• Title/Summary/Keyword: inflow time

Search Result 612, Processing Time 0.032 seconds

Estimation of Maintenance Flow for Suitable Utilization of Fishway (어도의 적절한 이용을 위한 유지유량 평가)

  • Kim, Seok-gyu;Kim, Chul;Kim, Seonghwan;Ko, Kwangyong
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.2
    • /
    • pp.281-287
    • /
    • 2009
  • Achieved monitoring regularly about fishway that is a intake dam belongings to Kyeongchon for 5 years. Result that achieve monitoring, discovered pressing issue of opening and closing degree of discharge control part in fishway. In this research, analyze discharge relation with fishway and intake sluice and presented operation plan of opening and closing of discharge control part. Investigated necessity intake discharge and benefited area to analyze relation of discharge that is flowed in fishway and discharge escaping by intake sluice. When opened discharge control part step by step gradually, analyzed discharge. Compared with survey discharge making ration curve of fishway and intake sluice using orifice and submerged weir formula. Because operation of intake dam is necessary intake discharge and upriver inflow discharge by time, operation uses by survey discharge and calculated opening discharge of fishway by opening discharge of intake sluice via monthly inflow discharge. To sum up, calculated floodgate opening height of fishway by water level to present maintenance standard of intake dam.

A Study on Process Improvement for Reduction of Pollution Loading Rate in Small Individual Sewage Plant (소규모 개인하수처리시설의 MBR공정 적용에 관한 연구)

  • Eom, Han Ki;Choi, Yoo Hyun;Joo, Hyun Jong
    • Journal of Environmental Science International
    • /
    • v.25 no.2
    • /
    • pp.323-329
    • /
    • 2016
  • In this study, the applicability of MBR process was evaluated to improve processing of personal sewage treatment facilities of $50m^3/day$ or less. As result of the research, stable discharge water quality could be secured as result of the MBR effector operation according to rate of inflow and inflow load and treatment efficiency of 98% or higher was shown by the membrane filtering method operation for SS, $BOD_5$. it was found that high treatment efficiency of 99% or higher. It is judged that detention time can be designed until 6.9 hr when applying MBR process on personal sewage treatment facilities with high pollution load and that cutback of pollution load can be possible through this study. It was shown that MBR process application reduces an annual cost of 4,829,600 won based on the basic unit calculation results and solves burden of amount of borne by causers according to excess of discharge water quality standards.

The Study of De-orbit Time Prediction Using Temperature Change of Geostationary Satellite Propellant System (정지궤도위성 추진시스템의 온도변화를 이용한 위성폐기시점 추정연구)

  • Park Eung Sik;Park Bong Kyu;Han Cho Young;Kim Yong Min
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • v.y2005m4
    • /
    • pp.5-10
    • /
    • 2005
  • The geostationary satellite propulsion system has thermistors which can measure liquid propellant temperature at tanks, pipes and etc. In the satellite propulsion system with several tanks, the propellant in the tanks is moved by temperature change and this temperature pattern is constant. In this paper, the temperature change pattern of KOREASAT 1 propulsion system is compared and the prediction study of pressurant inflow using temperature change of geostationary satellite propulsion system is described.

  • PDF

Nitrogen Removal Rate of Free-Water-Surface Treatment Wetland System Constructed on Floodplain During Its Initial Operating Stage (고수부지에 조성한 수질정화 자유수면습지의 초기운영단계 질소제거)

  • Yang, Hongmo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.6 no.6
    • /
    • pp.41-48
    • /
    • 2003
  • Nitrogen removal rate and emergent plant growth were investigated of a free-water-surface constructed treatment wetland system, whose dimensions were 31m in length and 12m in width. The system was constructed on floodplain in the Kwangju Stream from May to June 2001. Cattails(Typha angustifolia) were transplanted from natural wetlands and their stems were cut at about 40cm height from their bottom ends. Water of the Kwangju Stream were funneled into the system by gravity flow and its treated effluent was discharged back into the stream. The average height of the cattail stems was 45.2cm in July 2001 and 186cm in October 2001. The number of stems averaged 22 stems/$m^2$ in July 2001 and 52 stems/$m^2$ in September 2001. Volume and water quality of inflow and outflow were analyzed from July 2001 through December 2001. Inflow and outflow averaged 40.01 and 39.55 $m^3$/day, respectively. Hydraulic detention time was about 1.5 days. Average nitrogen uptake by cattails was 69.31 $N\;mg\;m^{-2}\;day^{-1}$. Removal rate of $NO_3-N$, $NH_3-N$ and T-N averaged 195.58, 53.65 and 628.44 $mg\;m^{-2}\;day^{-1}$, respectively. The average removal rate of T-N was about 39%.

A Study on the Development of the Operation Models for Storm Water Pumps in Detention Pond (유수지 배수펌프 운영조작 모형의 개발)

  • 윤세의;이종태
    • Water for future
    • /
    • v.28 no.6
    • /
    • pp.203-215
    • /
    • 1995
  • Operation models for storm water pumps in detention pond were developed in order to reduce the damage by inundation in urbanized area. The return periods (10, 20, 30 years) of rainfall were selected to estimate inflow discharge to detention ponds. Inflow hydrographs of detention ponds were derived by using the SWMM, and Petri net diagrams were selected to analyze the pump actions. Safety and efficiency of pumps and detention ponds were estimated by penalty index. In order to verify the models, the models were applied to three selected detention ponds in Seoul area. In numerical experimental results, the developed model 3 is more effective in inland flooding prevention than the existing one, and may be used to design and evaluate detention ponds with real time data of rainfall.

