• 제목/요약/키워드: initial investment

검색결과 340건 처리시간 0.027초

우간다 양계부문 ODA 사업의 농가단위 경제성 평가 (Economic Evaluation of ODA Project - A Case of Poultry Farm in Uganda -)

  • 양헌용;서일환
    • 농촌계획
    • /
    • 제26권4호
    • /
    • pp.67-79
    • /
    • 2020
  • As globalization, international cooperation has grown in importance. In accordance with this trend, Korea has been receiving high demands from international organizations about expanding the scale of Official Development Assistance(ODA) in line with its improved national status. In addition, in the economic aspect of Korea, the ODA project is expected to provide new growth opportunities in the mid- to long-term by promoting cooperation with developing countries. Uganda is an area with high strategic value due to good agricultural conditions and favorable geographical conditions. The poultry industry is a business that is generally carried out to the Ugandan, but due to economic problems such as initial investment cost, most of them have raised poultry on a small scale which is not enough for main income. This paper proposes the construction and operation plan of adapting to small poultry farms in the village-intensive type to sustainable income for residents in Uganda through ODA project in Korea's agricultural technology. The economic feasibility was analyzed from the long-term perspective when the initial construction cost was supported or not and the poultry species ratio was adjusted in terms of initial and operating costs. Economic analysis was performed using Net Present Value(NPV) method. As of after 10 years, when operating in the form of shifting kuroiler to layers, it was estimated to earn about 700,000 ugx more than when only kuroiler is raised, and it is able to reduce about 14 million ugx from the initial cost than when only raising layers. As of 20 years, the most profitables scenario was the breeding of 100 kuroilers and 400 layers methods. however, this case was anlayzed to be unsuitable for Uganda farmers, with initial costs more than three times higher than the shifting method of the kuroiler to layers. If the initial construction cost is supported by ODA project, the initial investment cost can be recovered in the first year with the shifting method, whereas raising only layers take two years to recoup the cost. In the meantime, when studying livestock industry in Uganda, it was examined by relying on statistical data, but this paper is meaningful in that it predicted how much it is economically effective based on field experience.

Axial behavior of RC column strengthened with SM-CFST

  • Jiang, Haibo;Li, Jiahang;Cheng, Quan;Xiao, Jie;Chen, Zhenkan
    • Steel and Composite Structures
    • /
    • 제43권6호
    • /
    • pp.773-784
    • /
    • 2022
  • This paper aims to investigate the axial compressive behavior of reinforced concrete (RC) columns strengthened with self-compacting and micro-expanding (SM) concrete-filled steel tubes (SM-CFSTs). Nine specimens were tested in total under the local axial compression. The test parameters included steel tube thickness, filling concrete strength, filling concrete type and initial axial preloading. The test results demonstrated that the initial stiffness, ultimate bearing capacity and ductility of original RC columns were improved after being strengthened by SM-CFSTs. The ultimate bearing capacity of the SM-CFST strengthened RC columns was significantly enhanced with the increase of steel tube thickness. The initial stiffness and ultimate bearing capacity of the SM-CFST strengthened RC columns were slightly enhanced with the increase of filling concrete strength. However, the effect of filling concrete type and initial axial preloading of the SM-CFST strengthened RC columns were negligible. Three equations for predicting the ultimate bearing capacity of the SM-CFST strengthened RC columns were compared, and the modified equation based on Chinese code (GB 50936-2014) was more precise.

DEVELOPMENT OF LIFE CYCLE COST ANALYSIS SYSTEM FOR THE BUILD-TRANSFER-LEASE PROJECTS

  • Chun-kyong Lee;Bong-ho Cho;Tae-keun Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.119-129
    • /
    • 2007
  • In January 2005, the BTL private investment project was introduced in the Korean construction market as part of the plan to provide high-quality public service and expand the required facilities in a timely manner. Nonetheless, problems such as the low earning rate at the beginning of the business, burden of service compared to the cost of the proposed business, and limitations of the local small and medium-sized companies in relation to their participation in the project arose. The LCC analysis system for the BTL projects was developed as part of efforts toward efficiently investigating the investment eligibility. Specifically, methods for LCC analysis were selected for each stage of the BTL project in relation to the requests of experts for military residential facilities and public educational facilities. Variables were then extracted to derive an accurate analysis value, LCC for the 5 cost items (initial investment cost, operating expenses, maintenance expenses, energy cost, and disposal cost), analyzed, and system enabling comparative analysis for single and multiple initiatives by year and item, developed. Thus, we have to clearly require the accumulation of data to examine the appropriateness of the results of LCC analysis based on data and results.

