Voltage harmonics resulting from current harmonics produced by the nonlinear loads have become a serious problem in many systems. Moreover momentary interruptions and voltage sags are responsible for many of the power quality problems found in typical industrial plants. In this paper, proposed power system using series active power filter is not only harmonic compensation but also harmonic isolation between supply and load, and voltage regulation and unbalance compensation. The effectiveness of the proposed system is verified through computer simulations and experiments
Proceedings of the Korean Society of Precision Engineering Conference
/
2005.06a
/
pp.1341-1344
/
2005
This study was aimed to verify the acceptable contact force between power collector and 3rd rail type conductor rail for the Korean standardized rubber-tired AGT light rail vehicle. The power collector was designed and manufactured to satisfy the Korean standardized Specifications of the rubber-tired AGT light rail vehicle. Based on the dynamic behavior, contact force variation and interruption in the worst installation tolerance of the conductor rail, its initial contact force was set up. At the test track for the Korean standardized rubber-tired AGT light rail vehicle, interruptions, stresses, vibrations, and contact force variations were measured. As the results, initial contact force was verified to ensure power collection stability.
Proceedings of the Korean Nuclear Society Conference
/
2004.10a
/
pp.657-658
/
2004
The reactor protection system (RPS) of HANARO is a safety class system. The reactor is tripped by dropping four shut off rods (SOR). The SOR system consists of a SOR, hydraulic pump, hydraulic cylinder, solenoid valves and a power supply unit which has the AC coil contactor as a switching component. The hydraulic pump lifts up the SOR. The SOR drops by loss of the hydraulic pressure in the hydraulic circuit at the occurrence of voltage sags or interruptions. From this experiment, we knew that the magnitude of the voltage sag which impacts on this system is 70V, 500msec. The reactor regulation system (RRS) of HANARO has four CARs which are connected to the driver through a magnetic clutch. The CAR drops by loss of electromagnetic force of the magnetic clutch when the deeper voltage sags to lower than 10V, 500msec.
Proceedings of the Korean Society of Precision Engineering Conference
/
2004.10a
/
pp.556-559
/
2004
This study was aimed to verify the acceptable contact force between power collector and 3rd rail type conductor rail for the Korean standardized rubber-tired AGT light rail vehicle. The power collector was designed and manufactured to satisfy the Korean standardized Specifications of the rubber-tired AGT light rail vehicle. Based on the dynamic behavior, contact force variation and interruption in the worst installation tolerance of the conductor rail, its initial contact force was set up. With rotary disk type equivalent test apparatus with circular conductor rail, the interruptions were measured. As the results, acceptable contact force was proposed to ensure power collection stability.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2014.06a
/
pp.346-348
/
2014
VTS 관제사의 가장 기본적인 업무는 모니터링과 동시다발적으로 발생하는 사건을 처리하는 업무라고 할 수 있다. 이러한 모니터링 업무와 동시발생 업무의 관리의 소홀 또는 실패가 VTS 관련 사고로 이어지는 경우가 많다, 그러함에도 불구하고 지금까지는 이 분야에 대한 연구가 부족하였다. 본고에서는 VTS 모니터링 업무와 동시발생 업무 관리의 특성을 분석하고 특히 방해와 산만을 일으키는 요소들을 집중적으로 검토하고 이것이 관제사의 역량에 미치는 영향을 알아보았다. 또한 이러한 문제의 해결책으로 미래계획기억과 분산 기억 시스템 이론을 적용하여 실질적으로 관제사 업무에 도움을 줄 수 있는 방법을 모색하였다. 또한 e-Navigation 과 관련하여 VTS 장비에 장착하여 관제사의 모니터링 업무와 동시다발 발생 업무 관리를 도울 수 있는 도구 개발에 대한 아이디어를 제안하였다.
With significant development of power electronics technology the proliferation of nonlinear loads such as such as static power converters has deteriorated power quality in power transmission distribution systems. Notably voltage harmonics resulting from current harmonies produced by the nonlinear loads have become a serious problem in many systems Moreover momentary interruptions and voltage sags are responsible for many of the power quality problems found in typical industrial plants. Int his paper proposed 3 phase hybrid series active power filter is not only for harmonic compensation but also for harmonic isolation between supply and load and for voltage regulation and imbalance compensation Through computer simulations we have verified the effectiveness of the proposed system.
Malformations of cortical development are rare congenital anomalies of the cerebral cortex, wherein patients present with intractable epilepsy and various degrees of developmental delay. Cases show a spectrum of anomalous cortical formations with diverse anatomic and morphological abnormalities, a variety of genetic causes, and different clinical presentations. Brain magnetic resonance imaging has been of great help in determining the exact morphologies of cortical malformations. The hypothetical mechanisms of malformation include interruptions during the formation of cerebral cortex in the form of viral infection, genetic causes, and vascular events. Recent remarkable developments in genetic analysis methods have improved our understanding of these pathological mechanisms. The present review will discuss normal cortical development, the current proposed malformation classifications, and the diagnostic approach for malformations of cortical development.
Journal of the Korean Society for Precision Engineering
/
v.18
no.4
/
pp.176-181
/
2001
Due to the increasing complexity to handle conflicts and interruptions caused by resource failures and rush orders, shop control is obliged to redesign its organization according to the changing demands of the manufacturing control. These demands are leading to the development of decentralization and gradually to their permanent optimization. As a result, a powerful modeling method which can be adapted efficiently is required. The use of agent theory enables specific modeling of the relevant shop planning activities. The planning activities are modeled in a so-called activity modeling through the definition of three classes of agents; Plan Agent, Manufacturing System Agent and Control Agent as well as the description of the cooperative relationship among these agents. On the basis of the activity model the agent-based shop control method is developed which emphasizes the distributed problem-solving and the cooperation with relevant agents.
The Transactions of The Korean Institute of Electrical Engineers
/
v.67
no.11
/
pp.1570-1575
/
2018
The increased penetration of PV is impacting on grid operation and in particular the voltage within the local grid can be significantly influenced by the various PV systems. The increased penetration of PV is impacting on grid operation and in particular the voltage within the local grid can be significantly influenced by the various PV systems. This paper describes domestic technical standard of Photovoltaic(PV) PCS(Power Conditioning Systems)- Characteristics of the utility interface. Especially protective function test items of 1) Output overvoltage protection test, 2) Output undervoltage protection test, 3) Frequency rise protection test, 4) Frequency fall protection test, 5) System voltage's momentary interruptions, 6) System voltage distortion capability test. Therefore in this paper protective function test item of facilities evaluation detailed standards for new renewable energy, small, medium and large photovoltaic inverter standard is studied and analyzed and finally full tested by PV inverter performance function.
This paper presents the results of an investigation and assessment of the direct short term impacts of electric service interruption incurred by livestock customers. The study used a direct visit survey to determine the customer assessment of electric service interruption and characteristic. The variation in interruption cost with the characteristics of interruptions such as duration, time of day, frequency, and day of interruption was also investigated.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.