• Title/Summary/Keyword: hydroelectric

Search Result 120, Processing Time 0.028 seconds

Application on the Convergence Technology for Culture Festival Composition of Riverside Space (강변공간의 문화축제 조성을 위한 융복합 기술의 적용)

  • Yeon, Sang-ho
    • The Journal of the Convergence on Culture Technology
    • /
    • v.4 no.1
    • /
    • pp.253-261
    • /
    • 2018
  • Cheongpungho number is located in the center of South Korea Jecheon Peninsula, Chungju cheongpungho be formed by hydroelectric dam construction in 1984, now has been changed to a large man-made freshwater sites during the past 30 years. Recent Jecheon government is developing natural healing resort and entertainment performances for the future, in comparison to the feasibility study of the region using remote sensing technology and site planning was conducted in geographic research and analysis, and as a result, we have a very effective to incorporate the color maps using aerial photography and digital terrain analysis and usage analysis to prove and was in the riverside area for the future of the business and the research proposal facilities and events of the brand, to be more multi-cultural festival form apply new high-tech fusion experiments suggest new direction for future tourism.

Study on Leading-phase Operation Capability of a 770 MW Jumbo Hydro-generator based on Stability Analysis and End-Region Heat Analysis

  • Fan, Zhen-nan;Zhou, Zhi-ting;Li, Jian-fu;Wen, Kun;Wang, Jun;Sun, Zhang;Wang, Tao;Yao, Bing
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.3
    • /
    • pp.1317-1325
    • /
    • 2018
  • A generator-grid coupling calculation model is established to study the leading-phase operational capability of a 770 MW jumbo hydro-generator in a Chinese ultra-mega hydropower station. The static and dynamic stability of the generator are analyzed and calculated to obtain stability limits under leading-phase operating conditions. Three-dimensional (3D) time-varying nonlinear moving electromagnetic and temperature field models of the generator end-region are also established and used to determine the magnetic field, loss, and temperature of the end-region under the leading-phase operating condition. The simulation results agree with data measured from the actual 770 MW hydro-generator. This paper provides reliable reference data for the leading-phase operation of a jumbo hydro-generator, which will help to improve in the design and manufacture of future hydro-generators.

Noise Elimination Algorithm for Detecting Partial Discharge of Generator Stator Winding Considering Relation of Periphery Signals (고압 회전기 고정자 권선의 부분방전 계측 시 주변 신호 관계를 고려한 노이즈 제거기법)

  • Shin, Hee-Sang;Cho, Sung-Min;Kang, Chul;Kang, Dong-Sik;Cho, Kuk-Hee;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.9
    • /
    • pp.17-24
    • /
    • 2008
  • Recently, the importance of supplying the reliable electric power is increasing. therefore, the importance of diagnosis of power equipments is increasing also. Breaking insulation of stator windings is major cause of faults in high voltage generators. On-line PD (Partial Discharge) detection using Capacitive Coupler at stator windings is used widely to diagnose high voltage generator. However, precise PD(Partial Discharge) detection is impossible if detected signals are mixed with PD and noise signal. In this paper, we analyze detected signals using Capacitive Coupler at 13[kV] hydroelectric generator stator winding and suggest not hardware method but noise elimination algorithm for detecting PD of generator stator winding considering relation of periphery signals.

Rock Support Design of Bakun Tunnelling Project in Sarawak, Malaysia (바쿤 가배수로 터널의 최적지보설계)

  • 지왕률
    • Tunnel and Underground Space
    • /
    • v.8 no.4
    • /
    • pp.296-306
    • /
    • 1998
  • Ongoing huge Bakun Hydropower project is including the construction of a 210 m height hydroelectric rockfill dam with an installed capacity of 2,520 MW and a power transmission system connecting to the existing networks between Sarawak and peninsula Malaysia. In order to allow the main dam construction during the dry season, the Ballui river will have to be detoured through 3 concrete lined diversion tunnels with an internal diameter of 12 m and a length of 1,400 m each. The geology of Bakun site belongs to the several thousand meters thick Belaga formation deposited from the late Cteteceous to the early Teriary in the Northwest Borneo geosyncline. The orientation of the bedding plane, strike at N55$^{\circ}$E to N70$^{\circ}$E and dip at 50$^{\circ}$SE to 70$^{\circ}$SE, is developed uniformly in Bakun sedimentary rocks. Rock mechanical characteristics of Bakun site have been classified into 4 rock mass types(RMT) depending on the degree of weathering and the occurrence of rock jointing with RMR. Graywacke(Sandstone) as well as Shale can take place together in the same rock mass type if their rock mass properties are similar. It was summarized the rock support type and support system design of underground diversion tunnels in view of rock mechanics.

  • PDF

A Study on the Fire Safety Measure of Pumped Storage Power Plant (양수발전소의 화재안전 대책에 관한 연구)

  • Kim, Yoo-Shik
    • Fire Science and Engineering
    • /
    • v.20 no.4 s.64
    • /
    • pp.125-130
    • /
    • 2006
  • Pumped storage power plant is a system of generating electricity with hydroelectric power, in which at times of low electrical demand such as during nights, excess generation capacity of many power plants is used to pump water into the higher reservoir, and when there is higher demand, water is released back into the lower reservoir through a turbine, generating electricity. As pumped storage power plants across the nation are not on building registry under "the Article 6 of the Special Act by the Development of Power Resources", they are classified as a structure, not as a building. As a result, permit of fire protection facility is unnecessary, and fire protection administration is excluded from approval to completion of construction. Therefore, this study is to improve problems in accordance with the application of "he Article 6 of the Special Act by the Development of Power Resources", repair of facilities and problems with safety control to effectively prevent similar damages from repeatedly happening to pumped storage power plants in operation or under construction nationwide during a fire.

The Effect of STEAM Program for Hydroelectric Energy on Elementary Students' Energy Literacy and Creative Problem-solving (수력에너지에 관한 융합인재교육 프로그램이 초등학생의 에너지소양과 창의적 문제해결력에 미치는 영향)

  • Choi, Il-hoon;So, Keumhyun
    • Journal of Korean Elementary Science Education
    • /
    • v.40 no.4
    • /
    • pp.498-509
    • /
    • 2021
  • In this study, a convergence talent education program was developed and applied to elementary school students to investigate its effect on their energy literacy and creative problem-solving ability. Accordingly, a study was conducted on 29 sixth-grade elementary school students. The results of pre- and post-tests on energy literacy and creative problem-solving ability were analyzed. The results revealed that the convergence talent education program on hydraulic energy had a positive effect on the elementary school students' energy literacy as well as their creative problem-solving ability. Furthermore, after completing the hydro-energy convergence talent education program, the students' interest in energy and science increased and they wanted to connect such with their daily life. It appears that meaningful results were obtained through the convergence talent education program, specifically in the process of generating and utilizing hydraulic energy a plan was developed to allow students to solve problems in student-centered classes.

Study on blending radar and numerical rainfall prediction to improve hydroelectric dam inflow forecasts accuracy (발전용 댐 유입량 예측 정확도 향상을 위한 레이더와 수치예보 예측강우 병합기법 연구)

  • Seong Sim Yoon;Hongjoon Shin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.112-112
    • /
    • 2023
  • 발전용댐의 댐 유입량 예측 및 운영을 위해서 (주)한국수력원자력에서는 수자원통합 운영시스템(Water resources Integrated System, WIOS)을 운영 중에 있다. 해당 시스템에서는 댐 유입량을 예측하기 위해서 기상청 수치예보모델 중 하나인 국지예보모델(Local Data Assimilation and Prediction System, LDAPS)의 예측강우를 수문모형의 입력자료로 활용하고 있으며, 레이더 기반의 초단시간 강우예측 기법을 자체 개발 중에 있다. 기상청 국지예보모델은 강우의 on/off에 대한 정확도는 90%를 상회할 만큼 높으나 정량적인 강우량의 정확도는 매우 낮고, 레이더 기반의 초단시간 예측 강우는 선행 1~2시간 예측에서는 정량적 정확도는 높으나, 그 이후 예측성능이 급격히 떨어지는 경향을 보인다. 따라서 댐 유입량의 정량적 예측 정확도를 확보하기 위해 초단시간 모델과 국지예보모델의 강우예측 결과를 병합(blending)하는 기법을 적용하여 초기 6시간 동안의 예측 성능을 향상시켜야 한다. 본 연구에서는 선행시간 0~6시간에 대해서 병합하는 기법들을 적용하고 평가하고자 한다. 기본적으로 병합은 초단시간 예측강우와 수치예보자료 간 가중치를 통해 수행된다. 일반적으로 초기 1시간 선행시간에서 레이더 기반 예측강우는 완벽한 예측자료(외삽 관측자료의 가중치는 1.0)로 가정하며, tanh 함수를 이용하여 선행시간의 증가에 따라 가중치를 감소시키면서, 6시간 선행시간에서는 수치예보 예측강우가 완벽한 예측자료라고 가정한다. 본 연구에서는 일반적인 병합 방법 외에 병합된 예측강우에 과거 관측강우와 예측강우의 평균편이를 적용하여 보정하는 방법, 사례별 변동성이 큰 병합된 예측강우 특성을 고려하여 병합 가중치를 신뢰도에 따라 가변시키는 방법을 적용하여 평가한다. 이를 통해 댐 유입량 예측에 최적이 되는 병합기법을 선정하고자 한다.

  • PDF

Transverse variability of flow and sediment transport in estuaries with an estuarine dam

  • Steven Figueroa;Minwoo Son
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.125-125
    • /
    • 2023
  • Estuarine dams are dams constructed in estuaries for reasons such as securing freshwater resources, controlling water levels, and hydroelectric power generation. These estuarine dams alter the flow of freshwater to the coastal ocean and the tidal properties of the estuaries which has implications for the estuaries' circulation and sediment transport. A previous study has analyzed the effect of estuarine dams on 1D (along-channel) circulation and sediment transport. However, the effect of estuarine dams on the transverse variability of along-channel and across-channel circulation and sediment transport has not been studied and is not known. In this study, a coupled hydrodynamic-sediment dynamic numerical model (COAWST) was used to analyze the transverse variability of along-channel and across-channel flow and sediment transport in estuaries with estuarine dams. The estuarine dam was found to change the 3D structure of circulation and sediment transport, and the result was found to depend on the estuarine type (i.e., strongly stratified (SS) or well-mixed (WM) estuary). The SS estuary had inflow in the channel and outflow over the shoals, consistent with estuarine circulation. Longer discharge interval reduced the estuarine circulation. The WM estuary had inflow over the shoals and outflow in the channel, consistent with tide-induced circulation. As the estuarine dam was located nearer to the estuary mouth, the tide-induced circulation was reduced and replaced with estuarine circulation. The lateral circualtion was the greatest in the tide-dominated estuaries. It was reduced and changed direction due to differential advection change as the dam was located nearer the mouth. Overall, the WM estuary transverse flow structure changed the most. Lateral sediment flux was important in all estuaries, particularly for transporting sediments to the tidal flats.

  • PDF

Application of deep convolutional neural network for short-term precipitation forecasting using weather radar-based images

  • Le, Xuan-Hien;Jung, Sungho;Lee, Giha
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.136-136
    • /
    • 2021
  • In this study, a deep convolutional neural network (DCNN) model is proposed for short-term precipitation forecasting using weather radar-based images. The DCNN model is a combination of convolutional neural networks, autoencoder neural networks, and U-net architecture. The weather radar-based image data used here are retrieved from competition for rainfall forecasting in Korea (AI Contest for Rainfall Prediction of Hydroelectric Dam Using Public Data), organized by Dacon under the sponsorship of the Korean Water Resources Association in October 2020. This data is collected from rainy events during the rainy season (April - October) from 2010 to 2017. These images have undergone a preprocessing step to convert from weather radar data to grayscale image data before they are exploited for the competition. Accordingly, each of these gray images covers a spatial dimension of 120×120 pixels and has a corresponding temporal resolution of 10 minutes. Here, each pixel corresponds to a grid of size 4km×4km. The DCNN model is designed in this study to provide 10-minute predictive images in advance. Then, precipitation information can be obtained from these forecast images through empirical conversion formulas. Model performance is assessed by comparing the Score index, which is defined based on the ratio of MAE (mean absolute error) to CSI (critical success index) values. The competition results have demonstrated the impressive performance of the DCNN model, where the Score value is 0.530 compared to the best value from the competition of 0.500, ranking 16th out of 463 participating teams. This study's findings exhibit the potential of applying the DCNN model to short-term rainfall prediction using weather radar-based images. As a result, this model can be applied to other areas with different spatiotemporal resolutions.

  • PDF

Estimating optimal flood of the hydroelectric dams on the Bukhangang River (북한강 수계 수력발전댐의 최적설계홍수량 추정)

  • Kim, Sang Ug;Choi, Kwang Bae;Seo, Dong Il;Cheon, Young Il
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.286-286
    • /
    • 2022
  • 홍수피해를 최소화하기 위한 수공구조물의 적정 규모 결정을 위해 사용되는 홍수빈도분석에는 통계적 분석절차에 따른 불확실성이 포함된다. 따라서 불확실성이 포함된 범주 내에서 가장 적절한 설계홍수량(design flood)를 결정하는 과정은 수공구조물의 최종단계에서 중요하게 다루어져야 하는 부분이나 이를 제시한 연구는 많지 않다. 비용-편익 분석기법을 홍수빈도분석 절차에 도입하여 구성되는 총 기대비용함수(total expected cost function)는 설계홍수량 중 최적 설계홍수량(optimal design flood)를 결정하기 위한 새로운 접근방식이다. 이 절차는 UNCODE(UNcertainty COmpliant DEsign)로 명명되어 사용된 바 있으나, 국내에서는 아직 적용 결과가 소개되지 않고 있다. 따라서 본 연구에서는 UNCODE의 수학적 구성 절차를 소개함과 함께 북한강수계에 위치한 수력발전댐(화천댐, 춘천댐, 의암댐, 청평댐)의 년최대유입량을 사용하여 최적 설계홍수량을 산정하고 이 결과를 기존 홍수빈도분석 결과와 비교하였다. 불확실성이 고려된 총 기대비용함수로부터 확률분포함수들(Gumbel 및 GEV)의 모수를 추출하는 과정에서 Metropolis-Hastings 알고리즘을 사용하여 불확실성의 범위를 추정하였으며, 비용-편익 분석기법에 사용되는 비용 및 피해함수는 수학적 구성의 편의성을 위하여 1차 선형함수로 가정되었다. 4개의 발전용댐, 2개의 확률분포 및 2개의 재현기간에 대하여 최적 설계홍수량의 중앙값이 기존 홍수빈도분석 절차에 의해 산정된 설계홍수량보다 일정 정도 큰 값으로 산정됨을 알 수 있었다. 향후에는 본 연구에서 적용된 절차를 간단한 수식형태로 함수화하여 발전용댐 운영의 실무업무나 하천기본계획의 수립 등에 있어 비용-편익분석 기법의 적용성을 높이기 위한 연구가 진행될 필요가 있을 것으로 판단된다.

  • PDF