• Title/Summary/Keyword: inspection cycle

Search Result 226, Processing Time 0.023 seconds

Determination of Key Factors and Evaluation of Their Importance in the Elevator Safety Quality Rating System for the Purpose of Adjusting the Elevator Inspection Cycle (승강기 검사주기 조정을 위한 안전품질 등급제 핵심항목 선정 및 중요도 평가)

  • Kyung-Min Roh;Kwan-Hee Han
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.4
    • /
    • pp.70-78
    • /
    • 2022
  • Recently, elevator inspection and self-examination were strengthened through the revision of the Elevator Safety Management Act, but there have been no significant reduction in serious accidents and major failures. Therefore, the government intends to lay the foundation for reflecting the safety quality rating system, which adjusts the elevator inspection cycle, as a policy to induce safety management of preemptive and active management entities. This study systematically reviewed and classified the safety quality rating system for elevator inspection cycle adjustment in previous studies, collected expert opinions, and reconstructed the key items into realistic evaluation items, and evaluated and scored the relative importance of each factor through the AHP technique.

A Study on the Effect of Design Reliability and Periodic Inspection Cycle on Storage Reliability : Focusing on One-shot Logistic Equipment System (설계신뢰도 및 정기검사주기가 저장신뢰도에 미치는 영향에 관한 연구 : 일회성 군수장비 시스템을 대상으로)

  • Chu, Yeon-Won
    • Journal of the Korea Convergence Society
    • /
    • v.9 no.7
    • /
    • pp.223-230
    • /
    • 2018
  • In the case of a one-shot logistic equipment system that has been stored for a long time, reliability changes with the passage of time. Therefore, when the time comes to use, the storage reliability of the product is an important quality characteristic, and the existing studies have focused on the research for calculating the optimal period inspection cycle to improve the storage reliability. In this study, we analyzed the influence of the two factors on the storage reliability at the convergence point by analyzing the design reliability as well as the periodic inspection cycle. To do this, we applied the existing Martinez storage reliability model to the missile, a representative product of a one-shot system, and analyzed the quantitative effects of the design reliability and the periodic inspection cycle. From the results of the analysis, it was confirmed that the maintenance of the periodic inspection cycle is more important for the improvement of the storage reliability than the design reliability in the design reliability category of the current product.

Study on a Optimal Inspection Cycle of Electrical facility of Railroad (철도전기설비의 최적점검주기에 관한 기초연구)

  • Chu, Cheol-Min;Kim, Jae-Chul;Lee, Tae-Hee;An, Jae-Min;Moon, Jong-Fil
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.05a
    • /
    • pp.224-228
    • /
    • 2007
  • It is focused on a methodology to establish a optimal inspection cycle of electrical facility of railroad Decision method of optimal inspection cycle is a process which establishes maintenance plan for facilities' immanent function as using reliability theory in operation term In order to ensure normal operation in a given condition, the decision method is logical for selecting effective maintenance plan to consider characteristic of system In estimation of failure rate, critical facility is selected firstly. After that, proper distribution function on each facility is decided to investigate distribution function for extraction of failure rate. Next, cost produced by the case that facility's failure is occurred is surveyed. Finally, maintenance method developed until now is investigated, before suitable model for the facility applying maintenance method is developed, and that maintenance decision is made. Therefore, this process is the method to find optimal inspection cycle for reasonable cost and effective reliability on facility.

  • PDF

A Study on the Proper Inspection Cycle Plan Through Reliability Analysis of One-Shot System (One-Shot System의 신뢰도 분석을 통한 적정 점검주기 방안 연구)

  • June-Young Lim;Hyeonju Seol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.1
    • /
    • pp.48-54
    • /
    • 2023
  • Guided missiles are a one-shot system that finishes their purpose after being used once, and due to the long-term storage until launch, the storage reliability is calculated during development, and performance is maintained through periodic inspections until the life cycle arrives. However, the reliability standards applied in the development of guided missiles were established by analyzing data accumulated by the United States during long-term operation in the country, and since they are different from our environment, the 00 guided missiles that have been deployed in the armed forces for more than 10 years under the premise that there is a difference from actual reliability. As a result of verifying the appropriateness of the current inspection cycle by analyzing the actual reliability of the missile, the necessity of changing the inspection period was derived because it was higher than the predicted reliability. It is proposed to build and utilize a lifespan management system that can systematically collect all data such as shooting and maintenance results by classification, and to establish a reliable reliability standard based on the accumulated data.

The Development of Visual Inspection System for National Road Facility Maintenance Management (국도 시설물 유지관리를 위한 현장점검시스템 개발)

  • 주기범;김태학;박상근
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.72-77
    • /
    • 2003
  • Visual inspection works are very important part of facility maintenance and management life cycle as a step of creating base data for decision making and maintenance and repair. But currently, visual inspection works have been performed unefficiently and unreliably as works on hand, duplication of works, decisions of defect state, unutilization of inspection history, lack of professional and so on. In this research, we developed visual inspection system that processes inspection work efficiently and provides reliability of inspection output, as a target of bridges, tunnels, underground roadway on national road. We defined problems through visual inspection work analysis, examined the solutions and reflected to functional design of system. We will plan to utilize this system in HMCS(Highway Maintenance and Construction Service).