  • PDF

고속철도차량 시스템의 비용구조 분석에 대한 사례 연구 (Case study on the costs structure analysis for the High Speed Rolling Stock system)

  • 최석중;김문홍
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1623-1629
    • /
    • 2010
  • The high speed rolling stock system considerably belongs to a special industry which requires large-scale investment cost but the recovery term is long. Therefore, to guarantee risk and possibility of technological success in initial investment, tools concerned with various expecting methods like life cycle costs analysis and credibility management are used. In view of this characteristics, the cases on cost structure for HSR RS previously invested should be studied and the method to appropriately allocate the life cycle of each sub-system like arrangement unit, electric device, braking device, door and car body should be realized. Moreover, the environmental aspects of main manufacturer and parts supplier can be checked. This study, through the case study for HSR cost structure in introduction and operational stage of KTX, aims to seek for the method to adapt to environmental changes like EU railway industry of which object is to acquire global market competitiveness by integrating manufacturing and operation of RS and the regulation and operation of IRIS which is performed in Europe.

  • PDF

대형 융합 연구사업의 최선단 연구기획 관리전략 (Fuzzy-Front-End Management Strategies under High Risk and Fast-Changing Environment)

  • 송용일;이대희;박성배;정윤철
    • 기술혁신연구
    • /
    • 제12권3호
    • /
    • pp.135-157
    • /
    • 2004
  • As the speed of technological changes increase with the investment requirements steadily expanding, private firms and government-funded research institutes experience similar pressures with respect to the necessity of risk reduction and technological alliances in R&D activities. This paper first attempts to review previous research in managing R&D projects with large, risky, and long-term investment requirements. Our primary focus is placed on the "fuzzy front-end" (FFE) projects with uncertainties at the investigation and planning stages. We analyze various elements that create FFE conditions, classify them into basic constructs, and suggest tools and methods to deal with FFE conditions. The findings suggest that both initial FFE conditions and the effectiveness of FFE management affect the performance of the project later on, and thus, especially for large projects, we must deal with FFE seriously in a comprehensive manner. We utilize in-depth panel interviews and case studies to approach the research questions.

  • PDF

임팩트 투자자의 투자 우선순위와 비중 차이에 관한 연구 (Investment Priorities and Weight Differences of Impact Investors)

  • 유성호;황보윤
    • 벤처창업연구
    • /
    • 제18권3호
    • /
    • pp.17-32
    • /
    • 2023
  • 최근 정부와 공공의 역할만으로 사회문제를 모두 해결하기에는 한계가 있어서, 시장에서 영리 조직의 효율성이나 효과성을 통해 사회문제를 해결하면서 성장하는 것을 목표로 하는 소셜벤처의 필요성이 증대되었다. 이러한 배경하에 국내 스타트업 생태계에서도 소셜벤처 창업이 증가하면서 소셜벤처 투자자인 임팩트 투자자에 대한 관심도 증가하고 있다. 따라서, 본 연구는 임팩트 투자자의 투자 결정에 있어서 인지과정과 의사결정 환경에 따른 판단 정보의 타당도와 가중치를 객관적으로 분석하고자 판단분석기법을 활용하였다. 연구 진행을 위한 세 가지 분류로 첫째, 투자자로서 재무적 이익과 회수 가능성 판단을 위한 초기투자단계에서의 투자 우선 순위, 둘째, 사회에 미치는 영향과 파급력, 그리고 소셜벤처의 상생과 연대를 위한 창업가(팀)의 정치적 기술, 셋째, 임팩트투자펀드 조성 목적에 부합하는 소셜벤처기업의 소셜미션으로 구성하였다. 연구 결과 첫째, 임팩트투자자의 투자결정의 우선 순위는 창업가(팀)의 전문성, 창업가(팀)의 성공시의 잠재적 수익률, 창업가(팀)의 소셜미션인 것으로 나타났다. 둘째, 임팩트투자자가 투자결정요인에 대하여 판단하는 인식이 획일적이기보다는 투자 결정 요소가 제각각 다르며, 비중을 두는 정도에 있어서도 생각의 차이가 있다는 것이다. 셋째, 임팩트투자의 다양한 투자결정 요인에서 '창업자(팀)의 네트워킹 능력', '창업자(팀)의 사회적 통찰력', '창업자(팀)의 대인관계 영향력은 다른 4개의 요인보다 상대적으로 낮게 나타났다. 본 연구를 통해 실무적 기여점은 소셜벤처기업들이 투자 유치과정에서 임팩트투자자의 투자결정요인이 무엇인지 이해를 돕고, 소셜벤처 투자자에게는 임팩트투자자의 판단사례와 분석을 참고하여 투자결정의 질적 제고를 기대할 수 있다. 학술적 기여점은 임팩트 투자자의 투자 우선 순위와 비중 차이를 실증적으로 규명하였다는 것이다.

