• Title/Summary/Keyword: installation/management

Search Result 1,166, Processing Time 0.031 seconds

Management of System Requirement for High-speed Electric Multiple Unit - 400 eXperimental (차세대 고속열차 시스템요구사항 관리)

  • Lee, Tae-Hyung;Park, Choon-Soo;Choi, Sung-Hoon;Kim, Sang-Soo;Han, In-Soo;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.395-400
    • /
    • 2009
  • The HEMU-400X project starts at 2007. It is important first of all that describing correctly system requirement during configuration of system, design, manufacturing, installation and test verification so that the complicated high-speed electric multiple unit is to run safety and reliable and to achieve target performance and function properly. The system requirement assist the system designer to understand the performance and function of system in basic design. For this process, system engineer have to manage the system requirement. This paper proposes the management contents of system requirement such as change management, requirement traceability, etc, for HEMU-400X.

  • PDF

The Study on the Application of the Safety Management Utilizing USN Using Smart Safety Equipment to Reduce Falling Accident on Construction Sites (건설현장의 추락재해 감소를 위한 스마트 안전장비를 활용한 USN 활용 안전관리의 적용에 관한 연구)

  • Nam, Wook Jin
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.6
    • /
    • pp.46-53
    • /
    • 2020
  • The domestic construction industry is becoming larger, high-rise and specialized. However, safety consciousness is still staying in low levels and falling accidents are apt to rise compared to other industries. So, the new way of safety management is required for reducing of the construction falling accidents. In this paper, we evaluate appropriateness of safety management on construction sites utilizing USN using smart safery equipment. Thus, we calculate loss costs of falling accidents considering accident rates and costs of the USN using smart safery equipment installation then compare both calculated costs. This research aims to propose the method for reduction of construction accidents in addition to conventional safety control methods by analyzing the propriety of applying USN using smart safery equipment on construction sites.

Method to Manage Building Construction Safety Using Photogrammetry

  • Myunghoun JANG;Dongkyu OH
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.653-657
    • /
    • 2024
  • Various facilities such as safety railings and safety nets are used to prevent safety accidents at construction sites. As construction progresses, additional safety facilities may need to be installed or existing facilities may be damaged, so continuous management is required. To manage safety facilities, it is best for safety managers to check them directly, but there are parts of the site that cannot be checked directly. This study proposes a method to identify the installation status of safety facilities using photogrammetry. A drone is used to take photos and a three-dimensional model is created using these photos. By reviewing the implemented model to determine whether safety facilities are installed, it is possible to secure the safety of construction sites.

Causal Relationship between the Risk-inducing Factors and Safety Inspection and Accident Reduction in Small Construction Sites (소규모 건설현장에서 위험유발요인과 안전점검이 재해 저감 대책에 미치는 인과 관계)

  • Moon, Pil-jae;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.55-70
    • /
    • 2020
  • This study aims to identify the influence of risk-inducing factors and safety inspection on the measures of reducing accidents among workers of building structures in small construction sites. The result can be summarized as follows: First, as for the influence of risk-inducing factors on human factors, preparation for work, disintegrating molds, taking follow-up measures, and keeping records, have statistically significant influences. Therefore, it can be said that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and human factors. Second, as for the influence of risk-inducing factors on facility factors, preparation for work, and taking follow-up measures influenced significantly. This indicates that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and facility factors. Third, as for the influence of risk-inducing factors on management factors, the installation of shores and risk assessment are found to have significant effects. This shows that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and management factors. Fourth, the influence of risk-inducing factors on work factors was significant only in the installation of shores. This indicates that safety inspection has a completely mediating effect in the relationship between risk-inducing factors and work factors. Finally, in the relationship between risk-inducing factors and accident reduction measures, preparation for work, installation of shores, and taking follow-up measures showed significantly positive influences. In contrast, keeping records has a significant negative influence. Thus, safety inspection has a partial mediating effect in the relationship between risk-inducing factors and management factors.

An Environmental Management Protocol for the Mitigation of Contaminants Migration from Military Operational Ranges (오염물질 확산방지를 위한 운영중 군 사격장 환경관리방안에 대한 고찰)

  • Jung, Jae-Woong;Moon, Hee Sun;Nam, Kyoungphile
    • Journal of Soil and Groundwater Environment
    • /
    • v.20 no.6
    • /
    • pp.8-18
    • /
    • 2015
  • Pollutants such as heavy metals and explosives originating from the military operational ranges can be migrated to adjacent surface water body or offsite soil, and can affect to local residents and aquatic ecosystem. Therefore, Korea Ministry of the National Defense has established various guidelines for environmental management including the installation of pollutant migration prevention facilities (PMPFs) and monitoring methodologies for heavy metals in the operational range soil and effluent and sediment of PMPFs. However, current guidelines neither address the explosive compounds such as 2, 4, 6-trinitrotoluene (TNT) and hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX) nor suggest detailed environmental investigation protocol. This paper introduces the new “Environmental Management Manual for Military Firing Ranges”, which includes the environmental criteria for explosives as well as the detailed investigation protocol for the affected environmental media including soil, effluent and sediment of PMPFs.

