• Title/Summary/Keyword: in-circuit test

Search Result 1,629, Processing Time 0.031 seconds

Parameters Estimation Characteristics of Five-Phase Squirrel-Cage Induction Motor within Over Current Load (과전류 부하에서 5상 농형 유도전동기의 정수 특성)

  • Kim, Min-Huei
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.7
    • /
    • pp.38-46
    • /
    • 2015
  • This paper propose a variable parameter estimations for variable over current load of five-phase squirrel-cage induction motor(IM) to servo control system. In order to high performance control of AC motor using a field oriented control(FOC) and direct torque control(DTC) algorithm, there are required precise motor parameters for slip calculation, flux observer, controller gain, torque command of current components, rotor position, speed estimation, and so on. We are suggest a analyzed estimation results of the motor parameters that developing five-phase squirrel-cage IM have a stator of concentrated winding for experimental within variable over current load at rated input frequency. There are results of stator winding measurement, no-load test, locked-rotor test, variable over current load test, and estimated parameters of equivalent circuits using manufactured experimental apparatus by IEEE Standard Test Procedure for Polyphase Induction Motors and Generators 112-2004.

Basic Study of Degradation Test for Magnetic Contactors and Reliability Centered Maintenance

  • Ryu, Haeng-Soo;Han, Gyu-Hwan;Yoon, Nam-Sik
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.4
    • /
    • pp.441-444
    • /
    • 2007
  • The mechanical endurance is the critical characteristic of Magnetic contactors (MCs), which are widely used in such industrial equipments as elevators, cranes, and factory control rooms in order to close and open the control circuit. Testing time, however, is so long in most cases that some method of reducing the testing period is required. Therefore, the degradation test by the detected vibration of MCs is developed to reduce the testing time in this work. The degradation test data are analyzed and the prediction model is provided. Also, the possibility of this technology for Reliability Centered Maintenance (RCM) will be shown. This will reduce the period of the product development and raise the reliability of the equipment in power distribution.

Extension of Absolute Evaluation Technique for Ratio Error and Phase Displacement of Core Type Current Transformers: Ip =$5\;kA{\sim}40\;kA$ (철심형 전류변성기의 비오차 및 위상오차 절대 평가 기술의 확장 : 1차 전류 = $5\;kA{\sim}40\;kA$)

  • Kim, Yoon-Hyoung;Han, Sang-Gil;Jung, Jae-Kap;Han, Sang-Ok
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.57 no.4
    • /
    • pp.431-436
    • /
    • 2008
  • We have extended an absolute evaluation method to obtain the ratio error and phase displacement of a current transformer (CT) up to primary current of 40,000 A by measuring four parameters of equivalent circuit in CT. The method was applied to CTs under test with the current ratios in the range of 5,000 A / 5 A - 40,000 A / 5 A. The ratio error and phase displacement of the CTs under test obtained in this study are consistent with those measured at the national institutes in Canada and Germany using the same CTs under test within an expanded uncertainty (k = 2) in the overall current ratios.

Developement of Web-Based Circuit-Constructible remote Laboratory (회로구성이 가능한 인터넷 기반의 원격 실험실 구축에 관한 연구)

  • Joung, Soung-Hun;Kim, Ho-Seong
    • Proceedings of the KIEE Conference
    • /
    • 2001.07d
    • /
    • pp.2603-2605
    • /
    • 2001
  • In this paper, we introduce the concept and construction of a web-based bidirectional remote laboratory system. In this configuration, students build and test circuits using internet at home, and the circuit components and experimental equipments at the school are interconnected following student's design. This means that it is possible to choose components, build circuits, connect experiment equipments, control the equipment. and receive measurement results at home in real-time. Labview and Java are used to control this system efficiently and to provide user-friendly environments. Computer-based function generator, DMM, and oscilloscope are used and switch module is used to change interconnections. It was found that a system adopting computer-based instruments, which include PXI/CompactPCI modules and PC plug-in board, provide better performance than that adopting stand-alone instruments connected with GPIB. It is believed that, if this system is installed, the real experiments, not the virtual experiments based on simulation, can be done at home effectively, resulting in revolutional change in engineering education.

  • PDF

Development of High-Sensitivity and Entry-Level Nuclide Analysis Module (고감도 보급형 핵종 분석 모듈 개발)

  • Oh, Seung-Jin;Lee, Joo-Hyun;Lee, Seung-Ho
    • Journal of IKEEE
    • /
    • v.26 no.3
    • /
    • pp.515-519
    • /
    • 2022
  • In this paper, we propose the development of a high-sensitivity entry-level nuclide analysis module. The proposed measurement sensor module consists of an electronic driving circuit for nuclide analysis resolution, prototype production with nuclide analysis function, and GUI development applied to prototypes. The electronic part driving circuit for nuclide analysis resolution is divided into nuclide analysis resolution process by the electronic part driving circuit block diagram, MCU circuit design used for radiation measurement, and PC program design for Spectrum acquisition. Prototyping with nuclide analysis function is made by adding a 128×128 pixel OLED display, three buttons for operation, a Li-ion battery, and a USB-C type port for charging the battery. The GUI development department applied to the prototype develops the screen composition such as the current time, elapsed measurement time, total count, and nuclide Spectrum. To evaluate the performance of the proposed measurement sensor module, an expert witness test was conducted. As a result of the test, it was confirmed that the calculated result by applying the resolution formula to the Spectrum (FWHM@662keV) obtained using the Cs-137 standard source in the nuclide analysis device had a resolution of 17.77%. Therefore, it was confirmed that the nuclide analysis resolution method proposed in this paper produces improved performance while being cheaper than the existing commercial nuclide analysis module.