  • PDF

선박용 LED 등기구의 적용에 따른 경제성 분석 (Economic analysis on the applications of shipboard LED luminaires)

  • 박서준;변성환;김선재;박경수;길경석
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제40권4호
    • /
    • pp.342-347
    • /
    • 2016
  • 본 논문에서는 실습선과 함정의 광원으로 80 % 이상을 차지하는 백열등 및 형광등기구를 대체하기 위한 선박용 LED 등기구의 경제성 분석에 관하여 기술하였다. 소비전력, 초기투자비용, 유지비용 및 유류비에 대한 절감률을 분석하였고, 탄소배출량과 손익분기점을 산출하였다. 실습선의 초기투자비용은 3.8배 상승하였지만, 5년간 유지비용은 51 % 절감되었다. 40 %, 50 % 및 60 %의 점등률에 따른 손익분기점은 각각 11개월, 9개월 및 7개월로 산출하였다. 함정의 초기 투자비용은 3.5배 상승하였지만, 5년간 유지비용은 55 % 절감되었다. 40 %, 50 % 및 60 %의 점등률에 따른 손익분기점은 각각 15개월, 12개월 및 10개월로 산출하였다. 또한 실습선과 함정의 탄소배출량은 각각 69 % 및 65 % 절감되었다. 이러한 결과를 통하여 실습선과 함정에 LED 등기구를 적용한다면, 50 % 이상의 유지비용 절약과 60 % 이상의 소비전력, 유류비 절감 및 탄소배출량이 감소될 것으로 판단된다.

화력발전소 온배수열 활용 시설하우스 열공급 모형 경제성분석 연구 (An Economic Analysis of the Effluent Heat Supply from Thermal Power Plant to the Farm Facility House)

  • 엄병환;안차수
    • Korean Chemical Engineering Research
    • /
    • 제56권1호
    • /
    • pp.6-13
    • /
    • 2018
  • 석탄화력발전소 온배수열 활용하여 발전소 인근지역 시설농업에 난방열을 공급하는 사업의 배관투자비는 설치거리에 비례하여 증가하고 발전소와 떨어진 거리는 경제성 확보에 문제를 낳는다. 또한, 설치거리가 짧은 경우는 난방열 수요 확보가 어려워 경제성 확보의 문제가 있을 수 있다. 본 연구에서는 기준 열배관로 신설길이 1 km에 대한 경제성 평가와 열배관로 신설길이 변동에 따른 민감도를 정부지원금 수준, 난방열 수요량 수준과 정부지원금 증가에 따른 경제성 확보가능 열배관로 신설거리 수준에서 분석하였다. 분석결과 기준 열배관로 신설길이에서는 NPV 131백만원, IRR 15.73%로 경제성을 확보 가능한 것으로 평가되었다. 다만, 민감도 분석결과 열배관로 신설길이가 2.6 km를 초과하는 경우 NPV가 음수로 나타나 경제성을 확보하지 못하는 것으로 분석되었다. 결과적으로 초기투자비의 50%를 정부가 지원하는 경우 5.3 km, 80%를 지원하는 경우 11.4 km 이내에서 경제성을 확보하는 것으로 분석되었다. 기준 열배관로 신설길이에서는 난방열 수요가 기준 열수요 대비 62% 수준 이하로 감소하는 경우 경제성이 없으며, 열배관로 신설길이가 2 km에서는 기준 열수요 대비 14%만 감소하여도 경제성을 확보하지 못하는 것으로 분석되었다. 초기투자비대비 정부지원금 비율이 증가하는 경우 열배관로 신설거리의 탄력성이 증가하여, 열수요 1단위에서 부담하는 시설투자비인 고정비가 감소한다. 이는 단위당 생산원가가 감소하는 효과로 나타나고 시설농업에 더 저렴한 수준으로 열을 공급할 수 있음을 의미한다. 정부지원금은 열배관로 신설거리가 증가하는 효과로 경제성이 확보될 수 있고, 열수요 개발가능 범위 증가에 따라 추가적인 경제성을 확보할 수 있다. 초기투자비 대비 정부지원금 비율이 증가할수록 생산단가 감소로 인한 시설농가의 에너지비용 또한 감소할 것으로 예측된다. 본 연구결과는 발전소 온배수열 활용사업에 대한 정부지원금의 효과성을 경제적 평가측면에서 분석한 점에서 의의를 가지며, 향후 시범적용 또는 Pilot 단계의 실제 적용사례를 기반으로 한 경제성 평가결과에 대한 필요성을 제기할 수 있는 근거가 된다.

신주(新株)의 저가상장현상(低價上場現象)과 투자(投資)의 효율성(效率成)에 대한 연구(硏究) (Underpricing of Initial Offerings and the Efficiency of Investments)

  • 남일총
    • KDI Journal of Economic Policy
    • /
    • 제12권2호
    • /
    • pp.95-120
    • /
    • 1990
  • 비상장기업(非上場企業)이 최초로 주식시장(株式市場)에 발행하는 신주(新株)가 실제가치에 비해 낮은 가격(價格)에 상장(上場)되는 신주(新株)의 저평가현상(低評價現象)이 번번히 일어나고 있으나 아직 그 원인(原因)이 명확히 밝혀지고 있지 않다. 또한 신주발행(新株發行)을 통한 자본조달(資本調達)의 효율성(效率性)에 관한 기존(旣存)의 연구도 전무(前無)하다. 본고(本稿)에서는 기업(企業)의 수익성(收益性)에 관하여 기업주(企業主)의 우월(優越)한 정보(情報)를 가정한 신호경기적(信號競技的) 모델의 분석(分析)을 통하여 신주(新株)의 저가상장(低價上場) 원인(原因)을 밝혀내고 아울러 신주발행(新株發行)을 통한 자본조달(資本調達)의 효율성(效率性)을 검토해 보았다. 모델의 분리균형(分離均衡)의 분석(分析)을 통해 밝혀진 주요 결과는 다음과 같다. 고수익성(高收益性)프로젝트를 가진 기업주(企業主)는 프로젝트가 저수익성(低收益性)인 경우에는 선택할 유인(誘因)이 없는 발행조건 중 자신에게 가장 유리한 조건을 선택함으로써 투자자들에게 기업이 고수익성(高收益性)임을 입증(立證)하고자 하며 이 과정에서 선택된 고수익성기업(高收益性企業)의 발행조건의 성격은 다음과 같다. 첫째, 넓은 범위와 모수(母數)값에 대해 신주가격(新株價格)은 판매대금(販賣代金)이 기업(企業)에 유입(流入)된 이후 1주(株)에 해당하는 기업(企業)의 가치에 미달한다. 둘째, 기업(企業)에 유입(流入)되는 자본(資本)은 프로젝트로부터의 잠재적(潛在的) 이윤(利潤)을 극대화(極大化)하는 액수에 미달한다. 따라서 신주(新株)의 저가상장(低價上場)은 고수익성기업주(高收益性企業主)의 신호행위(信號行爲)의 결과이며 또한 신주(新株)의 저가상장(低價上場)은 저투자(低投資)를 의미한다.

  • PDF

스타트업의 초기 투자유치 프로세스: (주)레티널 사례를 바탕으로 (Investment Process of Start-up: A Case Study of LetinAR)

  • 김하영;배태준;원치운
    • 벤처창업연구
    • /
    • 제14권6호
    • /
    • pp.119-130
    • /
    • 2019
  • 타트업의 투자 의사결정에 대한 연구들은 활발하게 이루어져 왔다. 하지만, 주로 투자자의 관점에서 연구가 되었기 때문에 피투자 기업의 전략적인 활동은 간과되어왔다. 특히, 스타트업 투자는 일시적으로 한 순간의 결정으로 이루어지는 것이 아닌, 투자 유치 진행과정을 통해 결정된다. 뿐만 아니라, 단계별로 의사결정의 핵심 요소가 달라질 수 있으므로, 스타트업의 초기 투자 유치를 이해하기 위해서는 투자자 만남에서 투자 유치 성공에 이르기까지 전 과정에 걸쳐, 스타트업 기업의 전략적 행동을 분석할 필요가 있다. 이를 위해 핀미러 기술을 활용한 증강현실 (Augumented Reality, AR) 스타트업인 (주)레티널의 사례를 통해 "어떻게" 초기 스타트업이 투자 유치에 성공할 수 있었는지, 피투자자인 스타트업 관점에서 연구하였다. 구체적으로, 본 연구에서는 스타트업이 투자를 받기 전 존재 자체를 알리기 위한 정당성 확보하는 단계를 추가시켜 기존 투자 프로세스 모델을 확장하였다. 이를 바탕으로 1) 정당성 확보, 2) 친화, 3) 검토, 4) 협상 단계 등 4단계로 투자 진행 프로세스를 나누었고, 각 단계별 주요 요인을 분석하고, 스타트업의 전략적 활동을 파악했다. 본 연구는 스타트업의 투자 유치와 관련된 복잡한 과정과 피투자자인 스타트업 기업의 성공적인 전략적 행동들을 이해하는데 많은 도움이 될 수 있을 것으로 판단된다.