• Title/Summary/Keyword: in-construction monitoring

Search Result 1,716, Processing Time 0.03 seconds

The Construction of the Vessel Monitoring System and the Protocol Analysis for the Calling of Location Requirement Using VHF-DSC (VHF-DSC 위치요청 프로토콜 분석과 선박관제시스템 구축)

  • Kim, Jeong-Nyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.12
    • /
    • pp.2800-2805
    • /
    • 2013
  • In preperation for the compulsory installation of VHF(Very High Frequency) wireless equipment and fishing vessel automatic identification system according to the revision of "The Ships Safety Act" and "Fishing Vessel act", Fishery Information & Communication Department of National Federation of Fisheries Cooperatives is building VHF communication network and automatic identification system for fishing vessel monitoring. This study suggests the protocol analysis for the calling of location requirement using DSC(Digital Selective Calling) function and show best way for fishing vessel automatic identification system. Also, it suggest way to realize fishing vessel monitoring system.

Investigation on Construction Process and Efficiency of Underwater Construction Equipment for Rubble Mound Leveling works (수중 고르기 장비의 건설 공정 및 효율성 분석)

  • Won, Deokhee;Jang, In-Sung;Shin, Changjoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.5
    • /
    • pp.372-378
    • /
    • 2016
  • A mound was constructed to install a caisson and sofa blocks underwater. The mound riprap, which were of uniform grade, size, shape, and specific gravity, formed the foundation for the support superstructure. Also, rubble leveling works were performed before installing structures such as caissons. In this study, underwater construction equipment was developed with a remotely controlled operating system and underwater environment monitoring system for unmanned underwater rubble leveling work. The performance of the developed equipment was verified using on-land and underwater tests. In addition to the performance verification, the construction process and economic efficiency of the equipment should be checked before applying it to the real construction field for commercial purposes. In this paper, a construction process using the developed equipment was proposed and compared with the existing rubble leveling method. The results demonstrated that the new construction method has higher economic efficiency and safety than the existing construction method.

Enhancing Automated Multi-Object Tracking with Long-Term Occlusions across Consecutive Frames for Heavy Construction Equipment

  • Seongkyun AHN;Seungwon SEO;Choongwan KOO
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1311-1311
    • /
    • 2024
  • Recent advances in artificial intelligence technology have led to active research aimed at systematically managing the productivity and environmental impact of major management targets such as heavy equipment at construction sites. However, challenges arise due to phenomena like partial occlusions, resulting from the dynamic working environment of construction sites (e.g., equipment overlapping, obstruction by structures), which impose practical constraints on precisely monitoring heavy equipment. To address these challenges, this study aims to enhance automated multi-object tracking (MOT) in scenarios involving long-term occlusions across consecutive frames for heavy construction equipment. To achieve this, two methodologies are employed to address long-term occlusions at construction sites: (i) tracking-by-detection and (ii) video inpainting with generative adversarial networks (GANs). Firstly, this study proposes integrating FairMOT with a tracking-by-detection algorithm like ByteTrack or SMILEtrack, demonstrating the robustness of re-identification (Re-ID) in occlusion scenarios. This method maintains previously assigned IDs when heavy equipment is temporarily obscured and then reappears, analyzing location, appearance, or motion characteristics across consecutive frames. Secondly, adopting video inpainting with GAN algorithms such as ProPainter is proposed, demonstrating robustness in removing objects other than the target object (e.g., excavator) during the video preprocessing and filling removed areas using information from surrounding pixels or other frames. This approach addresses long-term occlusion issues by focusing on a single object rather than multiple objects. Through these proposed approaches, improvements in the efficiency and accuracy of detection, tracking, and activity recognition for multiple heavy equipment are expected, mitigating MOT challenges caused by occlusions in dynamic construction site environments. Consequently, these approaches are anticipated to play a significant role in systematically managing heavy equipment productivity, environmental impact, and worker safety through the development of advanced construction and management systems.

Towards high-accuracy data modelling, uncertainty quantification and correlation analysis for SHM measurements during typhoon events using an improved most likely heteroscedastic Gaussian process

  • Qi-Ang Wang;Hao-Bo Wang;Zhan-Guo Ma;Yi-Qing Ni;Zhi-Jun Liu;Jian Jiang;Rui Sun;Hao-Wei Zhu
    • Smart Structures and Systems
    • /
    • v.32 no.4
    • /
    • pp.267-279
    • /
    • 2023
  • Data modelling and interpretation for structural health monitoring (SHM) field data are critical for evaluating structural performance and quantifying the vulnerability of infrastructure systems. In order to improve the data modelling accuracy, and extend the application range from data regression analysis to out-of-sample forecasting analysis, an improved most likely heteroscedastic Gaussian process (iMLHGP) methodology is proposed in this study by the incorporation of the outof-sample forecasting algorithm. The proposed iMLHGP method overcomes this limitation of constant variance of Gaussian process (GP), and can be used for estimating non-stationary typhoon-induced response statistics with high volatility. The first attempt at performing data regression and forecasting analysis on structural responses using the proposed iMLHGP method has been presented by applying it to real-world filed SHM data from an instrumented cable-stay bridge during typhoon events. Uncertainty quantification and correlation analysis were also carried out to investigate the influence of typhoons on bridge strain data. Results show that the iMLHGP method has high accuracy in both regression and out-of-sample forecasting. The iMLHGP framework takes both data heteroscedasticity and accurate analytical processing of noise variance (replace with a point estimation on the most likely value) into account to avoid the intensive computational effort. According to uncertainty quantification and correlation analysis results, the uncertainties of strain measurements are affected by both traffic and wind speed. The overall change of bridge strain is affected by temperature, and the local fluctuation is greatly affected by wind speed in typhoon conditions.

