• Title/Summary/Keyword: integrated management tool

Search Result 320, Processing Time 0.025 seconds

Real-time Tool Condition Monitoring for Machining Operations

  • Kim, Yon-Soo
    • IE interfaces
    • /
    • v.7 no.3
    • /
    • pp.155-168
    • /
    • 1994
  • In computer integrated manufacturing environment, tool management plays an important role in controlling tool performance for machining operations. Knowledge of tool behavior during the cutting process and effective tool-behavior prediction contribute to controlling machine costs by avioding production delays and off-target parts due to tool failure. The purpose of this paper is to review and develop the tool condition monitoring scheme for drilling operation to assure a fast corrective response to minimize the damage if tool failures occur. If one desires to maximize system through-put and product quality as well as tooling resources, within an economic environment, real-time tool sensing system and information processing system can be coupled to provide the necessary information for the effective tool management. The example is demonstrated as to drilling operation when the aluminum composites are drilled with carbide-tipped HSS drill bits. The example above is limited to the situation that the tool failure mode of drill bits is wear.

  • PDF

Applications of bridge information modeling in bridges life cycle

  • Marzouk, Mohamed M.;Hisham, Mohamed;Al-Gahtani, Khalid
    • Smart Structures and Systems
    • /
    • v.13 no.3
    • /
    • pp.407-418
    • /
    • 2014
  • The purpose of this paper is to present an Integrated Life Cycle Bridge Information Modeling that can be used throughout different phases of the bridge life cycle including: design, construction, and operation and maintenance phases. Bridge Information Modeling (BrIM) has become an effective tool in bridge engineering and construction. It has been used in obtaining accurate shop drawings, cost estimation, and visualization. In this paper, BrIM is used as an integrated tool for bridges life cycle information modeling. In the design phase, BrIM model can be used in obtaining optimum construction methods and performing structural advanced analysis. During construction phase, the model selects the appropriate locations for mobile cranes, monitors the status of precast components, and controls documents. Whereas, it acts as a tool for bridge management system in operation and maintenance phase. The paper provides a detailed description for each use of BrIM model in design, construction, and operation and maintenance phases of bridges. It is proven that BrIM is an effective tool for bridge management systems throughout their life phases.

Implementation of The Integrated Management System using iA-Canvas (iA-Canvas를 이용한 통합 관리 시스템 구현)

  • Kim, Seog Chan;Kim, Ki Tae;Kim, Je Min;Yoo, Weon Hee
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.1
    • /
    • pp.169-179
    • /
    • 2010
  • iA-Canvas is HMI program which is the industrial automation application developed based on the Java language, and can run on any OS such as Windows, UNIX, Linux. The iA-Canvas is built on object-oriented open structure and consider network functionality and user experience as a system of centralized management and distributed management. iA-Canvas is composed of several components such as Builder, IO Server, Viewer, and Web Service Module and provides a GUI control environment. This paper explains design and implementation of iA-Canvas that is a tool for development of integrated management system, and shows practical examples of integrated management system that use iA-Canvas.

Development of an Integrated Knowledge-base and its Management Tool for Computerized Alarm Processing System

  • Gyunyoung Heo;Park, Seong-Soo;Kim, Han-Gon;Chang, Soon-Heung
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1997.05a
    • /
    • pp.133-138
    • /
    • 1997
  • For a long time, a number of alarm processing techniques have been researched to reduce the number of actuated alarms for operators to deal with effectively during the abnormal as well as the normal conditions. However, the strategy that the only systems with a few clear technologies should be used as a part of an alarm annunciation system has been adopted considering the effectiveness and the reliability in actual alarm processing systems. Therefore, alarm processing systems have difficult knowledge-base maintenance problems and limited expansion or enhancement defects. To solve these shortcomings, the integrated knowledge-base which can express the general information related to all the alarm processing techniques is proposed and its management tool, Knowledge Input Tool for Alarm (KIT-A) which can handle the data of the knowledge-base efficiently is developed. Since the integrated knowledge-base with KIT-A can manipulate all the alarm information without the modification of alarm processing system itself, it is expected to considerably advance the overall capability of maintenance and enhancement of the alarm processing systems.

  • PDF

A Method of Building an Process Model-based CASE Tool to Support Software Development and Management (소프트웨어 개발관리를 지원하기 위한 프로세스 모델 기반 CASE 도구 구축방법의 제시)

  • Jo, Byeong-Ho;Kim, Tae-Dal
    • The Transactions of the Korea Information Processing Society
    • /
    • v.2 no.5
    • /
    • pp.721-732
    • /
    • 1995
  • The IPSE(Integrated Project Support Environment) tool can be seen as a result of an attempt to synthesize the key aspects of language-centered, specific methodology-based and toolkit oriented environments, which are current CASE tools into an organic whole. The IPSE approach based on a process model is regarded as an effective way to implement integrated CASE. The PM-CASE(Process Model based CASE) tool is currently a prototype which draw diagrams describing processes by using a new modeling technique. Attributes related with a task of withen the process model should be defined an saved the database. These attributed are used to retrieve the information of products, and to call the tool related which the task. In this paper, TSEE(Process centered Software Engineering Environment) tools are compared and analyzed. By describing the basic concept, architecture and design of PM-CASE tool, a method of building an process model-based CASE tool is proposed be support an effect software development and management.

