Analysis and Correction of Through-bolt End-region Overheating and Breakdown Failure in a Large Tubular Hydro-generator

  • Zhou, Zhi-ting;Fan, Zhen-nan;Li, Jian-fu;Wen, Kun;Zhang, Bide;Wang, Tao;Xia, Yan-kun;Sun, Zhang;Yao, Bing
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.6
    • /
    • pp.2292-2300
    • /
    • 2018
  • A field-circuit coupling model of a typical faulty generator is established to correct through-bolt end-region overheating and breakdown failure in a tubular hydro-generator. Using the model, eddy current loss and electromagnetic forces on through bolts under normal and failure conditions are analyzed and compared and the natural frequency of a through bolt is determined. Based on the analysis results, the causative mechanism of failure is revealed and targeted improvement design measures are proposed. The numerical results are found to be consistent with the actual fault characteristics, validating the design measure improvements. The results are useful in improving the design and manufacturing standards and enhancing the operational reliability of large tubular hydro-generators.

The Determination of Resolution on the Improved FBP Tomographic Algorithm (개선된 FBP 토모그라픽 알고리즘에서 분해능의 결정)

  • Koo, Kil-Mo;Hwang, Ki-Hwan;Park, Chi-Seong;Ko, Duck-Young
    • Journal of the Institute of Electronics Engineers of Korea TE
    • /
    • v.42 no.1
    • /
    • pp.21-28
    • /
    • 2005
  • In this paper, we studied resolution to the FBP(Filtered Back-Propagation) tomographic image reconstruction algorithms. In order to analyze the resolution to the tomographic images, we derived ambiguity function to this algorithm which can be reconstructed from the improved FBP image reconstruction algorithm by using fixed coordinate system practically. Through simulation using this function, we determined the lateral and depth resolution quantitively and then analyzed respectively. Simulation results show that the lateral and depth resolution to the improved FBP image reconstruction algerian was determined $0.27\lambda\;and\;0.70\lambda$ at the 3dB, and also $0.89\lambda\;and\;0.96\lambda$ at the 6dB respectively. This results proved that improved FBP reconstruction algorithms for diffraction tomography of incident planar wave is useful to developed the tomographic image system, analyze the resolution to the tomographic images, we derived ambiguity function to this algerian which can be reconstructed from the improved FBP image reconstruction algorithm by using fixed coordinate system.

Application on the Convergence Technology for Culture Festival Promotion of Riverside Space (강변공간의 문화축제 조성을 위한 융복합 기술의 활용)

  • Yeon, Sang-ho;Lee, Young-wook
    • The Journal of the Convergence on Culture Technology
    • /
    • v.1 no.4
    • /
    • pp.79-86
    • /
    • 2015
  • Cheongpungho and riversides are located in the center of South Korea Jecheon Peninsula, cheongpungho be formed by a chungju hydroelectric dam built in 1984 has now been changed as a freshwater lake created by the center of the South Han River upstream over the past 30 years. Recent Jecheon-sigovernment is developing the entertainment and natural healing resorts for the future, this research is using remote sensing techniques and field survey plan in comparison to the feasibility study of the cultural festival of the area was conducted in geographic research and analysis very effective to conduct the natural environment and terrain analysis by aerial photography and remote sensing techniques that can be proven integration and cultural content, in the riverside area of future business creation and tourism resources of the facilities and events in the new brand through research It was envisioned. As a result, we propose a new direction for the future of cultural tourism to participate in the new state-of-the-art digital imaging technology to traditional cultural content in fusion experiments to be more multi-cultural festival is formed.

Influence of the Francis Turbine location under vortex rope excitation on the Hydraulic System Stability

  • Alligne, S.;Nicolet, C.;Allenbach, P.;Kawkabani, B.;Simond, J.J.;Avellan, F.
    • International Journal of Fluid Machinery and Systems
    • /
    • v.2 no.4
    • /
    • pp.286-294
    • /
    • 2009
  • Hydroelectric power plants are known for their ability to cover variations of the consumption in electrical power networks. In order to follow this changing demand, hydraulic machines are subject to off-design operation. In that case, the swirling flow leaving the runner of a Francis turbine may act under given conditions as an excitation source for the whole hydraulic system. In high load operating conditions, vortex rope behaves as an internal energy source which leads to the self excitation of the system. The aim of this paper is to identify the influence of the full load excitation source location with respect to the eigenmodes shapes on the system stability. For this, a new eigenanalysis tool, based on eigenvalues and eigenvectors computation of the nonlinear set of differential equations in SIMSEN, has been developed. First the modal analysis method and linearization of the set of the nonlinear differential equations are fully described. Then, nonlinear hydro-acoustic models of hydraulic components based on electrical equivalent schemes are presented and linearized. Finally, a hydro-acoustic SIMSEN model of a simple hydraulic power plant, is used to apply the modal analysis and to show the influence of the turbine location on system stability. Through this case study, it brings out that modeling of the pipe viscoelastic damping is decisive to find out stability limits and unstable eigenfrequencies.

The method of securing water supply resources of existing dam by using Blue dam (Blue dam을 활용한 기존 댐 시설물 상수도 원수 추가 확보 방안)

  • Choo, Tai-Ho;Yoon, Hyeon-Cheol;Yun, Gwan-Seon;Kwon, Yong-Been;Shim, Su-Yong;Chae, Soo-Kwon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.2
    • /
    • pp.243-249
    • /
    • 2015
  • To improve stability of the water resources that were seriously affected by climate change and various environmental effects and to supply the clean water always, continuous efforts are essential. Provision of measures with respect of hardware is basically essential to improve the water resources stability due to the topographic characteristic in Korea. However, building a new dam becomes gradually very difficult because of a hardship in selecting right places, opposition forces such as environment and local residents, negative publicity for large civil engineering projects, and so on. The present study, therefore, proposes the Blue dam as an alternative for securing the water resources of a new concept considering domestic conditions. To evaluate the effect of the Blue dam, the Hec-ResSim model is used and the probabilistic discharge flow rate is applied. As a result, when Dam Yeongcheon is applied as a study area, securing water resources of 14 million tons are predicted be secured and the flood control of 15.4 million tons is expected, in comparison with operation of the existing dam only. Consequently, Blue dams are supposed to carry out the function of securing water resources, controling flood, maintaining eco-environmental instream flow, generating hydroelectric power, and providing spaces for recreational activities.

Design of the reinforced concrete lining in bakun diversion tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.20-26
    • /
    • 1999
  • The completion of the Bakun Diversion Tunnel is subsequently to the Main Dam construction. Therefore, the completion date is very important for the Bakun Hydroelectric Project. Generally, the tunnel lining work as a finishing phase of the tunnelling project occupies a important portion as well as an excavation and a support work of the tunnels in respect to the construction cost and period. Internal section of Bakun Diversion Tunnel is designed circular shape to reduce the roughness of the water flow with 12 meters in diameter of total length 4314.6 meters of 3 tunnels. The lining thickness is varied between 500 mm and 700 mm depending on the structural condition. From the original Tender design of the Bakun tunnels, the required quantity of steel bars was 5,985 ton designed by Reinforced Concrete (RC) through the entire tunnel linings. During the detail design stage by the consideration of the rock conditions and various load conditions, we could suggest five kinds of RC lining type including plain concrete lining type. Through the detail design modification, we could reduce the required amount of steel bars to 2,178 ton, as a half of original Bill of Quantity. Finally, this design modification give us the time and cost saving effect to catch up the construction progress in time.

  • PDF

Gate Operation Rule of Paldang Dam by Considering Discharge and Downstream Flow Pattern (방류량 및 하류부유황을 고려한 팔당댐의 수문조작기준 선정)

  • 서규우;이종설
    • Water for future
    • /
    • v.29 no.2
    • /
    • pp.209-219
    • /
    • 1996
  • The existing gate operation rule of Paldang hydroelectric plant has been used since the construction of the dam in 1973 except partial modification due to the construction of Chungju multipurpose dam in 1985. The water level near the downstream of Paldang dam has been lowered about 3 m because of the channel maintenance of Han River development project. Thus, the discharge estimation formula based on the submerged orifice type spillway has to be re-evaluated by considering various patterns of the gate operation rules and lowered channel bed. In this study, three types of gate openings were tested to select the proper gate operation rules through the hydraulic model test for various discharges and opening heights. Also, the numerical analysis has been performed to simulate the flow patterns of downstream. As a result, the gate operation rule, which opens 5 gates each time from the left side, was selected as the proper gate operation rule of Paldang dam.

  • PDF

Behaviors of Cavitation Damage in Seawater for HVOF Spray Coated Layer with WC-10Co4Cr on Cu Alloy (WC-10Co4Cr으로 초고속 화염용사 코팅된 Cu 합금의 해수내 캐비테이션 손상 거동)

  • Han, Min-Su;Kim, Min-Sung;Jang, Seok-Ki;Kim, Seong-Jong
    • Journal of the Korean institute of surface engineering
    • /
    • v.45 no.6
    • /
    • pp.264-271
    • /
    • 2012
  • Due to the good corrosion resistance and machinability, copper alloy is commonly employed for shipbuilding, hydroelectric power and tidal power industries. The Cu alloy, however, has poor durability, and the seawater application at fast flow condition becomes vulnerable to cavitation damage leading to economic loss and risking safety. The HVOF(High Velocity Oxygen Fuel) thermal spray coating with WC-10Co4Cr were therefore introduced as a replacement for chromium or ceramic to minimize the cavitation damage and secure durablility under high-velocity and high-pressure fluid flow. Cavitation test was conducted in seawater at $15^{\circ}C$ and $25^{\circ}C$ with an amplitude of $30{\mu}m$ on HVOF WC-10Co4Cr coatings produced by thermal spray. The cavitation at $15^{\circ}C$ and $25^{\circ}C$ exposed the substrate in 12.5 hours and in 10 hours, respectively. Starting from 5 hours of cavitation, the coating layer continued to show damage by higher than 160% over time when the temperature of seawater was elevated from $15^{\circ}C$ to $25^{\circ}C$. Under cavitation environment, although WC-10Co4Cr has good wear resistance and durability, increase in temperature may accelerate the damage rate of the coating layer mainly due to cavitation damage.

Effect of Hydroelectric Power Plant Discharge on the Turbidity Distribution in Dae-Cheong Dam Reservoir (발전방류구 위치변화에 따른 저수지내 탁수변화 -대청댐을 대상으로-)

  • Seo, Se-Deok;Lee, Jae-Yil;Ha, Sung-Ryong
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.2
    • /
    • pp.227-234
    • /
    • 2011
  • In the study, CE-QUAL-W2 was used and its examination and correction were conducted targeting 2001 and 2003 when the condition of rainfall was contradicted. Using the proved model in 2003, a scenario was implemented with management of locations for dewatering outlets and actual data for dam management in 1987 when inflow and outflow level were almost same. In case of the scenario which the location of dewatering outlets was 5m higher than usual location, exclusion efficiency for turbid water inflow at the beginning of precipitation was good. In case of the scenario which the location of dewatering outlets was 10m lower than usual location, exclusion efficiency for excluding turbid water remained in a reservoir after the end of precipitation. However, the scenario applying dam management data in 1987, exclusion efficiency was relatively low. In the scenario, power-generating water release spot at EL.57m for first four days after the beginning of precipitation, EL.52m for 5th to 8th and EL.42m from 9th days. An analysis of the scenario reveals that both excessive days exceeded 30 NTU and average turbidity levels were decreased comparing before and after the alteration on outlets. The average turbidity levels were decreased by minimum of 55% to maximum of 70% and 30NTU exceeding days were decreased by 45 days at maximum. Also, since it could exclude most of turbid water in a reservoir before the destatifcation, the risk for turbid water evenly distributed in a reservoir along with turn-over could be decreased as well.

Comparison of Water Supply Reliability by Dam Operation Methods (댐 운영방식에 따른 이수안전도의 비교)

  • Choi, Si Jung;Lee, Dong-Ryul;Moon, Jang Won
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.6
    • /
    • pp.523-536
    • /
    • 2014
  • A water supply reliability is mainly influenced by water demand, reservoir storage, and inflow change caused from drought. The water supply reliability can vary depending on the method of dam operation. In Korea, the deficit-supply method which complements water deficit as water shortage occurs in downstream areas has been used for the national water resources master plan using K-WEAP, but the prime flow method, an alternative approach, would show different results of water supply reliability in comparison to the deficit-supply method. The objective of this research is to compare and analyze differences in water supply reliability according to dam operation methods. These results can be used to re-evaluate water supply reliability of dam in a circumstance considering steady dam release for instreamflow in downstream and hydroelectric power generation.