• Title/Summary/Keyword: in-construction monitoring

Search Result 1,716, Processing Time 0.031 seconds

Field Test of Automated Activity Classification Using Acceleration Signals from a Wristband

  • Gong, Yue;Seo, JoonOh
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.443-452
    • /
    • 2020
  • Worker's awkward postures and unreasonable physical load can be corrected by monitoring construction activities, thereby increasing the safety and productivity of construction workers and projects. However, manual identification is time-consuming and contains high human variance. In this regard, an automated activity recognition system based on inertial measurement unit can help in rapidly and precisely collecting motion data. With the acceleration data, the machine learning algorithm will be used to train classifiers for automatically categorizing activities. However, input acceleration data are extracted either from designed experiments or simple construction work in previous studies. Thus, collected data series are discontinuous and activity categories are insufficient for real construction circumstances. This study aims to collect acceleration data during long-term continuous work in a construction project and validate the feasibility of activity recognition algorithm with the continuous motion data. The data collection covers two different workers performing formwork at the same site. An accelerator, as well as portable camera, is attached to the worker during the entire working session for simultaneously recording motion data and working activity. The supervised machine learning-based models are trained to classify activity in hierarchical levels, which reaches a 96.9% testing accuracy of recognizing rest and work and 85.6% testing accuracy of identifying stationary, traveling, and rebar installation actions.

  • PDF

Monitoring Landcreep Using Terrestrial LiDAR and UAVs (지상라이다와 드론을 이용한 땅밀림 모니터링 연구)

  • Jong-Tae Kim;Jung-Hyun Kim;Chang-Hun Lee;Seong-Cheol Park;Chang-Ju Lee;Gyo-Cheol Jeong
    • The Journal of Engineering Geology
    • /
    • v.33 no.1
    • /
    • pp.27-37
    • /
    • 2023
  • Assessing landcreep requires long-term monitoring, because cracks and steps develop over long periods. However, long-term monitoring using wire extensometers and inclinometers is inefficient in terms of cost and management. Therefore, this study selected an area with active landcreep and evaluated the feasibility of monitoring it using imagesing from terrestrial LiDAR and drones. The results were compared with minute-by-minute data measured in the field using a wire extensometer. The comparison identified subtle differences in the accuracy of the two sets of results, but monitoring using terrestrial LiDAR and drones did generate values similar to the wire extensometer. This demonstrates the potential of basic monitoring using terrestrial LiDAR and drones, although minute-byminute field measurements are required for analyzing and predicting landcreep. In the future, precise monitoring using images will be feasible after verifying image analysis at various levels and accumulating data considering climate and accuracy.

A Literature Review of Unmanned Aircraft System (UAS) Integrated Constructed Facility Condition Inspections (무인항공체계 기반 시설물 상태점검 최근 연구동향 분석)

  • Kwon, Jin-Hyeok;Yun, Jiyeong;Youn, JongYoung;Lee, Donghoon;Kim, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.172-173
    • /
    • 2021
  • In recent, unmanned Aircraft Systems (UAS) have been widely used for various purposes, such as safety inspection, facility condition inspection, progress monitoring, in the architecture engineering, and construction (AEC) industry. This technology can provide visual assets regarding the conditions of construction jobsites as well as constructed facilities during flying over the point of interests. With the significant interests in this advancement, the recent studies have presented how the UAS can be applied fro different types of facilities (e.g., buildings, power genereation systems, roads, or bridges) to inspect the current conditions of them for safe operations as well as public's safety. This study reviewed the receent studies to document their scientific findings and practical contributions, as well as provided the overview of further implications for future studies.

  • PDF

Application of Grouting of the Sea-Crossing Bridge Foundation in Busan-Geoje Fixed Link (부산~거제간 연결도로 해상교량기초 그라우팅 시공사례 연구)

  • Park, Chung-Whan;Jeong, Sang-Kyoon;Jeong, Gyeong-Hwan;Shin, Min-Sik;Park, Chan-Woo;Kwon, Jin-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2007.09a
    • /
    • pp.665-678
    • /
    • 2007
  • It was applied the grouting method to fill densely the space between the bottom of the caisson and the ground with the grout mixture mixed with anti-washout admixture after locating accurately the precast caisson on three concrete landing pads but it is far different from a costly conventional method, which place concrete to build the foundation of reinforcement concrete on the spot after excavating inside of the temporary coffering wall for the bridge foundation in the sea. To verify the grouting method in advance, the full-scale trial test was performed twice on the land. After confirming the fluidity of material for the injection and some possible problems during construction and then enhancing the original design, the main process is ongoing and it has been finished 12 spots until now. The purpose of this study is to introduces for the first time in Korea the grouting method including the automatic and the manual monitoring process applied to, based on the main process of the caisson foundation finished already in the site. In a similar construction it is sincerely expected to be referred to in the future.

  • PDF

Suggestion of a Design Method for UAM (강관 다단 그라우팅 공법(UAM)의 설계법 제안)

  • 박이근;임종철
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.3
    • /
    • pp.97-106
    • /
    • 2004
  • In case of tunnel construction with a shallow soil cover in cohesionless soils or highly weathered rocks, reinforcement measures are required for a tunnel stability during the tunnel construction. Recent developments show that the use of Umbrella Arch Method(UAM) as tunnel reinforcement and water cut-off in domestic projects has increased. Unfortunately, guidelines for the design and construction of UAM have not been established, only empirical designs and applications in tunnel construction have been performed so far. In this study, behaviour of the steel pipes installed on the tunnel roof was analyzed through the monitoring of bending and axial stresses of the pipes with the advance of the tunnel face. The monitoring results were used in the establishment of the loading mechanism around the pipe. This paper suggests, the guidelines used in the determination of the total length, overlapping length and lateral spacing of the reinforcing pipes obtained from the established loading mechanism.

