditions were analyzed. The temporal and spatial variation behavior of the pressure and velocity were studied, and the blocking mechanism of the grouting were further revealed. The results showed that: (1) Under the flowing water condition, the counter-flow diffusion distance of slurry was negatively correlated with the flow water velocity and the volume ratio of cement and sodium silicate (C-S ratio), and positively correlated with the grouting volume. The slurry deposition thickness was negatively correlated with the flowing water velocity, and positively correlated with the grouting volume and C-S ratio. (2) The pressure increased slowly before blocking of the flowing water and rapidly after blocking in karst conduits. (3) With the continuous progress of grouting, the flowing water velocity decreased slowly first, then significantly, and finally tended to be stable. According to the research results, some engineering recommendations were put forward for the grouting treatment of the conduit-type water inflow disaster, which has been successfully applied in the treatment project of the China Resources Cement (Pingnan) Limestone Mine. This study provided some guidance and reference for the parameter optimization of grouting for the treatment projects of water inflow in karst conduits.

Combined bi-borehole technology for grouting and blocking of flowing water in karst conduits: Numerical investigation and engineering application

  • Pan, Dongdong;Zhang, Yichi;Xu, Zhenhao;Li, Haiyan;Li, Zhaofeng
    • Geomechanics and Engineering
    • /
    • v.29 no.4
    • /
    • pp.391-405
    • /
    • 2022
  • A newly proposed grouting simulation method, the sequential diffusion solidification method was introduced into the numerical simulation of combined bi-borehole grouting. The traditional, critical and difficult numerical problem for the temporal and spatial variation simulation of the slurry is solved. Thus, numerical simulation of grouting and blocking of flowing water in karst conduits is realized and the mechanism understanding of the combined bi-borehole technology is promoted. The sensitivity analysis of the influence factors of combined bi-borehole grouting was investigated. Through orthogonal experiment, the influences of proximal and distal slurry properties, the initial flow velocity of the conduit and the proximal and distal slurry injection rate on the blocking efficiency are compared. The velocity variation, pressure variation and slurry deposition phenomenon were monitored, and the flow field characteristics and slurry outflow behavior were analyzed. The interaction mechanism between the proximal and distal slurries in the combined bi-borehole grouting is revealed. The results show that, under the orthogonal experiment conditions, the slurry injection rate has the greatest impact on blocking. With a constant slurry injection rate, the blocking efficiency can be increased by more than 30% when using slurry with weak time-dependent viscosity behavior in the distal borehole and slurry with strong time-dependent viscosity behavior in the proximal borehole respectively. According to the results of numerical simulation, the grouting scheme of "intercept the flow from the proximal borehole by quick-setting slurry, and grout cement slurry from the distal borehole" is put forward and successfully applied to the water inflow treatment project of China Resources Cement (Pingnan) Limestone Mine.