  • PDF

A Numerical Study on Characteristics of Flood Wave Passing through Urban Areas (2) : Application and Analysis (도시지역을 관통하는 홍수파의 특성에 관한 수치적 연구 (2) : 적용 및 분석)

  • Jeong, Woo-Chang;Cho, Yong-Sik;Lee, Jin-Woo
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.1
    • /
    • pp.65-72
    • /
    • 2010
  • In this study, the effects of urban areas against flood waves due to a dam failure were numerically investigated based on the two laboratory experiments and the predicted water surface elevations at specific points showed good agreement with available measurements. In the first experiment, a relatively high water depth and the delay effect of flow at the front of urban areas are observed. The urban areas may become a large obstacle against smooth propagation of flood wave. In the second one, as the inflow increases, moreover, the water surface elevations can be classified into abruptly decreasing portion and slowly decreasing portion, and the first arrival time to the front of urban area is decreasing with the increasing inflow.

Design of Automotive Engine Cooling Fan and Study on Noise Reduction through Modification of System (자동차용 냉각홴의 설계와 시스템 개선을 통한 저소음화 연구)

  • 김병주;강상규;김규영;이재영;이덕호;신동수
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.14 no.11
    • /
    • pp.1107-1114
    • /
    • 2004
  • Axial fans are widely used for automotive engine cooling device due to their ability to produce high flow rate to keep engine cool. At the same time, the noise generated by these fans causes one of the most serious problems. Especially, engine cooling fan noise in idle condition of a car is noticeable. Therefore. the high efficient and low-noise fan is seriously needed. When a new fan system is designed, system resistance and non-uniform inflow are the key factors to get the high performance and low noise fan system. In this study, aerodynamic and acoustic calculations are carried out on the automotive cooling fan and system. Effects of various design parameters are studied through the free wake analysis and experiments. Better performance and noise characteristic are obtained for the new design fan using the methodology. Furthermore through the modification of the fan system geometry parameters, the fan system produce more flow rate and become less noisy.

Numerical Analysis of Freezing Phenomena of Water in a U-Type Tube (U자형 배관 내 결빙에 대한 해석적 연구)

  • Park, Yong-Seok;Suh, Jeong-Se
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.18 no.12
    • /
    • pp.52-58
    • /
    • 2019
  • This study numerically analyzed the icing process in a U-shaped pipe exposed to the outside by considering the mushy zone of freezing water. Numerical results showed that the flow was pulled outward due to the U-shaped bend in the freezing section exposed to the outside, which resulted in the ice wave formation on the wall of the bended pipe behind. At the same time, the formation of a corrugated ice layer became apparent due to the venturi effect caused by the ice. The factors affecting the freezing were investigated, including the change of the pipe wall temperature, the water inflow velocity, and the pipe bend spacing. It was found that, as a whole, the thickness of the freezing layer increased as the pipe wall temperature decreased. It was also found that the freezing layer became relatively thin when the inflow rate of water was increased, and that the spacing of the pipe bends did not significantly impact the change in the freezing layer.

A New Control Technique of Drainage Pump Based on Fuzzy Control (퍼지제어기법을 사용한 우수배제 펌프의 조작기법 개발)

  • Lee, Won Hwan;Cho, Won Cheol;Shim, Jae Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.3
    • /
    • pp.107-114
    • /
    • 1992
  • With the increasing of impervious area and shortening of travel time, the risk of flooding in urban area becomes a serious problem in Seoul metropolitan area, and its alternatives are needed. In this study, one of urban flood alternatives, a fuzzy control technique is applied in pumping station to test its drainage capacity of inland inflow, and compared with existing pumping criteria (controled by water level). Three design rainfalls(10, 30, and 50 year) are applied to ILLUDAS model to calculate inflow in detention reservoir. To check the efficiency of fuzzy control, two fuzzy rules are used in the operation of pumping station. In these results, fuzzy control rules, based on the experiences of experts, show applicability in practice and effectiveness in inland flooding prevention.

  • PDF

Pollutant Removal Efficiency of Sedimentation Basin at Inlet of an Irrigation Reservoir (저수지 내 유입부 침강지의 수질정화 효율)

  • Jang, Jeong-Ryeol;Choi, Sun-Hwa;Kwun, Soon-Kuk
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.5
    • /
    • pp.473-479
    • /
    • 2004
  • A sedimentation basin (SB) at the inlet of an irrigation reservoir which was constructed using an auxiliary dam was monitored to evaluate its pollutant removal efficiency. Water sampling at three points, i.e., inflow stream, upstream and downstream of the reservoir, were taken 5 times before and after the construction of the SB in 1999 and 2003, respectively. No significant water quality variations in inflow stream were observed during these periods. The COD, T-N, T-P and SS removal efficiencies were 38, 24, 35 and 49%, respectively. The results indicated that those removal efficiencies significantly increased during the rainy season and COD removal efficiency, especially, was higher than others studies. The scale of SB in this study was rational as aspects of pollutant removal efficiency and hydraulic detention time. And it is recommended that SB, at inlet of an reservoir, should be constructed as completely separated structure from reservoir water body and having SAR Index from 0.7% to 1.0%.