  • PDF

Storage Reliability Prediction Model for Missile subjected to Non-periodic Test and Periodic Inspection excluding Overlapped Failures (수시점검 및 정기검사 시 고장의 중복을 배제한 유도탄 저장신뢰도 예측 모델)

  • Jo, Boram;Ahn, Jangkeun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.5
    • /
    • pp.599-604
    • /
    • 2018
  • For missile systems, sustaining high reliability and ensuring economical maintenance are very important. In the Republic of Korea, for most missiles, periodic inspection is mandatory for missiles in the field. Every fixed number of years, they are returned to the ordnance depot to be tested and repaired if faults are found. Almost all missiles have a built-in test (BIT) capability. With the BIT, faulty missiles can be isolated anytime during operations or storage in the launchers. So the reliability and the maintenance costs of the missiles greatly depend on the length of the inspection cycle and the BIT/inspection quality. In this paper, we suggest a model for predicting the storage reliability of missiles subjected to non-periodic tests and periodic inspections, excluding overlapping failures. Some numerical examples are given. This model will be useful for determining the length of the periodic inspection cycle.

A study on the electric locomotive maintenance (신형전기기관차 유지보수에 관한 연구)

  • Yu, Yang-Ha
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.765-771
    • /
    • 2008
  • After the KTX operation Korail has been making great effort to reliability settlement through RCM. Also maintenance cycle and method optimization for normal speed rolling stock field are lively same as high-speed rolling stock. In this paper maintenance techniques for new model electric locomotive are introduced. To find the optimal maintenance method, locomotive inspection cycle for advanced country are examined and other electric locomotive inspection cycle are compared. As a result the present time inspection cycle is totally focusing on safety aspect so the economical efficiency is quite low. Through this research optimal maintenance technique will be accomplished in the end of year 2008.

  • PDF

기계고장을 고려한 생산및 품질검증 정책

  • 이창환
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.298-301
    • /
    • 1996
  • This paper addresses the effects of an imperfect production process on the optimal production quantity and quality inspection policies. The system is assumed to deteriorate during the production process. The results are either defective products or machine breakdown whether multiple quality inspection is worth or not. Furthermore, when multiple inspection policy is adopted, the optimal inspection schedule is shown to be equally spaced throughout the production cycle. Exact solution and approximation of the optimal production quantity and approximation of the optimal number of inspection are provided. Finally, to better understand the model of this paper, comparisons between this model and classical EMQ model are provided.

  • PDF

Deep reinforcement learning for optimal life-cycle management of deteriorating regional bridges using double-deep Q-networks

  • Xiaoming, Lei;You, Dong
    • Smart Structures and Systems
    • /
    • v.30 no.6
    • /
    • pp.571-582
    • /
    • 2022
  • Optimal life-cycle management is a challenging issue for deteriorating regional bridges. Due to the complexity of regional bridge structural conditions and a large number of inspection and maintenance actions, decision-makers generally choose traditional passive management strategies. They are less efficiency and cost-effectiveness. This paper suggests a deep reinforcement learning framework employing double-deep Q-networks (DDQNs) to improve the life-cycle management of deteriorating regional bridges to tackle these problems. It could produce optimal maintenance plans considering restrictions to maximize maintenance cost-effectiveness to the greatest extent possible. DDQNs method could handle the problem of the overestimation of Q-values in the Nature DQNs. This study also identifies regional bridge deterioration characteristics and the consequence of scheduled maintenance from years of inspection data. To validate the proposed method, a case study containing hundreds of bridges is used to develop optimal life-cycle management strategies. The optimization solutions recommend fewer replacement actions and prefer preventative repair actions when bridges are damaged or are expected to be damaged. By employing the optimal life-cycle regional maintenance strategies, the conditions of bridges can be controlled to a good level. Compared to the nature DQNs, DDQNs offer an optimized scheme containing fewer low-condition bridges and a more costeffective life-cycle management plan.

A Study on Deduction of Reasonable Inspection Time in Educational Facilities Based on Regression Analysis (회귀분석을 이용한 합리적인 교육시설물 점검시간의 산정 기준 도출에 관한 연구)

  • Seok, Hyun-Su;Cho, Chang-Yeon;Kim, Jae-On;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.4
    • /
    • pp.34-42
    • /
    • 2007
  • The investment of BTL(Build-Transfer-Lease) projects for the educational facilities has been increased since 2005. However, many trial errors and problems have been occurring due to the lack of inspection criteria in maintenance cost for the lift cycle of the facilities. Thus, purpose of this study is to derive regression equation for the daily inspection and the regular inspection through analysis of CAD data in order to set the inspection criteria. It is possible to calculate economical maintenance cost of BTL project in educational facilities using criteria of inspection time through the regression equation developed in this study.