• Title/Summary/Keyword: improvement project

Search Result 2,198, Processing Time 0.029 seconds

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

A Case Study of SW Development Productivity Improvement by MDD/MDA Technology Application in CBD Project (CBD 프로젝트에서의 MDD/MDA 기술 적용을 통한 개발생산성 향상 사례)

  • Choi, Jeong-Il
    • Journal of Information Technology Services
    • /
    • v.5 no.2
    • /
    • pp.179-188
    • /
    • 2006
  • MDD/MDA which recently raising its head is technology that increase software development productivity through automatic transformation form higer abstract model into lower abstract model, or from model to code. This paper analyzes the effect on productivity by measuring Function Point per MM(man-month) in a software development project which performed in CBD methodology, and introduce the method of applying MDD/MDA technology in the project.

An Evaluation Models for R&D Projects Selection (연구개발과제 선정을 위한 단계별 평가모형)

  • 이상철;하정진;김성희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.31
    • /
    • pp.73-80
    • /
    • 1994
  • Sequentiality in decision making is an inherent characteristic of the R&D Process, Conceptual changes are noted during the Course of the Project which represent a continuous improvement in the quality of the data available during the various project stages. In this paper, Eight characteristic types of project evaluation models have been developed economic index models, portfolio models, decision theory models, risk analysis models, frontier models, scoring models, profile models and checklists. Each of these will be critically reviewed and appraised.

  • PDF

Establishment of Product Data Management for Advanced EMU (차세대전동차 정보관리시스템 구축에 관한 연구)

  • Lee, Han-Min;Kim, Gil-Dong;Oh, Seh-Chan
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1418-1422
    • /
    • 2006
  • The project of advanced urban transit system development is developing the advanced vehicle and the core technologies for the cost down by system change, the transport safety and the environmental friendliness and the improvement of passenger service. The product data management system is installed for management of each project. Various data and informations producted from each project are made for database. Therefore, we develop the product data management system.

  • PDF

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF

A Study on the Characteristic of Resettlement Decision in Urban Redevelopment Project District (도시정비사업지구의 거주자 재입주 선택 특성에 관한 연구)

  • Son, Yeong-Wung;Kim, Seung-Woon;Lee, Joo-Hyung
    • KIEAE Journal
    • /
    • v.12 no.1
    • /
    • pp.11-19
    • /
    • 2012
  • The subject of this study is capital area including Seoul and Incheon, and metropolitan area including Daejeon and Busan among urban redevelopment project district that are currently promoting urban redevelopment project. Data for analysis is implemented collected through visiting each households in project district. Resettlement decision characteristics are analyzed with considering householder's characteristic, house member's characteristic, residential space's characteristic, and area characteristic of families residing in urban redevelopment project area. Through researching characteristics and preferences of residents in project area by urban redevelopment business, improvement were found and implications were provided. Consequently, there are many factors to consider resettlement when deciding household's resettlement when deciding on household's resettlement after the redevelopment project depending on household's characteristics. So, political methods are needed to accomplish urban redevelopment project by resident's position through characteristic and preference survey of resident on project district. Therefore, the study can be utilized as basic data that considers characteristic of each households and region when establishing house policy in order to correspond to housing market that satisfies future consumer's demand.

A Study on Project Management System (프로젝트 관리 시스템에 관한 연구)

  • Park, Koo-Rack
    • Journal of Digital Convergence
    • /
    • v.13 no.1
    • /
    • pp.305-311
    • /
    • 2015
  • Nowadays, because IT market expansion and complexity has been progressing and competition has intensified, there is a growth of information system building industries having difficulty through traditional business management methods. A survey was conducted among site personnel (Project Manager PM and Project Participants) to generate an institutional framework to efficiently manage this and project management process support. Through this, the importance of element technology and fragility of software development project management must be understood and an improvement of the element technology must be generated. By using this, a very relevant result that presented a logical basis was obtained in the decision making of the importance of project management and the role of overall project manager and core project management fields.

THE IDENTIFICATION OF MALAYSIAN CONTRACTOR SATISFACTION DIMENSIONS: A STRATEGY FOR CONTINUOUS IMPROVEMENT

  • Md Asrul Nasid Masrom;Martin Skitmore;Adrian Bridge
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.335-339
    • /
    • 2011
  • The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors' needs, mutual objectives and open communication to help to deliver a successful project.

  • PDF

A Study on Gang-buk Residents' Consciousness and Prefered Image for Housing;Focused on New Town Project District Residents (강북 주민의 주거의식과 선호 주거상(像)에 관한 연구;뉴타운 사업지구 주민들을 대상으로)

  • Ahn, Young-Jin;Choe, Jeong-Min
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2006.11a
    • /
    • pp.109-114
    • /
    • 2006
  • Since 1970, concentrated development in Gang-nam caused serious differences with Gang-buk, such as housing environment, education, culture, industry, economy, and consumption behavior as well as Urban Infrastructure. In this result, the government has executed New Town project to solve these matters, but the residents' opinion wasn't reflected. The purpose of this study is to research New Town project district residents' consciousness and prefered image for housing and this research will be applied to basic study for housing environment improvement policy in future. The results of this study are summerized as follows : First, living satisfaction is revealed almost low level, and the most demands for improvement are to solve lacks of park and green yard. Second, image of Gang-nam, which of housing environment is better than Gang-buk, is expressed as the words, 'Complicated', 'Complex', 'Polished', 'Convenient', 'Rich'. Third, prefered types of housing are high-rise Residental Complex, Apartment mixed with detached housing, and tower-type apartment. And These are connected with there values

  • PDF

A Study on Determinants of Elderly Residental Satisfaction on the Planned Elements of the Participatory Residential Environment Improving Projects - Focused on the Project of Yonnam-dong - (주민참여형 주거지 재생사업에 대한 고령거주자의 사업 만족도 결정요소 연구 - 연남동 사업지구를 대상으로 -)

  • Kim, Ah-Leum;Koo, Ja-Hoo
    • Journal of the Korean housing association
    • /
    • v.25 no.5
    • /
    • pp.125-132
    • /
    • 2014
  • The purpose of this study is to estimate the determinants of Elderly Residental Satisfaction on the residential environment improving projects and suggest the political implications. The survey include questionnaires about the satisfaction level on the project physical and non-physical maintenance factors. The results were statistically analyzed by Correlation Analysis and Regression Analysis. As the result of the study, firstly, it shows that 'traffic and improve pedestrian environment' and 'improved parking environment' factors that are important to the satisfaction of the elderly residents of a high impact on the business component a physical maintenance. Secondly, it shows that 'home improvement and management support' and 'economic foundation' factors that are important to the satisfaction of the elderly residents of a high impact on the business component a non-physical maintenance. The results of analysis on the determinants of Elderly Residental Satisfaction on the residential environment improving projects of Yonnam project may be important foundation for future strategies for improvement.