• Title/Summary/Keyword: iterative equation

Search Result 321, Processing Time 0.019 seconds

The Analysis of Cost Structure and Productivity in the Korea and Japan Railroad Industry (한국과 일본 철도산업의 비용구조와 생산성 분석)

  • Park, Jin-Gyeong;Kim, Seong-Su
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.2 s.88
    • /
    • pp.65-78
    • /
    • 2006
  • This paper investigates the cost structure ot the Korea and Japan railroad industry with respect to density, scale and scope economies as well as productivity growth rate using a generalized trans)og multiproduct cost function model. The paper then assumes that the Korea and Japan railway companies pi·educe three outputs (incumbent railway passenger-kilometers. Shinkansen passenger-kilometers, ton-kilometers of freight) using four input factors (labor, fuel, maintenance, rolling stock and capital). The specified cost function includes foul other independent variables: track lengths to reflect network effects, two dummies to reflect nation and ownership effects, and time trend as a proxy for technical change. The simultaneous equation system consisting of a cost function and three input share equations is estimated with the Zellner's iterative seemingly unrelated regression. The unbalanced panel data used in the paper, a total of 154 observations. are collected from the annual records of the Korea National Railroad (KNR) for the yews $1977{\sim}2003$, Japan National Railways (JNR) for the years $1977{\sim}1984$. seven Japan Railways (JR's) for the years $1987{\sim}2003$. The findings show that the Korean and Japanese railways exhibit product-specific and overall economies of density but product-specific diseconomies of scale with respect to incumbent railway passenger-kilometers, Shinkansen-kilometers and ton-kilometers. However, the railways experience mild overall economies of scale which result from economies of scope associated with the joint production of incumbent railway/Shinkansen and feight, freight/incumbent railway and Shinkansen except Shinkansen/incumbent railway and freight. In addition, the economies of density and scale in the KNR, JR east, JR central, and JR west companies at the point of the years $1990{\sim}2003$ average is generally analogous to the above results at the point of sample average. There also appear to be economies of ssope associated with the joint Production of the incumbent railway and Shinkansen in JR central but diseconomies of scope in JR East and JR West. The findings also indicate that the productivity growth rate of the privately-owned JR's is larger than that of the government-owned KNR.