• Title/Summary/Keyword: incomplete preventive maintenance

Search Result 2, Processing Time 0.017 seconds

Determining the Optimum Maintenance Period of the Steel Making Equipment Having Multiple Failure Types (다수의 고장유형을 갖는 제철설비의 최적 정비주기 산출)

  • Song, Hong-Jun;Jun, Chi-Hyuck
    • IE interfaces
    • /
    • v.16 no.1
    • /
    • pp.27-33
    • /
    • 2003
  • The maintenance cost in K Steelworks has been continuously increased in proportion to the production cost. However, there seems to be a possibility of reducing cost through the optimization of maintenance actions. The failure types of the equipment in steelworks ate various with different failure cost. Thus the failure rate and cost of each type of failures should be considered simultaneously when the optimum maintenance period is to be determined. It is considered that the equipment undergoes periodic replacement and a specified number of incomplete preventive maintenance actions are performed during a replacement period. Assuming that the time to failure follows a Weibull distribution, the parameters of the failure rate are estimated using the maximum likelihood estimation. The optimal replacement period is determined to minimize the average cost per unit time. As the result of analysis it is suggested that the existing maintenance period for a hot-rolling equipment can be extended significantly.

An Optimum Maintenance Policy : A bayesian approach to periodic incomplete preventive maintenance with minimal repair at failure

  • Park, Kwang-Su;Jun, Chi-Hyuck
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1997.10a
    • /
    • pp.193-196
    • /
    • 1997
  • In this paper we consider a Bayesian theoretic approach to periodic incomplete preventive maintenance with minimal repair at failure. We assume that the system failure rate is increasing as the frequency of PM increases and that the system is replaced at the K-th PM under this maintenance strategy. The optimal policies which minimize the expected cost rates are discussed. We seek the optimal periodic PM interval x and replacement time K under a Weibull failure intensity. Assuming suitable prior distribution for the Weibull parameters, we derive the posterior distribution incorporating failure data and obtain the updated optimal replacement strategies.

  • PDF