Computer-Aided Monitoring and Assessment System for Maintenance of Grand Bridges (대형교량의 유지관리를 위한 전산화 모니터링 및 분석평가시스템)

  • Cho, Hyo Nam;Lim, Jong Kwon;Min, Dae Hong;Park, Kyung Hoon
    • Journal of Korean Society of Steel Construction
    • /
    • v.10 no.3 s.36
    • /
    • pp.369-381
    • /
    • 1998
  • This paper is intended to show some new approaches and concepts for the development of system model and prototype software for computer-aided Monitoring and Assessment(M&A) of grand bridges. The system model that incorporates optimal strategies for M&A of grand bridges is suggested. Reliability models are developed and a reliability-based capacity rating method is established for the evaluation of the bridge safety and reliability based on the real responses measured from a series of field load tests. Based on the proposed models, an integrated prototype software is then developed for computer-aided M&A of grand bridges under the environment of the graphic user interface, which is successfully applied to the M&A of an existing cable-stayed bridge. It may be stated that the system model and prototype software developed in this paper can be utilized and implemented in the development of the computer-aided M&A system for cable-stayed and suspension bridges.

  • PDF

Examination of the Ground Remote Monitoring System for Coastal Environmental Elements - Marine Radar and Camera System - (연안 환경 요소에 대한 지상 원격 관측 방법 고찰 - 마린 레이다와 카메라 시스템 관측을 중심으로 -)

  • Kim, Tae-Rim;Jang, Seong-Woo
    • Korean Journal of Remote Sensing
    • /
    • v.27 no.4
    • /
    • pp.403-410
    • /
    • 2011
  • Consistent observation with high temporal and spatial resolution is required for an efficient monitoring of coastal environments. Remote monitoring system installed on the ground is capable of simultaneous observation of wide coastal area and consistent observation with high frequency, which a small number of in-situ measurements cannot manage. This paper studies two typical ground based coastal monitoring system, marine radar and camera system. Marine radar can produce time series of frequency spectrum by integrating wave number spectrum calculated from spatial and temporal variation of waves in the radar image. The time averaged radar images of waves can analyze wave breaking zone, rip currents and location of littoral bars. Camera system can observe temporal variation of foam generation originated from coastal contamination as well as shoreline changes. By extracting the part of foams from rectified images, quantitative analysis of temporal foam variation can be done. By using the two above systems of different characteristics, synergetic benefit can be achieved.

Camera Monitoring of Topographical Changes of Daehang-ri Intertidal Flat Outside Semangeum Sea Dike No.1. (새만금 1호 방조제 외측 대항리 조간대 갯벌 지형 변화에 대한 영상 관측)

  • Kim, Tae-Rim;Park, Seoc-Kwang
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.21 no.6
    • /
    • pp.453-461
    • /
    • 2009
  • Camera monitoring of topographical changes of intertidal flat was performed at Daehang-ri mud flat outside Semangeum sea dike No. 1, where creation of mud flat was reported after sea dike construction. Ground survey on the mud flat is often limited only to points or few line surveys because of difficulty of walking and limitation of working hours by flood/ebb. This study uses natures of tide that the water lines moving on the intertidal flat during a flood indicate depth contours between low and high tide. Ground coordinates for the water lines extracted from the consecutive images of intertidal flat are calculated and information of topography is acquired by integrating all the water line data. Analysis of 6 camera monitoring data between September 2005 and September 2009 shows 0.127 m deposition per year on the average and variation of deposition/erosion in space and time.

Development of 3D absolute displacement monitoring system and its application at the stage of tunnel construction (터널 시공 중 3차원 절대변위 계측시스템의 개발과 적용)

  • Bang, Joon-Ho;Kim, Ki-Young;Jong, Yong-Hun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.3
    • /
    • pp.229-240
    • /
    • 2007
  • The 3D absolute displacement monitoring system has been developed to analyze the tunnel convergence measured under construction of underground structures and to manage effectively the measured data. The system is comprised of the total station, the anchor-typed target pin and the 3D absolute displacement measurement and management program. In this paper, the types and specifications of the 3D total station were presented. The anchor-typed target pin, an improved model of traditional one, was developed and its sightable distance and measurement accuracy were checked by field tests. Also a 3D absolute displacement measurement and management program, TEMS 3D, was developed to provide some analysis tools including the trend and influence lines. L/C ratio, S/C ratio and the like. The developed system was applied the construction stage of a railway tunnel for testing purpose. It is verified that the developed system is capable of predicting weak zones ahead of tunnel face by comparing with results of TSP (Tunnel Seismic Prediction) survey.

  • PDF

Project Risk Management & Observational Method for soft ground improvement (연약지반을 대상으로 한 프로젝트 리스크와 현장계측의 과제와 대책)

  • Imanishi, Hajime
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.509-514
    • /
    • 2006
  • Considering the risk management, there are many examples and various studies for the corporation risk. However, I have never seen the project risk management that applied a construction site for practical approach. Therefore, I have developed a chart (I-Chart) for the project risk management, and also built a model (I-Chart scenario analysis) that I could use. I applied this model to container yard reclaimed land in harbor construction with approaching of geotechnical engineering.

  • PDF