• Title/Summary/Keyword: hydrograph analysis

Search Result 242, Processing Time 0.023 seconds

A Synthesis of Unit Hydrograph by a Correlation Analysis between the Basin Characteristics and the Runoff-Characteristics - Han and Geum River Basin - (유역특성과 유출특성간의 상관관계 해석에 의한 단위유량도의 합성 - 한강 및 금강유역 -)

  • 윤용남;선우중호
    • Water for future
    • /
    • v.8 no.1
    • /
    • pp.61-79
    • /
    • 1975
  • An attempt is made to develope a scheme for synthesizing unit hydrograph for any arbitrary small watershed in the Han or Geum River basin, which can be applied in determining various sizes of design flood for flood control prijects. Stage gauging stations, seven in the Han and five in the Geun River basin with rating curves, were selected as subbasins for the analysis. Unit hydrographs of 2-hour duration were derived for several heavy storm events using the storm and the corresponding flood runoff data for each subbasin. The Clark method programmed by the Hydrologic Engineering Center, U.S. Corps of Engineers, was utilized for derivation of instantaneous unit hydrographs which were, in turn, converted into 2-hour unit hydrograph. By averaging the 2-hour unit hydrographs from several storm events a representative 2-hour unit hydrograph was determined for each subbasin and hence a separate derivation of dimensionless unit hedrograph was also possible for the Han and Geum River basins. The physiographic characteristics such as stream length, distance to the centroid of each watershed were correlated with the characteristic parameters of the derived unit hydrograph for the subbasins within two large basins. correlation analyses between the characteristic parameters were also made. These correlation analyses resulted a series of four equations and a dimensionless unit hydrograph for the two large basins, which made it possible to draw a synthetic 2-hour unitgraph for any small watershed within the Han or Geum River basin. A detailed procedure for aplying the derived method for an arbitrary basin is summarized with one sample computation for each of the two basins. A comparison of the actually derived 2-hour unit hydrogrograph and the synthesized one showed a fair agreement. A recommendation is made for the further study.

  • PDF

Derivation of the Synthetic Unit Hydrograph at Ungaged Small Watershed (미계측 소하천수계의 합성단위도 유도)

  • 안상진;이억한
    • Water for future
    • /
    • v.19 no.2
    • /
    • pp.157-166
    • /
    • 1986
  • The objective of this study was to determine the best representative synthetic unit hydrograph that is applicable to ungaged small watershed. A typical unit hydrograph was established with the actual data from a small watershed. Four currently well-known methods for analyzing ungaged small watershed, including Snyder's, Clark's S.C.S. and Nash methods, were evaluated with the data from the same small watershed. The following observations were noted from the analysis of four methods. The Snyder's method yielded the similar peak discharge value as the typical unit hydrograph. With co-ordinates of three discharge values, i.e. 25%, 50% and 75% of peak discharge, were not adequate for deriving a typical unit hydrograph in ungaged small watershed. With Clark's method there shall be some way of obtaining the exact base length of time area diagram and isochrone of each reach of the stream. With Nash method peak discharge and base flow time are affected by the storage constant and gamma function argument; therefore, for deriving a more reliable and workable unit hydrograph one needs to select for the better estimation of storage constant and gamma function argument. In S.C.S. method peak discharge is directly related to the watershed area and inversely related to the time of peak diacharge. Therefore area with faster peak discharge yielded the higer peak discharge value. Although the peak discharge value obtained frome the S.C.S. method higher than the value obtained from the unit hydrograph developed from the actual data, this method contains a number of advantageous factors. The peak discharge value and the time of peak discharge can be claculated easity from the morphological characteristics of the watershed, and in S.C.S method co-ordinates of the unit hydrograph can be calculated easily from that of the dimensionless unit hydrograph. When the four currently used methods were evaluated with a typical unit hydrograph obtained from the actual data, the S.C.S method was show to be the best method in deriving a synthetic unit hydrograph for ungaged small watershed.

  • PDF

Derivation of Snyder's Synthetic Unit Hydrograph Using Fractal Dimension (프랙탈 차원을 이용한 스나이더 합성단위유량도 관계식 유도)

  • Go, Yeong-Chan
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.3
    • /
    • pp.291-300
    • /
    • 1999
  • The Snyder's synthetic unit hydrograph method is selected to apply the concept of the fractal dimension by stream order for the practicable rainfall-runoff generation, and fourth types of the Snyder's relation are derived from topographic and observed unit hydrograph data of twenty-nine basins. As a result of the analysis of twenty-nine basins and the verification of two basins, the Snyder's relation which considers the fractal dimension of the stream length and uses calculated unit hydrograph data shows the best result. The concept of the fractal dimension by stream order is applied to the Snyder's synthetic unit hydrograph method. The topographic factors, used in the Snyder's synthetic unit hydrograph method, which have a property of the stream length like $L_{ma}$ (mainstream length) and $L_{ca}$ (length along the mainstream to a point nearest the watershed centroid) were considered. In order to simplify the fractal property of stream length, it is supposed that $L_{ma}$ has not the fractal dimension and the stream length between $L_{ma}$ and ($L_{ma}\;-\;L_{ca}$) has the fractal dimension of 1.027. From the utilization of this supposition, a new Snyder's relation which consider the fractal dimension of the stream length occurred by the map scale used was finally suggested.

  • PDF

A Comparative Study of Unit Hydrograph Models for Flood Runoff Estimation for the Streamflow Stations in Namgang-Dam Watershed (남강댐유역 내 주요 하천관측지점의 홍수유출량 추정을 위한 단위도 모형 비교연구)

  • Kim, Sung-Min;Kim, Sung-Jae;Kim, Sang-Min
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.3
    • /
    • pp.65-74
    • /
    • 2012
  • In this study, three different unit hydrograph methods (NRCS, Snyder and Clark) in the HEC-HMS were compared to find better fit with the observed data in the Namgang-Dam watershed. The Sancheong, Shinan, and Changchon in Namgang-Dam watershed were selected as the study watersheds. The input data for HEC-HMS were calculated land use, digital elevation map, stream, and watershed map provided by WAter Management Information System (WAMIS). Sixty six storms from 2004 to 2011 were selected for model calibration and validation. Three unit hydrograph methods were compared with the observed data in terms of simulated runoff volume, and peak runoff for the selected storms. The results showed that the coefficient of determination ($R^2$) for the peak runoff was 0.8295~0.9999 and root mean square error (RMSE) was 0.029~0.086 mm/day for calibration stages. In the model validation, $R^2$ for the peak runoff was 0.9061~0.9916 and RMSE was 0.030~0.088 mm/day which were more accurate than calibrated data. Analysis of variance showed that there was no significant difference among the three unit hydrograph methods.

A Study on Hydrologic Analysis and Some Effects of Urbanization on Design Flow of Urban Storm Drainage Systems (1) (도시 하수도망의 수문학적인 평가와 설계확률유량의 점대화 성향에 관한 연구(제1보))

  • 강관원;서병하;윤용남
    • Water for future
    • /
    • v.14 no.4
    • /
    • pp.27-34
    • /
    • 1981
  • The design flow of the urban strom drainage systems has been assessed largely on a basis of empirical relations between rainfall and runoff, and the rational formula has been widely used for the cities in our country. In order to estimate it more accurately, the urban runoff simulation model based on the RRl method has been developed and applied to the sample basin in this study. The rainfall hyetograph of the design stromfor the design flow has been obtained by the determination of the total rainfall and the temporal distributions of that rainfall. The total rainfall has been assessed from the empirical formula of rainfall intensity and the temporal distribution of that rainfall determined on the basis of Huff's method from the historical rainfall data of the basin. The virtual inflow hydrograph to each inlet of the basin has been constructed by computing the series of discharges in each time increment, using design strom hyetograph and time-area diagram. The actual runoff hydrograph at the basin outlet has been computed from the virtual inflow hydrographs by developing a relations between discharge and storage for the watershed. The discharge data for verification of the simulated runoff hydrograph are not available in the sample basin and so the sensitivity analysis of the simulation model has not been possible. The peak discharge for the design of drainage systems has been estimated from the computed runoff hydrograph at the basin outlet and compared to thatl obtained form the rational formula.

  • PDF

A Stiudy on the Deveplopment of Algorithm for the Representative Unit Hydrograph of a Watershed as a Closed Linear System. (폐선형계로 본 유역대표 단위유량도의 유도를 위한 알고리즘의 개발에 관한 연구)

  • 김재한;이원환
    • Water for future
    • /
    • v.13 no.2
    • /
    • pp.35-47
    • /
    • 1980
  • An algorithm is developed to derive a representative I hr-unit hydrograph through an analysis of rainfall-runoff relations of a watershed as a closed system. For the base flow seperation of a flood hydrograph the multi-deflection method is proposed herein, which gace better results compared with those by the existing empirical methods. A modified $\Phi$index method is also proposed in this stidy to determine the time distribution rainfall excess of a rainstorm, which is essetially a modification of the commonly used $\Phi$index method of rainfall seperation. With the so-obtained rainfall excess hyetograph and the direct runoff hydrograph a trial and error computation of the ordinates of 1 hr-unit hydrograph was executed in such a manner that the synthesized flood hydrograph closely approximates the observed one, thus resulting a unit hydrograph of a piecewise exponential function type. To verify the validity of this study the 1 hr-unit hydrographs for the Imha and Dongchon in Nagdong River basin, and Yongdam in Geum River basin were derived by this algorithm, and the results were compared with those by the conventional synthetic unit hydrograph method and the Nakayasu method. Besides, the validity of this stiudy was also tested by comparing the observed hydrograph with the one computed by applying the unit hydrograph to a specific rainfall event. To generalize the result of this study a computer program, consisited of a main and three subprograns (for rainfall excess estimation, convolution summation, and sorting), is developed as a package, which is believed to be applicable to other watersheds for the similar purpose as those in this study.

  • PDF

A STUDY ON THE PARAMETER ESTIMATION OF SNYDER-TYPE SYNTHETIC UNIT-HYDROGRAPH DEVELOPMENT IN KUM RIVER BASIN

  • Jeong, Sang-man;Park, Seok-Chae;Lee, Joo-Heon
    • Water Engineering Research
    • /
    • v.2 no.4
    • /
    • pp.219-229
    • /
    • 2001
  • Synthetic unit hydrograph equations for rainfall run-off characteristics analysis and estimation of design flood have long and quite frequently been presented, the Snyder and SCS synthetic unit hydrograph. The major inputs to the Snyder and SCS synthetic unit hydrograph are lag time and peak coefficient. In this study, the methods for estimating lag time and peak coefficient for small watersheds proposed by Zhao and McEnroe(1999) were applied to the Kum river basin in Korea. We investigated lag times of relatively small watersheds in the Kum river basin in Korea. For this investigation the recent rainfall and stream flow data for 10 relatively small watersheds with drainage areas ranging from 134 to 902 square kilometers were gathered and used. 250 flood flow events were identified along the way, and the lag time for the flood events was determined by using the rainfall and stream flow data. Lag time is closely related with the basin characteristics of a given drainage area such as channel length, channel slope, and drainage area. A regression analysis was conducted to relate lag time to the watershed characteristics. The resulting regression model is as shown below: ※ see full text (equations) In the model, Tlag is the lag time in hours, Lc is the length of the main river in kilometers and Se is the equivalent channel slope of the main channel. The coefficient of determinations (r$^2$)expressed in the regression equation is 0.846. The peak coefficient is not correlated significantly with any of the watershed characteristics. We recommend a peak coefficient of 0.60 as input to the Snyder unit-hydrograph model for the ungauged Kum river watersheds

  • PDF

Development of Korean Geomorphological Unit Hydrograph for Mountain Basins (산악지역을 위한 한국형 지형수문단위도 개발)

  • Kim, Hong-Tae;Shin, Hyun-Suk
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.1
    • /
    • pp.75-92
    • /
    • 2009
  • The development of the method for flood runoff analysis representing Korean mountain basins have been one of big concerns for Korean hydrologists for several decades. Several traditional methods dealing with unit hydrograph have been restricted to be used in Korea basins, because of its drawbacks due to its originality from other countries and the uncertainties of control parameters as well as its linearity assumption between rainfall and runoff relationship. In this paper, several geomorphological similarity relationships for Korean mountain basins was developed by using the experimental data over 40 Korean basins. Then those were applied directly to geomorphological unit hydrograph theory to meet Korean geomorphological unit hydrograph. The developed method was applied to Andong Dam basin. The results show the applicability and simplicity of the developed Korean geomorphological unit hydrograph generally for Korean mountain basins in future. It might be needed for more validations and applications of this method over Korean regions.

Estimation of Synthetic Unit Hydrograph by Cluster Analysis Using Geomorphic Characteristics of Mid-size Watershed (지형학적 인자에 따라 군집화된 중소규모유역의 합성단위도법 제시)

  • Kim, Jin Gyeom;Kim, Jong min;Kang, Boosik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.439-449
    • /
    • 2016
  • The methodology of synthetic unit hydrograph using geomorphic characteristics was suggested. Six geomorphic components over 19 watersheds were used to estimate synthetic unit hydrograph and the test watersheds were classified into two groups on the basis of the area of $200km^2$. The regression formulas between standardized geomorphic characteristics for each group and peak quantities of specific streamflow and time of representative unit hydrograph were suggested and the Nash and the Clark unit hydrographs were derived. For verifying the derived unit hydrographs, the resulting hydrographs were compared with the ones using the existing Clark unit hydrographs based on the empirical parameter estimation for the 145 storm events during 2010 to 2011 for the additional six watersheds. The results showed the relatively higher performance over the existing synthetic unit hydrograph methods, which could be a contribution to the hydrologic estimation in ungauged watersheds.

A study on the derivation of Dimensionless Unit Hydrographs by the Linear model in the small watersheds (선형 Model에 의한 소류역에 있어서의 무차원 단위도 유도에 관한 연구)

  • 이순혁;한중석
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.23 no.3
    • /
    • pp.78-87
    • /
    • 1981
  • This study was attempted to get dimensionless unit hydrograph by linear model which can be used to the estimation of flood for the development of Agricultural water resources and laid emphasis on the application of dimensionless unit hydrographs for the ungaged watersheds by applying linear model. The results summarized through this study are as follows. 1.Peak discharge is found to be Qp= CAR (C =0. 895A-o.145) having high significance between peak discharge, Qp and effective rainfall, R within the range of small watershed area, 84 to 470km2. consequently, linearity was acknowledged between rainfall and runoff. Reasonability is confirmed for the derivation of dimensionless unit hydrograph by linear model. 2.Through mathematical analysis, formula for the derivation of dimensionless unit hydrograph was derived. qp--p=(tp--t)n-1[e-(n-1)](tp--t-1) 3.Moment method was used for the evaluation of storage constant, K and shape parameter, n for the derivation of dimensionless unit hydrograph. Storage constant, K is more closely related with the such watershed characteristics as length of main stream and slopes. On the other hand, the shape parameter, n was derived with such watershed characteristics as watershed area, river length, centroid distance of the basin and slopes. 4.Time to peak discharge, Tp could be expressed as Tp=1. 25 (√s/L)0.76 having a high significance. 5.Dimensionless unit hydrographs by linear model stood more closely to the observe dimensionless unit hydrographs On the contrary, dimensionless unit hydrographs by S.C. S. method has much difference in comparison with linear model at the falling limb of hydrographs. 6.Relative errors in the q/qp at the point of 0.8 and 1.2 for the dimensionles ratio by linear model and S. C. S. method showed to be 2.41, 1.57 and 4.0, 3.19 percent respectively to the q/qp of observed dimensionless unit hydrographs. 7.Derivation of dimensionless unit hydrograph by linear model can be accomplished by linking the two empirical formulars for storage constant, K, and shape parameter, n with derivation formular for dimensionless unit hydrograph for the ungaged small watersheds.

  • PDF