OBSERVATION ERROR OF TIME-LAPSED PHOTOS IN CONSTRUCTION OPERATION MONITORING

  • Jiwon Choi;Julian Kang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1042-1047
    • /
    • 2005
  • A web-based camera (webcam) is expected to enhance construction operation monitoring. However, webcams are often installed outside a building because their mobility is limited by cable wiring, which makes it difficult to monitor construction operations inside the building. If a webcam is integrated with emerging wireless communication technologies, construction professionals may be able to monitor interior construction operations using webcams without getting network cables wired on a congested and dynamic construction job site. However, one may concern that wireless communication may not be fast enough to transport all webcam images seamlessly. This paper presents an investigation as to the observation error of webcam images when a limited amount of images are delivered.

  • PDF

Development of Common Data Standard for Airports Facilities based on Building Information Modeling (BIM) (공항시설물에 대한 BIM 기반의 공통 데이터 표준 구축 방안)

  • Jung, Euisoo;Kim, Kee-Woong;Choi, Youn-Chul
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.29 no.3
    • /
    • pp.100-110
    • /
    • 2021
  • Building Information Modeling(BIM) technology continues to develop and is now being applied to infrastructure facilities. As smart technology based on BIM is applied to the construction industry, the construction of the same data in a common environment is considered to be a very important step in various applications. This study was conducted on methods to establish an open BIM-based airport facility information common data environment. Therefore, this study develops the element technology to establish a common data environment for the integrated management of airport facility information, and aims to standardize data in the common data environment among various technologies and applications. In order to achieve the aim, in this study, the required technologies were derived by examining the common data environment and examining the civil engineering facility field and the case of integrated airport facility management. Through this, standards and development for information standard framework, information requirement level, BIM guidebook, and BIM library were developed in connection with national and higher standards. Through these standards, it is expected that the integrated management of various airport facilities will be efficiently carried out through a standard data platform in the future.

MODEL FOR DESIGN MANAGEMENT IN COLLABORATIVE ENVIRONMENT USING DESIGN STRUCTURE MATRIX AND DESIGN PARAMETERS' INFORMATION

  • Salman Akram;Jeonghwan Kim;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1307-1312
    • /
    • 2009
  • Design is an act based on multidisciplinary information. The involvement of various stakeholders makes it difficult to process, plan, and integrate. Iteration is frequent in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. The simple project management techniques are insufficient to fulfill the requirements of integrated design. This paper entails two things: design structure matrix and design parameters' information based model. The emphasis has been given to optimal sequence and crucial iteration using design structure matrix analysis technique. The design projects have been studied using survey data from industry. The optimal sequence and crucial iterations results have been utilized for proposed model. Model integrates two things: information about produced- required key design parameters and information of design changes during the design process. It will help to get familiar with Design management in order to fulfill contemporary needs.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

A Basis Study on the Integrated System for the Evaluation and Public Announcing System of the Contractor's Construction Capacity (시공능력평가 통합시스템 기반구축에 관한 기초연구)

  • Noh, Jae-Yoon;Jun, Young-Joon;Park, Eun-Soo;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.568-571
    • /
    • 2008
  • To help a owner selecting proper contractors about the specified contract, the Evaluation and Public Announcing System of the Contractor's Construction Capacity has been introduced since 1997. But, the system has been done violence to its original meaning and purpose as time went on. When annually announcing the Contractor's Construction Capacity, especially, there was frequently a large range of opinion on the issues. On that account, MLTM(Ministry of Land, Transport and Maritime Affairs) has had to make a alteration to improve those and is making efforts for a constructive policy now. The purpose of this paper is to conduct a basis study on the Integrated System after reflecting points to be considered about improvements and the current of the times.

  • PDF

An Efficient Operation Scheme for the Material Procurement System in Construction Firms (대형 건설업체 자재수급관리시스템 효율적 운영방안)

  • Kim Tae-Gyum;Park Jong-Hyouk;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.299-302
    • /
    • 2003
  • Recently the timely delivery and the appropriate management for construction materials are of great significance in that the buildings are getting complicated and more various materials need to be handled. However, these systems have some problems, and do not seem to work effectively yet. The reason is that the lack of operation scheme for systematic management in project. In this study the efficient scheme for the .material procurement system in construction firms to manage the construction materials efficiently was discussed.

  • PDF

Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method (FMECA 기법을 적용한 건설현장 거푸집작업의 통합 안전위험성 평가 및 대응방안 마련)

  • An, Sun-Ju;Song, Sang-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.39-48
    • /
    • 2012
  • Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.

BSC Perspective of an Exploratory study of Developing CSF/KPI Pool in Korean Construction Industry (균형성과표(BSC)에 의한 건설산업의 주요성공요인과 성과지표개발에 관한 연구)

  • Oh, Ic-Jin;Lee, Jung-Hoon;Lee, Choong-C.
    • Journal of Information Technology Services
    • /
    • v.5 no.1
    • /
    • pp.35-46
    • /
    • 2006
  • In recent years, academic scholars and practitioners have given increasing attention to the importance of strategic performance measurement systems including both financial and non-financial performance metrics. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps an enterprise to translate strategic objectives into relevant performance within an organization. While the current literatures and management articles offer BSC design and implementation. there are few reports of detailed validation of using the rationalized sets of CSF (Critical Success Factors) and KPI (Key Performance Indicators) for the Korean construction industry. This paper first propose the perceived sets of CSF/KPI using current literatures and validate with a major construction company's executives and senior managers in Korea. The paper then examines whether the perceived sets of CSF/KPI have co-relationships with the firm performances. The results of the research contribute in heightening of competitiveness of the Korean construction companies in strategic and performance management.

OFFICIAL DEVELOPMENT ASSISTANCE 'ODA' AND HUMAN RESOURCE DEVELOPMENT IN THE CONSTRUCTION INDUSTRY OF A DEVELOPING COUNTRY

  • Rajendra Niraula;Yoichi Hirota;Shunji Kusayanagi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.956-961
    • /
    • 2005
  • Delay, cost overrun and inferior quality in public works are common in Nepal and Cambodia. Almost 90 percent of the civil construction engineers working in the industry were one-degree graduates without appropriate training. The civil engineering education had provided elemental engineering knowledge to the graduates however integrated engineering and management knowledge and skill are essential for efficient infrastructure development. ODA in developing countries had been concentrated in hard infrastructure development without improving the quality of higher education. Integrating ODA to engineering education system would help develop qualified technical manpower and appropriate technology domestically, and improve the efficiency in infrastructure development in developing countries.

  • PDF

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF