• Title/Summary/Keyword: industrialized construction

Search Result 50, Processing Time 0.026 seconds

Industrialized Building Systems for the Kingdom of Saudi Arabia

  • Santoso, Try P.;Trigunarsyah, Bambang;Hassanain, Mohammad A.;Tuffaha, Firas
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.73-79
    • /
    • 2017
  • Rapidly expanding population in the Kingdom of Saudi Arabia has a massive impact to put pressure on the shortage of housing and existing infrastructure. With average population growth rate of 1,9% yearly, the population in Saudi Arabia is projected to increase from 31 million in 2015 to 37 million in 2025. According to the housing ministry, Saudi Arabia needs to provide 3.3 million units to meet the demand in 2025, which is about 300,000 unit a year. In the past 40 years, using the conventional construction method, the Saudi construction industry was only able to build about 150,000 units per year. To meet the demand gap for the housing shortage, a new approach and innovation in construction methods are needed. Industrialized construction as an approach in construction methods has been studied and implemented in some countries that experienced similar corncerns. Industrialized construction can be defined as the implementation of manufacturing methods to construction-related activities to improve quality, reduce cost and project duration. Compared to the conventional construction method, prefabrication as industrialized construction methods has reduced construction labor on-site by 9.5%, construction project duration by 20%, and construction waste by 56%. It improves the quality, durability and cost saving not only for construction project owners, but also construction contractors. This paper discusses the possibility of 'industrialization' of building system in the Kingdom of Saudi Arabia as a solution for the housing shortage. It is an initial part of a study aims to develop a framework to develop industrialized building system in the Kingdom of Saudi Arabia. The is paper based on extensive literature review and case studies.

  • PDF

A Study on the Improvement Directions for the Industrial Housing Accreditation System in Korea (공업화주택 인정제도 개선 방향 설정에 관한 연구)

  • Hwang, Eun-Kyoung;Lee, Jong-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.171-177
    • /
    • 2021
  • The demand for promoting industrialization construction methods is increasing in Korea to cope with various construction environments, such as the lack of construction engineers, aging construction workers, and the government's 52-hour workweek policy. The industrial housing accreditation system was introduced in 1992 to recognize and improve the quality of industrial housing, but only six companies are currently certified, and there are no records of constructing industrial houses. Currently, the industrialized housing accreditation system in Korea comprises standards for the recognition, revocation of recognition, and promoting the construction of industrial houses. Therefore, this study analyzed the regulations of the industrialized housing accreditation system, derived the problems of each regulation, and derived improvement directions to promote the industrialized housing accreditation system in Korea. Specific measures include expanding the current industrial housing accreditation scope to quasi (semi)-housing, revising the performance and production standards of industrialized housing, relaxing the building standards, and providing financial support to promote industrialized housing.

A Study on the Analysis of Function for the Enhancement of the Tool for Assemble of Unit Modular (유닛모듈러 조립공구 개선을 위한 기능분석 연구)

  • Park, Nam-Cheon;Kim, Kyoon-Tai;Park, Su-Yeul;Jung, In-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.239-241
    • /
    • 2012
  • The major industrialized nations have continued to develop industrialized construction techniques based on automated production processes in factories, and are applying them to a wide range of building. However, the unit modular construction system has had a shorter history of development and application in Korea compared to advanced countries, and consequently, Korean modular builders have a relatively poor technical capacity. So this study is draw a conclusion on the target of priority improvement for idea creation. It study on the enhancement of the functionality of the tool for assemble of Unit Modular that choose the enhancement of the functionality through the analysis of function on the three-level of functional definition and classification, functional arrangement, functional appraisal.