The Method of Reinforcing the Immunity of Residual Current Circuit Breaker for the EMC Composite Surge (누전차단기의 EMC 조합서지 내성 강화를 위한 방안)

  • Kim Jae-Chul;Han Yoon-Tak;Kim Oun-Seok;Seol Kyu-Hwan;Kang Jang-Kyou;Moon Jong-Fil
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.8
    • /
    • pp.322-328
    • /
    • 2006
  • In this paper, The impulse un-tripping characteristics and the electro magnetic compatibility characteristics are compared with each other. The performance of impulse un-tripping test exists at domestic standard (KSC 4613). However test items are insufficient because the more test items such as EMC exist at international standard (IEC). Also, Electric Appliances Safety Certificate has taken the certificate test since July 2004 in Korea but did not confirm the EMC performance for RCCBs made in Korea. Thus, in this paper, We experiment with Oscillatory waves immunity test and the 7 EMC tests for 32 RCCBs of 4 types (mini, home standard, plug, outlet) for 16 brands according to IEC standard 61009-1 and 61008-1. As a result, 24 RCCBs proved to be poor for surge immunity test. However the RCCBs operating incorrectly for surge immunity test operate correctly for oscillatory waves immunity test. Thus, the correlation between oscillatory waves immunity test and EMC test is little and standard for compatibility of combination surge at IEC 61000-4-5 should be added to KS standard as soon as possible.

Analytic Estimation of Interrupting capability on contact system in MCCB (배선용 차단기(MCCB) 차단성능 평가해석 기법)

  • Choi, Y.K.;Chong, J.K.;Kim, I.Y.;Park, I.H.;Hwang, G.C.;Lee, K.S.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.628-632
    • /
    • 2002
  • Low voltage circuit breakers which interrupt rapidly and raise the reliability of power supply are widly used in power distribution systems. In the paper, it was investigated how much Interrupting capability was improved by correcting the shape of the contact system in molded case circuit breaker(below MCCB), especially arc runner. Prior to the interrupting testing, it was necessary for the optimum design to analyze electromagnetic forces on the contact system, generated by current and flux density. This paper presents both our compuational analysis and test results on contact system in MCCB

  • PDF

Fabrication of High Aspect Ratio Micro Structure for fine pitch probe production (Fine pitch probe 제작을 위한 고세장비 마이크로 구조물 제작)

  • Lee, S.I.;Kim, W.K.;Pyo, C.R.;Kim, D.Y.;Yang, S.J.;Ko, K.H.;Kim, H.J.;Jeon, B.H.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2007.10a
    • /
    • pp.356-359
    • /
    • 2007
  • Continuing improvements in integrated circuit chip density and functionality have mostly contributed toward a very large-scale integrated circuit(VLSI) and display device. In order to test (pass or fail) all of the high integrated semiconductor chip and display device, fine pitch probes are used. Fine pitch probes are manufactured by electroforming process of a Ni alloy in an electrolytic bath. In this paper, we expect that the electric field in bath with the Finite Element Method and applying the FEM result. So, we can obtained the probes that have high aspect ratio of 10 : 1

  • PDF

Heuristics for Sequencing Printed Circuit Boards on a Surface Mount Device Placement Machine (SMD기계의 PCB 생산순서 결정을 위한 발견적 기법)

  • Song, Chang-Yong;Shinn, Seong-Whan
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.195-203
    • /
    • 2000
  • This paper considers the problem of sequencing printed circuit boards(PCBs) on an automatic surface mount device(SMD) placement machine in order to minimize total setup time. Since the total set of component feeders needed by all boards cannot be loaded simultaneously on the magazine, the setup must be made between two successive boards in the sequence. It is assumed that the setup time depends on the number of component feeders to be replaced in the magazine. An important characteristic is that each feeder occupies a different number of slots in the magazine. This problem is equivalent to travelling salesman problem(TSP) except that the distances between two cities, that is, the setup times between two boards, are not known in advance. So, TSP-based heuristics with new distance functions are presented and their performances are compared through various test problems. Computational results indicate that our heuristics outperform existing methods.

  • PDF

Requirements Development for Intermittent Failure Detection of an Avionics Backplane based on Physics-of-Failure (백플레인 형식 항전장비에서 발생하는 간헐결함 탐지를 위한 고장물리 기반의 요구도 개발)

  • Lee, Hoyong;Lee, Ighoon
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.27 no.3
    • /
    • pp.15-23
    • /
    • 2019
  • This paper contains analyses and development processes of the requirements to detect the possible intermittent failure in an old avionics backplane. Interconnections for signal transmission between electronic components, such as Pin-to-PCB, FPCB-to-FPCB, pin-to-FPCB, and pint-to-wire, were selected as the main cause of intermittent failure by analyzing target equipment and documents. The possibility of detecting intermittent failures occurring in the target equipment is verified by physics-of-failure analyses. In order to verify the occurrence of intermittent failures and their detectability, latching continuity circuit testers were manufactured and accelerated life tests were performed by applying temperature and vibration cycle in consideration of flight conditions. Through the above process, the detection requirements for the major intermittent failure in the target avionics backplane was developed.