Concentrations of Particulate Matter Exposed to Farm Workers in the Broiler Houses (육계사 내 작업자의 미세먼지 노출량 현장모니터링)

  • Seo, Hyo-Jae;Oh, Byung-Wook;Kim, Hyo-Cher;Sin, So-Jung;Seo, Il-Hwan
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.62 no.5
    • /
    • pp.27-37
    • /
    • 2020
  • As domestic meat consumption increases, the broiler production industry has been larger and denser. The concentration of particulate matter (PM) and harmful gases generated is also increasing inside livestock house. However, the current research status of PM exposed to farm workers and the health effects are in the early stage. To understand PM concentration affecting workers in the broiler house, field monitoring was conducted according to its size distributions. Concentrations of PM10, PM2.5, and TD (Total Dust) were monitored using personal air samplers with teflon filter during working and moving periods considering the ventilation systems of 6 broiler houses. The purpose of this study is to monitor the PM concentration in the experimental broiler houses operated by forced ventilation system generally used in Korea and to evaluate the regional concentrations through airflow pattern. The PM concentrations were increased from inlet to outlet vents resulting in 1,872 of TD, 1,385 of PM10, and 209 ㎍/㎥ of PM2.5, respectively. The TD and PM10 concentrations were increased when the workers and broilers were moving. Among them, the particle size that occupied the largest amount of PM was 13.75 ㎛. These results suggest that personal protection equipments are important to reduce the health effect from PM inhalation.

Measurement of Tunnel 3-D Displacement using Digital Photogrammetry (디지털 영상을 이용한 터널 3차원 변위 계측)

  • Kim, Kwang-Yeom;Kim, Chang-Yong;Lee, Seung-Do;Seo, Yong-Seok;Lee, Chung-In
    • The Journal of Engineering Geology
    • /
    • v.17 no.4
    • /
    • pp.567-576
    • /
    • 2007
  • In order to assess the on-site applicability of 3D absolute displacement monitoring of tunnel using digital photogrammetry, the displacement of the optical target placed at the measurement section was investigated, as planned in the OO tunnel construction site. The targets on 3 measurement lines only were considered for each point of measurement for the reconstruction of 3D cubic model for the digital vision monitoring. For each 3D model, 3 or more images have to be obtained at each point. On the last 2 measurement lines, 6 targets (crown, left and right walls) were continuously overlapped to construct 3D models so that 6 or more apices can be shared by 2 3D models. In order to compare the measurement methods of 3D absolute displacements in tunnel excavation, i. e, total station and digital image measurement, both the digital image measurement and optical measurement were conducted for 10 times in the same work section. The time and measurement results of both methods were compared.

Performance monitoring of timber structures in underground construction using wireless SmartPlank

  • Xu, Xiaomin;Soga, Kenichi;Nawaz, Sarfraz;Moss, Neil;Bowers, Keith;Gajia, Mohammed
    • Smart Structures and Systems
    • /
    • v.15 no.3
    • /
    • pp.769-785
    • /
    • 2015
  • Although timber structures have been extensively used in underground temporary supporting system, their actual performance is poorly understood, resulting in potentially conservative and over-engineered design. In this paper, a novel wireless sensor technology, SmartPlank, is introduced to monitor the field performance of timber structures during underground construction. It consists of a wooden beam equipped with a streamlined wireless sensor node, two thin foil strain gauges and two temperature sensors, which enables to measure the strain and temperature at two sides of the beam, and to transmit this information in real-time over an IPv6 (6LowPan) multi-hop wireless mesh network and Internet. Four SmartPlanks were deployed at the London Underground's Tottenham Court Road (TCR) station redevelopment site during the Stair 14 excavation, together with seven relay nodes and a gateway. The monitoring started from August 2013, and will last for one and a half years until the Central Line possession in 2015. This paper reports both the short-term and long-term performances of the monitored timber structures. The grouting effect on the short-term performance of timber structures is highlighted; the grout injection process creates a large downward pressure on the top surface of the SmartPlank. The short and long term earth pressures applied to the monitored structures are estimated from the measured strains, and the estimated values are compared to the design loads.