  • PDF

A Study on the Automatic Design of Unit Modular House Using Component and Unit DB (부품 및 유닛 DB를 이용한 유닛 모듈라 주택의 설계자동화 연구)

  • Lim Seok-Ho;Kim Soo-Am;Hwang Eun-Kyung
    • Journal of the Korean housing association
    • /
    • v.17 no.3
    • /
    • pp.41-49
    • /
    • 2006
  • Precast concrete apartments were main stream of domestic industrialized housing around 90's, and Steel Houses applying Steel Stud technique with light weighted steel have been dominant portion since 1995. On the other hand, various building techniques including Steel Stud method and highly prefabricated and industrialized Unit method are prevailing in developed countries like Japan. Steel stud and unit box have their own merits and demerits, but the more crucial aspect is that the constant design standard should be applied in each design procedure. It entails the necessity of industrial housing development on the open system basis. In this study, the design standard for unit house will be established coping with the established preparing standard for design specifications defined by architectural law and promotion law of housing construction. That is for design standard of industrialized private housing on the open system basis. This study attempts to propose the design automation, with the method of unit construction of which the rate of pre-fabrication is the biggest, that can cope with the demand of user on the basis of open-system. Ticky-tacky is the biggest technical problem in suppling industrialization housing. Therefore, we will suggest a basic plan for design automation of unit modular housing which can raise the productivity of industrialization housing by applying open system, utilized by DB of component and unit, and solve the problem concerned about ticky-tacky.

A Study on the Design criteria of Steel Unit House for the Open System (유닛 모듈라 주택의 설계자동화를 위한 기초 연구(I) - 부품 및 유닛의 DB설정을 중심으로-)

  • Lim, Seok-Ho
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2005.11a
    • /
    • pp.287-290
    • /
    • 2005
  • Precast Concrete apartments were main stream of domestic industrialized housing around 90's , and Steel Houses applying Steel Stud technique with light weighted steel have been dominant portion since 1995. On the other hand, various building techniques including Steel Stud method and highly prefabricated and industrialized Unit method are prevailing in developed countries like Japan. Steel stud and Unit Box have their own merits an demerits, but the more crucial aspect is that the constant design standard should be applied in each design procedure. It entails the necessity of industrial housing development on the Open System basis. In this study, the design standard for Unit house will be established coping with the established preparing standard for design specifications defined by Architectural Law and Promotion Law of Housing Construction. That is for design standard of industrialized private housing on the Open System basis.

  • PDF

A Study on the Design criteria of Steel Unit House for the Open System (유닛 모듈라 주택의 설계자동화를 위한 기초 연구(II) - 유닛간의 결합/배치/평면구성 원칙을 중심으로-)

  • Lim, Seok-Ho
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2005.11a
    • /
    • pp.291-294
    • /
    • 2005
  • Precast Concrete apartments were main stream of domestic industrialized housing around 90's , and Steel Houses applying Steel Stud technique with light weighted steel have been dominant portion since 1995. On the other hand, various building techniques including Steel Stud method and highly prefabricated and industrialized Unit method are prevailing in developed countries like Japan. Steel Stud and Unit Box have their own merits and demerits, but the more crucial aspect is that the constant design standard should be applied in each design procedure. It entails the necessity of industrial housing development on the Open System basis. In this study, the design standard for Unit house will be established coping with the established preparing standard for design specifications defined by Architectural Law and Promotion Law of Housing Construction. That is for design standard of industrialized private housing on the Open System basis.

  • PDF

Short- and long-term deflections of RC building structures influenced by construction processes

  • Alvarado, Yezid A.;Buitrago, Manuel;Gasch, Isabel;Dominguez, Maria N.;Cipagauta, Miguel A.
    • Structural Engineering and Mechanics
    • /
    • v.64 no.2
    • /
    • pp.173-181
    • /
    • 2017
  • This paper analyzes the influence of the construction process on short- and long-term deflections on a reinforced concrete structure poured on-site by a portable industrialized system. A parametric analysis was carried out by the Finite Elements Method (FEM) that considered: a) type of construction process with reshoring or clearing (partial striking); b) the number of successively shored floors and c) the number of shores used on each floor. All three factors were especially important for the values of short- and long-term deflections, which were highest in the reshoring processes with the lowest number of successively shored floors and the lowest number of shores per floor. Deflections obtained were compared with the limits laid down by ACI 318-14 and as calculated by this code's simplified method. The long-term deflections were seen to be almost double than those obtained by applying the ACI 318-14 code's simplified method and in some cases these deflections were above the established limits. It can thus be concluded that the load history of a building under construction should be taken into account in order to satisfy a structure's in-service conditions and durability.