  • PDF

GIS-based Ocean Informatics for Integrated Coastal Management (연안역통합관리를 위한 GIS 기반 해양정보학)

  • Kim, Jong-Kyu
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.16 no.2
    • /
    • pp.227-237
    • /
    • 2004
  • Recently development trends in information technology expand the activity boundaries for human living beyond coastal zones. These rapid changes of paradigm are stimulating scientists and strategists to be encouraged in making adequate model for marine geographic information system (MGIS) and their applications. Coastal zones are places which are affected by many factors, such as water quality, tide, wave, atmosphere, population, industry, etc. Therefore information related to the coast has to be integrated and analyzed for managing it efficiently. GIS-based Ocean Informatics is suited for those purposes and used in the study for establishing and managing coastal geographic and environmental information system. This paper reviews the properties of ocean and coastal spaces, then defines some MGIS related terminologies for clarifying the scope of MGIS boundaries. In this study, coastal geographic information is established by digital geographic information and digital terrain information. Digital coast chart having information on digital chart and map can merge and analyze various coastal information and can be a useful tool for the coastal integrated management.

Cluster Tool Module Communication Based on a High-level Fieldbus (고수준 필드버스 기반의 클러스터 툴 모듈 통신)

  • Lee Jin Hwan;Lee Tae Eok;Park Jeong Hyeon
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.285-292
    • /
    • 2002
  • A cluster tool for semiconductor manufacturing is an integrated device that consists of several single wafer processing modules and a wafer transport module based on a robot. The distributed module controllers are integrated by an inter-module communication network and coordinated by a centralized controller, called a cluster tool controller (CTC). Since the CTC monitors and coordinates the distributed complex module controllers for advanced process control, complex commuication messaging and services between the CTC and the module controllers are required. A SEMI standard, CTMC(Cluster Tool Module Communication), specifies application-level communication service requirements for inter-module communication. We propose the use of high-level fieldbuses, for instance. PROFIBUS-FMS, for implementing CTMC since the high-level fieldbuses are well suited for complex real-time distributed manufacturing control applications. We present a way of implementing CTMC using PROFIBUS-FMS as the communication enabler. We first propose improvements of a key object of CTMC for material transfer and the part transfer protocol to meet the functional requirements of modem advanced cluster tools. We also discuss mapping objects and services of CTMC to PROFIBUS-FMS communication objects and services. Finally, we explain how to implement the mappings.

  • PDF

A Study on The Integrated Simulation of The Intelligent Building Control Systems and Network (인텔리전트 빌딩의 제어 시스템 및 네트워크의 통합 시뮬레이션에 관한 연구)

  • Shin, Jin-Sok;Lim, Dong-Jin
    • Proceedings of the KIEE Conference
    • /
    • 1997.11a
    • /
    • pp.106-108
    • /
    • 1997
  • Many new office buildings are being built as intelligent buildings equipped with building automation(HA) systems, office automation(OA) systems, and telecommunication(TC) systems in order to provide pleasant building environment and the ease of maintenance and facility management. Building control systems which are employed in intelligent buildings require varieties of advanced control systems and network systems for efficient integrated management. Design and installation of these types of advanced building control systems take a lot of efforts and also they are costly. In order to design these systems, it is necessary for the designers to have the integrated simulator including proper network system simulation. In this paper, the integrated simulator that consist of HVAC system, lighting system, elevator system, parking system based on the network system is presented. For the development of integrated simulator, AHENA which is the general-purpose software tool for a simulation with reinforced GUI is used.

  • PDF

An Integrated Sewer Management System using Web Based Predictive Spatial Information System (웹 기반의 공간정보예측시스템을 이용한 통합적 하수도 관리 시스템의 개발 및 적용)

  • Kim, Joon-Hyun;Han, Young-Han
    • Journal of Environmental Impact Assessment
    • /
    • v.10 no.1
    • /
    • pp.73-83
    • /
    • 2001
  • Web based integrated sewer management system was developed for the analysis of sewer flow and for the optimal operation of sewer works using ArcView and SWMM. SWMM and ArcView were dynamically linked together using Avenue in order to construct user-friendly information management system. The developed system was applied to the residential area in Choonchun city to verify its utilities. All the relevant field data were analyzed on the basis of the developed system, and the modeling of sewer flow was implemented using RUNOFF, EXTRAN, TRANSPORT in SWMM. This system is now in the process of connection to the management system of stormwater, surface and subsurface environment in order to develop an integrated environmental management system. Futhermore, this system will be a critical part of overall control system of sewer works including sewer network and wastewater treatment plant. As this system can provide comprehensive prediction of flow and pollution profiles, it could serve as a tool not only for the optimal management, but also for the decision support system to examine the efficiency of planning and implementation of sewer projects.

  • PDF