• Title/Summary/Keyword: in-construction monitoring

Search Result 1,716, Processing Time 0.028 seconds

Development and Evaluation of Business Productivity of Construction Integrated Management System based on ERP System (ERP 기반 건설통합관리시스템의 개발 및 업무생산성 평가)

  • 백명종
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.3
    • /
    • pp.163-180
    • /
    • 2001
  • New information technology contributes to raising of business productivity in many construction companies. The application of construction integrated management system is expected to save the time of decision-making in business management and shorten the closing account schedule. Construction Integrated Management System based on ERP(Enterprise Resource Planning) system allows to control core business procedure by monitoring technique on real-time. In this paper, we achieves 10% raise up business productivity in site business area, and 30% raise up business productivity in head of nce business area by means of DW-CIMS (Daewoo Construction Integrated Management System)

  • PDF

Development and Business Productivity of Construction Integrated Management System based on ERP System (ERP 기반 건설통합관리시스템의 개발 및 업무생산성 평가)

  • 한희석;백명종;배은화
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.127-140
    • /
    • 2001
  • New Information Technology Contributes to raising of Business Productivity in many Construction Companies. The Application of Construction Integrated Management System is Expected to Save the time of decision-making in Business Management and shorten the Closing Account Schedule. Construction Integrated Management System Based on ERP(Enterprise Resource Planning) System allows to Control core Business Procedure by Monitoring Technique on Real-time. In This Paper, We achieves 10% Raise up Business Productivity in Site Business Area, and 30% Raise up Business Productivity in Head Office Business Area by means of DW-CIMS (DAEWOO Construction Integrated Management System)

  • PDF

도심지역 지하수관리를 위한 지하수환경 모니터링

  • 이진용;최미정;이명재;이강근
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2002.09a
    • /
    • pp.277-279
    • /
    • 2002
  • In late of the 1980's, dramatic increase in water use caused over-exploitation of groundwater and deterioration of water quality in urban areas. To monitor quantity of groundwater resources and their qualities, local groundwater monitoring networks were established. Groundwater resources in urban areas are affected by various human activities including underground building construction (subway), pumping for water use, and pavements. Detailed analysis of the monitored groundwater data would provide some good implications for optimal and efficient management for groundwater resources in the urban area.

  • PDF

Monitoring concrete bridge decks using infrared thermography with high speed vehicles

  • Hiasa, Shuhei;Catbas, F. Necati;Matsumoto, Masato;Mitani, Koji
    • Structural Monitoring and Maintenance
    • /
    • v.3 no.3
    • /
    • pp.277-296
    • /
    • 2016
  • There is a need for rapid and objective assessment of concrete bridge decks for maintenance decision making. Infrared Thermography (IRT) has great potential to identify deck delaminations more objectively than routine visual inspections or chain drag tests. In addition, it is possible to collect reliable data rapidly with appropriate IRT cameras attached to vehicles and the data are analyzed effectively. This research compares three infrared cameras with different specifications at different times and speeds for data collection, and explores several factors affecting the utilization of IRT in regards to subsurface damage detection in concrete structures, specifically when the IRT is utilized for high-speed bridge deck inspection at normal driving speeds. These results show that IRT can detect up to 2.54 cm delamination from the concrete surface at any time period. It is observed that nighttime would be the most suitable time frame with less false detections and interferences from the sunlight and less adverse effect due to direct sunlight, making more "noise" for the IRT results. This study also revealed two important factors of camera specifications for high-speed inspection by IRT as shorter integration time and higher pixel resolution.

Three Dimensional Construction Stage Analysis and Deformation Monitoring of a Reinforced Concrete Highrise Building (철근콘크리트조 초고층건물의 3차원 시공단계 해석 및 시공중 변형 계측)

  • Jeong, Daegye;Yu, Eunjong;Ha, Taehun;Lee, Sungho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.6
    • /
    • pp.573-580
    • /
    • 2014
  • In this paper, axial strains and lateral displacements of columns in a 58-story reinforced concrete building were measured using vibrating wire gauge and laser scanner, respectively, and compared with predicted values. Predictions were obtained using ASAP, which is a 3D construction stage analysis program developed based on PCA report. Comparisons indicated that columns in the middle of floor plan showed good correlation with predictions. However, the columns in the corners showed some deviations. Lateral displacement of columns between measurement and estimation showed similar trends but considerable deviations, which are seemingly caused by construction error of column faces, and inaccuracy in differential vertical displacement prediction.