Characteristics of Spatial Variability in Water Quality on Stream of Lake Doam Watershed (강우시 및 비강우시 수질 모니터링을 통한 도암호 탁수 발생 원인 분석)

  • Kwon, Hyeokjoon;Lee, Jaewan;Lim, Jungha;Woo, Soomin;Kim, Jonggun;Lim, KyeongJae;Kim, Dongjin;Hong, Eunmi
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.62 no.6
    • /
    • pp.43-50
    • /
    • 2020
  • The Doam Lake watershed is one of the non-point source management areas announced by the Ministry of Environment, and is a constant problem for the stream ecosystem dut to Storm water. In this study, a total of 48(rainfall) and 47(non-rainfall) sites were investigated for the entire watershed (Samyangcheon, Chahangcheon, Hoenggyecheon, Yongpyeongcheon, Songcheon, Lake Doam) on August 15, 2019 and on October 18, 2019 to estimate the source of turbid water in the Doam Lake watershed. Subsequently, water quality analysis was performed on Suspended Soild (SS), Turbidity, Total Phosphorus (TP), Total Nitrogen (TN), and Biochemical Oxygen Demands (BOD) and correlation among water quality parameters was analyzed based on the analyzed samples. As a result, most of the turbid water generated during rainfall was in highland fields. During rainfall, Hoengyecheon had the highest average SS concentration among all streams, and during non-rainfall, the average SS concentration was highest in Yongpyeongcheon, so the two stream were selected as vulnerable areas. However, since Yongpyeongcheon may be a temporary phenomenon due to river construction, additional continuous monitoring is required. Therefore, in the Doam Lake watershed, intensive management is required for vulnerable areas.

Efficient Management of Tunnel Construction Informations using ITIS(Intelligent Tunnelling Information System) (ITIS를 활용한 효율적인 터널 정보화 시공 관리)

  • Kim, Chang-Yong;Hong, Sung-Wan;Bae, Gyu-Jin;Kim, Kwang-Teom;Son, Moo-Rak;Han, Byeong-Hyeon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.946-951
    • /
    • 2004
  • ITIS is applied to the several tunnel construction sites in Korea. Tunnel construction properties which are acquired from these sites are transferred to information management server(SQL 2000 server)by client application program in real time. Access permission to DB server depends on the user's roles. Some functions which cannot be embodied in SQL Server are serviced through XML and GMS server is used for spatial data based on GIS part. This system is supposed to give engineers the advantages which are not only easy handling of the program and computerized documentation on every information during construction but also analyzing the acquired data in order to predict the structure of ground and rock mass to be excavated later and show the guideline of construction. Neung-Dong tunnel and Mu-Gua express way tunnel are now under construction and with this system they have 3D visualized map of the geology and tunnel geometry and accumulate database of construction information such as tunnel face mapping results, special notes and pictures of construction and 3D monitoring data, all matters on the stability of rock bolts and shotcrete, and so on. Ground settlement prediction program included in ITIS, based on the artificial neural network(ANN) and supported by GIS technology is applying to the subway tunnel. This prediction tool can make it possible to visualize the ground settlement according to the excavation procedures by contouring the calculated result on 3D GIS map and to assess the damage of buildings in the vicinity of construction site caused by ground settlement.

  • PDF

Selection of Tree History Management System Items for Analyzing the Causes of Landscape Tree Defects in an Apartment Complex

  • Park, Sang Wook
    • Journal of People, Plants, and Environment
    • /
    • v.23 no.3
    • /
    • pp.347-362
    • /
    • 2020
  • Background and objective: It is difficult to conclusively determine the exact cause of tree defects since multiple causes are involved such as climate change, plantation, tree quality and planting time, construction, planting base, drainage, sunshine conditions, maintenance, and microclimate. The data related to landscaping construction defects are scattered or fragmented by companies and years, but not managed systematically by the defect information management system. Most of the earlier studies associated with tree defects in apartment complexes suggested defect rates after examining tree defects in the completed construction site and proposed fragmentary and subjective conclusions about the causes of defects observed in trees with high defect rates. It is proposed to continue to conduct studies on the establishment and analysis of systematic databases to identify the exact causes of tree defects and measures to improve, and the need to accumulate systematic data in the construction process where many defects arises. This study was conducted to reduce the defects of trees planted in apartment complexes. Methods: Main factors related to tree defects were subdivided based on the results of literature review and a defect investigation at the completion site, and tree history management items were selected and subdivided during the construction stage. Results: The criteria for the preparation of subdivided items were obtained, and the tree history management checklist was written for the site under actual construction and a systematic database was established. Items that are categorized based to the causes of defects include the location of nurseries, date, tree quality, site conditions, planting techniques, microclimates, and maintenance. Conclusion: This study suggested tree history management items based on the tree defects that can be identified at the construction stage and applied them to the selected study site, which differentiates this study from earlier studies. It will be necessary to conduct a comprehensive and objective time series analysis on tree defects that occur over time by continuously monitoring and collecting data after construction.