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

Study on the Status of Fire Safety Management in Elderly Welfare Facilities (노인복지시설의 소방안전관리실태에 관한 연구)

  • Ko, Wang-Youl;Hur, Man-Sung
    • Fire Science and Engineering
    • /
    • v.32 no.3
    • /
    • pp.108-115
    • /
    • 2018
  • Elderly welfare facilities are extremely susceptible to mass casualties in disastrous situations, such as fire, due to the limited physical and mental abilities of their residents. This study examined the status of fire safety management, including the structural problems of elderly welfare facilities, problems of the installation and management of firefighting systems, and problems regarding of fire safety managers. After the Sejong Medical Welfare Facility fire, these problems have been complemented by retrofitting firefighting systems in accordance with the revision of the relevant laws and regulations. On the other hand, the overall status of fire safety management is still insufficient. Therefore, it is important to improve the stability of buildings and firefighting systems as well as fire safety management through additional revision of the relevant laws and regulations.

제조업 유통경로관리 특성과 개선방향

  • 박윤재
    • Journal of Distribution Research
    • /
    • v.1 no.1
    • /
    • pp.65-81
    • /
    • 1996
  • Despite the impressive economic growth over the past several decades, Korea's distribution sector has remained quite underdeveloped. Until recently, management of the marketing channels also has been staying at an unsophisticated level. The Korean marketing channel system is largely characterized by 1) undifferentiated channel types among the competing manufacturers, 2) dominance by the manufacturers over the other channel members, 3) high level of conflicts among the channel members, 4) inefficient marketing information system, and 5) lack of managers properly trained in channel operation and management. Currently, major change factors emerged and has begun to directly affect the Korean marketing channel system. The most salient changes surrounding the Korean marketing channel system are 1) complete opening of the marketing channels for the foreigners, 2) emergence and spread of new types of channels 3) adoption of advanced information technology by the various channel members, 4) increase in flexibility in production and supply systems, 5) shift of power toward the retailers away from the manufacturers, 6) growing trend for cooperation and alliance among the traditional marketing institutions. To these changes the manufacturers have been reacting, rather than proacting, mostly using defensive measures. The proactive measures that are recommended on behalf of the manufacturers include 1) installation of the strategic channel management system, 2) development of the skills for efficient interorganization management, 3) investing in efficient system for marketing information and logistics management, 4) more efficient management of brands, and 5) maintenance of price-competitiveness.

  • PDF

A Study of the Safety Facilities Operation Strategies for Performing Arts Workers Evacuation (공연종사자 피난을 위한 안전시설의 운영전략 연구)

  • Sung-Hak Chung;Yong-Gyu Park
    • Journal of the Korea Safety Management & Science
    • /
    • v.26 no.1
    • /
    • pp.63-74
    • /
    • 2024
  • The objectives of this study is to classify evacuation types, derive the characteristics of 4 types, develop and discover evacuation routes within the performance hall space, and present the statistical classification results of the evacuation classification model by classification type. To achieve this purpose, the characteristics of each evacuation type's four types are applied through a network reliability analysis method and utilized for institutional improvement and policy. This study applies for the building law, evacuation and relief safety standards when establishing a performance hall safety management plan, and reflects it in safety-related laws, safety standards, and policy systems. Statistical data by evacuation type were analyzed, and measurement characteristics were compared and analyzed by evacuation types. Evaluate the morphological similarity and reliability of evacuation types according to door width and passage length and propose the install position of evacuation guidance sign boards. The results of this study are expected to be used as basic data to provide operation strategies for safety facility evacuation information sign boards according to evacuation route classification types when taking a safety management plan. The operation strategy for the evacuation sign boards installation that integrates employee guidance and safety training is applied to the performance hall safety management plan. It will contribute to establishing an operational strategy for performance space safety when constructing performance facilities in the future.

Characteristics of Water Quality Change of Urban River according to Installation of Interceptors and Wastewater Treatment Plant (차집관로와 하수처리시설의 설치에 따른 도시하천의 수질변화 특성)

  • Zhou, Juan Juan;Lim, Bong Su
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.36 no.12
    • /
    • pp.813-820
    • /
    • 2014
  • In this study, the characteristics of water quality change of the three streams in Daejeon were analyzed according to the expanded installation of interceptors and wastewater treatment plant (WTP). Gabcheon 5 (Singu Bridge) location showed the maximum difference of the highest and lowest concentrations in the last decade. However, the recent water quality of this location was worse than other locations, because of the impact of the effluent from the WTP. In the upstream of the WTP, the Daejeon stream was relatively better than the other locations in organic pollution reduction, and this was caused by the investment for the management of the interceptors in three streams of Daejeon. According to the water quality standard of the stream water quality, the recent water quality of the three streams in Daejeon was acceptable within them in the most of the water quality items, but because the total phosphorus concentration of the upstream such as Daejeon stream, Yudeng stream, Gabchen 3 location did not reach the standard values, a better management of the interceptor was required in the upstream of WTP than its downstream. The upstream of WTP also required a better management of the interceptor than the downstream. The operation and management of WTP was required a high efficiency because the water quality of the effluent from the WTP incurred an adverse effect to the target water quality in the location of the total water pollution load management system.