Research on Realtime Mornitoring System for Construction Equipment Price (건설기계가격 상시관리시스템 도입방안에 관한 연구)

  • Ahn, Bang-Ryul;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.50-51
    • /
    • 2014
  • Although price of construction equipment affects overall cost of a construction projects, the cycle of updating them presented in the Poom-Saem in Korea is more than six years. Recently there is a demand of using the 'Standard Market Price of Construction Equipment', published by the ministry of Security and Public Administration, for estimating equipment operating and ownership cost. It is urgent to introduce an advanced system for updating the prices which can timely reflect market changes.

  • PDF

Basic Research for Construction Indoor Digital Twin Construction (건설공사 실내 Digital Twin 구축을 위한 기초연구)

  • Kim, Young Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.349-350
    • /
    • 2023
  • In the field of domestic construction, 3D modeling mainly targets outdoor construction sites, and acquires outdoor spatial information by operating UAVs and UGVs equipped with cameras. 3D modeling of construction sites tends to expand its scope to indoors along with the increasing demand for site monitoring and management through indoor spatial information. In the case of indoors, it is impossible to shoot with a drone after the framework and outer walls of the building are completed, so it is necessary to collect indoor spatial information and 3D modeling using a 360 camera. The purpose of this study is limited to basic research to establish a process that can obtain simple and high-quality indoor 3D modeling results using indoor data collected from 360 cameras.

  • PDF

Development of Expertise-based Safety Performance Evaluation Model

  • Yoo, Wi Sung;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.159-168
    • /
    • 2013
  • Construction projects have become increasingly complex in recent years, resulting in substantial safety hazards and frequent fall accidents. In an attempt to prevent fall accidents, various safety management systems have been developed. These systems have mainly been evaluated qualitatively and subjectively by practitioners or supervisors, and there are few tools that can be used to quantitatively evaluate the performance of safety management systems. We propose an expertise-based safety performance evaluation model (EXSPEM), which integrates a fuzzy approach-based analytic hierarchy process and a regression approach. The proposed model uses S-shaped curves to represent the degree of contribution by subjective expertise and is verified by a genetic algorithm. To illustrate its practical application, EXSPEM was applied to evaluate the safety performance of a newly developed real-time mobile detector monitoring system. It is expected that this model will be a helpful tool for systematically evaluating the application of a robust safety control and management system in a complex construction environment.

Cutting-edge Technologies to Achieve a Higher Level of Modular Construction - Literature Review

  • Lee, Seungtaek;Choi, Jin Ouk;Song, Seung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.536-542
    • /
    • 2022
  • Cost overruns, schedule delays, and a shortage of skilled labor are common problems the construction industry is currently experiencing. Modularization and standardization strategies have the potential to resolve the various problems mentioned above and have been applied for various construction applications for a long time. However, the level of modularization remains low, and modular construction projects have not been getting the full benefits. Thus, this review investigated the cutting-edge technologies currently being utilized to develop the modular construction field. For this paper, qualified research papers were identified using predetermined keywords from previous related research papers. Identified literature was then filtered and analyzed. According to the included reviews, several technologies are being developed for modular construction. For example, automated design and monitoring systems for modularization were developed. In addition, research labs are utilizing robotic arms for modular construction to achieve a high level of completion in the construction industry, as is seen in the manufacturing industry. Despite these efforts, more research and development are necessary because some automation technologies still require manual activities. Thus, there is great potential for further development of modularization techniques, and further research is recommended to achieve high levels of modularization.

  • PDF

Monitoring and restoration plan after construction of Wildlife Corridor at Mt. Galmachi of Sungnam City (성남시 갈마치 지역의 야생동물이동통로 복원계획 및 조성 후 모니터링)

  • Chun, Seung-Hoon;Lee, Sang-Don;Chae, Soo-Kwon
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.6
    • /
    • pp.907-914
    • /
    • 2011
  • This study aims at monitoring the efficiency of wildlife corridor in the city of Sungnam, Gyunggi Province. During 2008-2010 for 13 months the CCTV in the city office followed number and population density using the wildlife corridor. Based on the monitoring Korean raccoon dog(Nyctereutes procyonoides) and water deer(Hydropotes inermis), Korean hare(Lepus coreanus), Korean yellow-weasel(Mustela sibirica), Korean squirrels(Sciurus vulgaris) used most often and counting 884 individuals.. This counts over 73% of targeted species and also verifies the project objectives. In future the monitoring should be increased and identify behavioral patterns focusing on ecological networks of previously fragmented habitats.