• Title/Summary/Keyword: integrated evaluation system

검색결과 1,019건 처리시간 0.025초

A Study on the Development and Operation of Integrated Assessment System for National Competency Standard Professional Basic

  • Chang, Young-Hyun
    • International journal of advanced smart convergence
    • /
    • 제7권4호
    • /
    • pp.121-127
    • /
    • 2018
  • This paper develops and builds an Integrated Assessment System for National Competency Standard Professional Basic. The integrated evaluation system for basic job competency in the National Competency Standards is developed to conduct examination by means of computers, smartphones and tablet PCs. The system can be used for the basic job competency test, examination for online cyber universities, job competency examination for enterprises, and the listening, reading, and speaking test in the foreign language proficiency examination and is even better in terms of facility investment and saved operating costs as well as efficient use of spaces in comparison with conventional evaluation schemes. Even greater synergy effects can be achieved by providing support for the integrated evaluation system for basic job competency in connection with the NCS qualification system. The evaluation system has been tested and practiced at a specialized high school and can be applied to the NCS education evaluation of the college and four-year college and to the selection examination of new employees of the company.

정보화 수준 제고를 위한 통합평가 시스템 개발 및 적용 (Development and Implementation of an Integrated Evaluation System for Continuous Maturity of IS Performance)

  • 김인주;임춘성
    • 대한산업공학회지
    • /
    • 제29권1호
    • /
    • pp.100-113
    • /
    • 2003
  • In order to improve business competency by the IS(Information Systems), every enterprise needs to evaluate the current level of IS performance and their utilization. The evaluation that measures the performance of enterprise information systems and diagnoses their effectiveness of business goals and efficiency of resources should represent the useful informations based on sustainable goal-oriented viewpoints to managers. This work develops an integrated evaluation system for continuous maturity of information systems performance, enabling enterprises to achieve their goals of information systems and related business strategies. The integrated evaluation system has been applied to performance measurement of information systems with a huge set of real data from domestic industries for three years, and proven reliable and practical.

정보시스템 종합품질평가 모형 연구 (A Study on Integrated Quality Evaluation Model of Information System)

  • 서장훈;이기준;박명규
    • 대한안전경영과학회지
    • /
    • 제8권4호
    • /
    • pp.151-166
    • /
    • 2006
  • One of The standard issue in riding on the wave of the information system(IS) is records of performance, grow unprecedently fast, and has highly uncertain future. Within the framework of IS Evaluation, The main purpose of this study is to suggest performance quality evaluation system as follows, The Integrated Quality Evaluation Model Design(IQEMD) of Information System helps corporations to improve productivity, customer service and corporate competitive power. To respond flexibly this trend, we have to realize that the information system has to keep the most effective optimal information network at the proper time. The existing evaluation method has been concentrated on the evaluation of a degree of the information system maturity focused on static viewpoints. The evaluation of potential factors to affect the future-oriented performance, that can analyze both unit business being able to apply an information system base was used efficiently well and what performance evaluation item was obtained actually, was insufficient relatively. In this paper, An integrated quality evaluation method will analyze a degree of information system maturity in dynamic evaluation viewpoints rather than in static evaluation viewpoints. finally we estimated the relative degree of importance of each determinant using the AHP methodology The validity of the proposed model was also partially proved using two different methods, holistic and historical approach.

농촌마을종합개발사업의 효율적 추진을 위한 중간평가체계 개발 (Development of An Interim Evaluation System for Integrated Rural Village Cluster Development Project)

  • 김경량;최윤상;홍성규
    • 농촌계획
    • /
    • 제12권2호
    • /
    • pp.65-73
    • /
    • 2006
  • This study attempts to develop an interim evaluation system for the Integrated Rural Village Cluster Development Project(IRVCDP) which can secure its identity and sustainability, and induce its early settlement, and to derive plans for its steady progress. The evaluation system consists of three levels. The highest-order level is evaluation purposes, which describe IRVCDP's goals. They are expansion of income bases(EIB), improvement of living environments(ILE), strengthening of regional capabilities(SRC) and constructing effective project operation system(CEPOS). The second level is evaluation items, which each characterize the relevant evaluation purposes. The last level is evaluation indices, which observe achievement f3r evaluation purposes. 22 evaluation indices are selected to satisfy the purposes of this study through a brainstorming process and a survey on opinions of experts for those evaluation purposes and evaluation items which are derived from analyzing the IRVCDP's properties. The relative importance of the evaluation indices selected are determined through the AHP analysis. The most intriguing result from the AHP analysis is that strengthening of regional capabilities is found to be the most important one among evaluation purposes. It can be said that this result is parallel to a ultimate goal of the IRVCDP.

통합환경허가시스템의 활용도 제고 및 개선방향 (Enhancing the Applicability and Improvement Direction of Integrated Environmental Permit System)

  • 박재홍;신수정;이대균
    • 한국물환경학회지
    • /
    • 제34권3호
    • /
    • pp.339-345
    • /
    • 2018
  • The integrated environmental permit system is currently in operation online. It carries out various functions of postmanagement such as the submission of annual reports containing operations management data onto integrated management workplaces, the operation and management of emission facilities and prevention facilities, and the disclosure of information on the integrated permission. On the other hand, the integrated environmental permit system needs to perform various roles in order to stably manage and smoothly perform the permitting work. It is necessary to utilize this system to establish policies by using diverse operations management data onto integrated management workplaces collected in the integrated environmental permit system. This system can also play a role in improving the post-management system and user convenience after the permission review and approval processes. The integrated environmental permit system can be effectively used to set up the BAT-AEL because it collects all of the cross-media data and identifies the overall status of the workplace. In order to establish a post management system after the approval, it is necessary to provide performance management and performance evaluation functions as conditions of the permit after approval. In addition, a variety of support functions should be provided to enable the permission authority and the environmental expert examination agency to facilitate the review of permits. It will be necessary to provide an evaluation system and a proactive diagnostic function to determine whether permission conditions and permit emission standards will change in the future. Also, it is important to adopt an information exchange platform that can be used to collect the status data onto the workplaces; the platform can also be used as an information exchange site for technical working groups (TWG), and for collecting field experts' opinions.

750kW 풍력발전기의 소음실증 (Noise Test and Evaluation of a 750kW Wind Turbine Generator)

  • 김석현;허욱;이현우
    • 산업기술연구
    • /
    • 제27권B호
    • /
    • pp.59-64
    • /
    • 2007
  • This study introduces an environmental noise evaluation procedure and results for a wind turbine (W/T) system. Test and evaluation are required by the international standard IEC 61400-11 in the aspect of environmental effect. Test and evaluation are performed on U-50 WT model which is first developed by the domestic W/T manufacturer. W/T test model is under operation in Daekwanryung wind test site. An integrated monitoring system in the test site is utilized for the evaluation. With the noise signal, meteorological data and W/T operational data are monitored in real time by the integrated monitoring system using LabVIEW. From the measured noise data, acoustic power level are estimated and compared with those of other similar size WT under the wind speeds required by international standard.

  • PDF

LCA를 고려한 우수배제시스템 통합평가지표의 개발과 적용 (Development and Application of Integrated Evaluation Index of Rainwater Drainage System based on the Life Cycle Assessment)

  • 안정규;박성원;김용인
    • 한국산학기술학회논문지
    • /
    • 제20권7호
    • /
    • pp.1-7
    • /
    • 2019
  • 본 논문은 침수피해 방지를 위한 기존의 우수배제시스템의 한계점을 극복하기 위해서 신규 개발된 친환경 수로형 우수배제시스템을 비교 및 분석하고, 기존 시스템 대비 장점을 정량화하기 위한 통합평가지표의 개발 및 적용에 관한 연구이다. 이에 전과정평가(Life Cycle Assessment, LCA)의 개념을 적용하여 각 공정별 필요물량과 비용을 산정하여 비교하였고, 또한 탄소배출량을 각 과정별로 산정하여 고려하는 통합평가지표를 개발하여 각각의 기술에 적용하였다. 그 결과 원형 집수시스템에 비해 전 과정에 걸쳐 비용이 53 %, 측구 집수시스템에 비해 63 %가 절감되는 것으로 분석되었다. 또한 통합평가지표 적용결과, 기존 기술대비 수로형 집수시스템을 평가한 결과 건설공사 분야를 제외한 나머지 4가지 분야(건설자재, 운용 및 유지관리, 해체, 폐기)에 있어서 80 % 이상의 높은 점수로 평가되었다. 본 연구에서 개발된 평가지표를 경기도 안양현장과 인천 청라현장에 적용하여 기존 기술대비 약 35 ~ 100 % 개선된 높은 점수로 향상되어 개선효과를 입증하였고 동시에 적용성을 확보하였다.

계산량과 정확도를 동시에 만족하는 eLoran/GPS 통합 항법 알고리즘 (The Integrated eLoran/GPS Navigation Algorithm for Reduced Calculational Complexity and High Accuracy)

  • 송세필;신미영;손석보;김영백;이상정;박찬식
    • 전기학회논문지
    • /
    • 제60권3호
    • /
    • pp.612-619
    • /
    • 2011
  • Satellite navigation system such as GPS is becoming more important infrastructure for positioning, navigation and timing. But satellite navigation system is vulnerable to interferences because of the low received power, complementary navigation system such as eLoran is needed. In order to develop eLoran/GPS navigation system, integrated eLoran/GPS navigation algorithm is necessary. In this paper, new integrated eLoran/GPS navigation algorithm is proposed. It combines the position domain integration and the range domain integration to get accurate position with less computational burden. Also an eLoran/GPS evaluation platform is designed and performance evaluation of the proposed algorithm using the evaluation platform is given. The proposed algorithm gives an accuracy of the range domain integration with a computational load of the position domain integration.

대구광역시 건축물 적용 태양광발전시스템의 경제성 및 환경성 평가에 관한 연구 (A Study on Economic and Environmental Evaluation of Building Integrated Photovoltaic in Daegu)

  • 소재억;김주영;홍원화
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2006년도 하계학술발표대회 논문집
    • /
    • pp.1232-1237
    • /
    • 2006
  • In Daegu, spread works of photovoltaic have were carrying out from a part of the solar city Daegu but, actual results have were insignificant. According to this study, it analyzed actual conditions of four building integrated photovoltaic system proper to the subject of investigation in Daegu City, in order to investigate the cause of inactive spread of building integrated photovoltaic system. After analyzing of actual state and performance, this study will present not only economic evaluation that Is problem of spread but also, environment evaluation by estimating to have an effect on greenhouse gas reduction.

  • PDF

포괄보조금제도하에서 효율적인 농어촌지역개발을 위한 사업평가지표 연구 (A Study on the Project Evaluation Indicators for the Efficient Integrated Rural Development in Block Grants System)

  • 이주용;김선주
    • 한국농공학회논문집
    • /
    • 제53권1호
    • /
    • pp.57-62
    • /
    • 2011
  • Block Grants System to the agriculture sector has been started from 2010. This paper has been studied for the effective Integrated Rural Development under Block Grants System. For this, project evaluation items and indicators (PEI) were studied by internal and external example and specialist questionnaire on project evaluation. As the result of study, necessity of project, faith of project, efficiency of project, utilization of resources and operating capability were established in planning step, and most important PEI was established the necessity of project. And in enforcement step, performance result, monitering, capability, achievement and maintenance were established, and most important PEI was established performance results. Finally, monitering, capability, achievement and maintenance were established in completion step.