Discovering Applicable Lessons for '3D Printing R/D Project' Implementation Through Studying the Process of Adopting Overseas Industrialized Building Production Technological Knowhow in the Korean Context (한국의 공업화건축 공법 도입활용과정 분석을 통한 3D 프린팅기술 개발 방향성 연구)

  • Lee, Sung-Min;Lee, Pil-Won;Cho, Hoo-Young;Lee, Jae-Heon
    • Journal of Korean Association for Spatial Structures
    • /
    • v.17 no.4
    • /
    • pp.59-68
    • /
    • 2017
  • This paper aims at finding some lessons applicable to successful implementation of 'The 3D Printing R/D Project' through both examining the process of adopting overseas industrialized housing production technological knowhow by home builders during the 1970's~1980's period and thereafter until now the various efforts to adjust the technologies efficiently to the Korea's unique situation. Some meaningful lessons can be summarized as follows; I) Deep understanding of 3DP technological know-why along with its inheritance, II) Readjusting of R/D period and goals(cf. Global leader Winsun's 15 years experiment), III) Restructuring for more collaborative R/D B&E system among participating researchers IV) Fostering 3DP expert-engineers and technicians from the early stage, V) Clearing legal barriers in users' adopting 3DP methods necessary, VI) Development of appropriate building material besides concrete. Therefore, it is highly recommended that the above-mentioned 6 lessons positively accepted and applied to the Research Implementation Plan in due course, especially by KICT consortium and KAIA under the guidance of Ministry of Land, Infrastructure and Transport.

Analysis of a Long Volumetric Module Lift Using Single and Multiple Cranes

  • Khodabandelu, Ali;Park, JeeWoong;Choi, Jin Ouk;Sanei, Mahsa
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.563-570
    • /
    • 2022
  • Industrialized and modular construction is a growing construction technique that can transfer a large portion of the construction process to off-site fabrication yards. This method of construction often involves the fabrication, pre-assembly, and transportation of massive and long volumetric modules. The module weight keeps increasing as the modules become more complete (with infill) to minimize the work at the site and, as higher productivity can be achieved at the fabrication shop. Thus, a volumetric module delivery gets more challenging and risky. Despite its importance, past research paid relatively insufficient attention to the problem related to the lifting of heavy modules. This can be a complex and time-consuming problem with multiple lifting for transportation-and-installation operations both in fabrication yard and jobsite, and require complex crane operations (sometimes, more than one crane) due to crane load capacity and load balance/stability. This study investigates this problem by focusing on the structural perspective of lifting such long volumetric modules through simulation studies. Various scenarios of lifting a weighty module from the top using four lifting cables attached to crane hooks (either a single crane or double crane) are simulated in SAP software. The simulations account for various factors pertaining to structural indices, e.g., bending stress and deflection, to identify a proper method of module lifting from a structural point of view. The method can identify differences in structural indices allowing identification of structural efficiency and safety levels during lifting, which further allows the selection of the number of cranes and location of lifting points.

  • PDF

Development of Mobile Device of the Infill Modular Construction System (인필 모듈러 건설시스템의 이동장치 개발)

  • Kim, Chang-Han;Jung, Chan-Woo;Kim, Hyeong-Su;Hwang, Hyun-Jun;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.163-164
    • /
    • 2012
  • Recently new construction system, the Infill Modular Construction System, is being emphasized depending on the industrialized technology introduction and the needs of high-rise housing. In order to applicate the Infill Modular Construction System and activate the domestic market, development of insufficient element technologies against the advanced technologies should be preceded and mobile device development of Infill Unit Module which is differentiated from the existing modular construction systems should be needed urgently. As advanced research for the activation of the Infill Modular Construction System, this research aims to develop Infill Unit Module's mobile device. This is expected to improve the constructability of Infill Unit Module. In addition development of mobile device considering weight of Infill Unit Module and construction errors are being planned.

  • PDF