• Title/Summary/Keyword: hydro-power turbine

Search Result 128, Processing Time 0.031 seconds

Development of an Integrated Management System for Maintenance Parameters and Rotary Machine of Hydro-power Plant (수력발전소 정비변수 및 회전체 통합관리 시스템 개발)

  • Shin, Sung-Hwan;Park, Jin-Ho;Yoon, Doo-Byung
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2012.04a
    • /
    • pp.263-269
    • /
    • 2012
  • Condition-based maintenance (CBM) has been used as a useful concept for optimizing maintenance plan and decreasing maintenance cost in several kinds of plant sites. This study introduced an example that developed an integrated management system for maintenance parameters and hydraulic turbine of hydro-power plant in order to improve its maintenance system as applying CBM techinique. The integrated management system consists of three parts. One is a hardware part including PDA inspection system and several kind of precision measuring instruments. Another is a vibration monitoring system on hydraulic turbine. The other is a software part that takes charge of making hierarchy tree of maintenance parameters and their inspection route, managing accumulated database, assessing health condition of components, and supporting interface with other enterprise management system. The system has been installed at Chuncheon Hydro-power plant for test and demonstration. It is expected that the system can contribute database construction for diagnostics and prognostics on facility health condition and systematic accumulation of know-how on operation and maintenance of plant.

  • PDF

Development of an Integrated Management System for Maintenance Parameters and Rotary Machine of Hydro-power Plant (수력발전소 정비변수 및 회전체 통합관리시스템 개발)

  • Shin, Sung-Hwan;Park, Jin-Ho;Yoon, Doo-Byung;Son, Ki-Sung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.22 no.6
    • /
    • pp.574-581
    • /
    • 2012
  • Condition-based maintenance(CBM) has been used as a useful concept for optimizing maintenance plan and decreasing maintenance cost in several kinds of plant sites. This study introduced an example that developed an integrated management system for maintenance parameters and hydraulic turbine of hydro-power plant in order to improve its maintenance strategy as applying CBM techinique. The integrated management system consists of three parts. One is a hardware part including PDA inspection system and several kind of precision measuring instruments. Another is a vibration monitoring system on hydraulic turbine. The other is a software part that takes charge of making hierarchy tree of maintenance parameters and their inspection route, managing accumulated database, assessing health condition of components, and supporting interface with other enterprise management system. The system has been installed at Chuncheon hydro-power plant for test and demonstration. It is expected that the system can contribute database construction for diagnostics and prognostics on facility health condition and systematic accumulation of know-how on operation and maintenance of plant.

An Investigation of Turbine Blade Ejection Frequency Considering Common Cause Failure in Nuclear Power Plants (공통원인고장을 고려한 원전 터빈블레이드 비산빈도계산)

  • Oh, Ji-Yong;Chi, Moon-Goo;Hwang, Seok-Won
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.36 no.4
    • /
    • pp.373-378
    • /
    • 2012
  • The objective of this research is to examine the probabilistic approach to evaluating turbine ejection frequency considering common-cause failure. This paper identifies basic turbine ejection mechanisms under high and low speeds and presents a detailed probabilistic methodology (fault tree) for assessing ejection frequency. The alpha factor methodology is applied to common-cause failure evaluations. The frequencies under different test schemes are compared and the propagation of uncertainty through the fault tree model is evaluated. The following conclusions were reached: (1) the turbine blade ejection frequency due to ductile failure under high speed is around 8.005E-7/yr; (2) if common-cause failure is considered, the frequency will be increased by 11% and 33% depending on the test scheme; and (3) if the parameter uncertainties are considered, the frequency is estimated to be in the range of 9.35E-7 to 1.13E 6, with 90% confidence.

Feasibility Study on the Construction of Small Hydro-Power Plants in Gumi Sewage Treatment Plant Discharge Point (구미하수처리장 방류구에서의 소수력발전 설치 및 운영에 관한 연구)

  • Nah, Dong-Hun;Lee, Seung-Hwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.2
    • /
    • pp.173-181
    • /
    • 2010
  • This study was conducted to investigate the possible installation of small hydro-power plant at the discharge point of Gumi sewage treatment plant (STP) using treated wastewater. Sufficient amount of water to transfer to electric power and the selection of proper location are two essential elements for the construction of small hydro-power facility. Preliminary analysis based on site visit and existing data in Gumi STP were made. Capacity of the small hydro-power plants and exact location were determined by geomorphological condition and flow duration characteristics. Flow duration characteristics and its duration curve were identified using monthly rainfall data in Gumi STP. Relevant facts of small hydro-power system in other STP were referred to adopt to Gumi STP situation. Flowrate of treated effluents and effective head between flow chamber and the location of hydraulic turbine in Gumi STP are found to be $3.70m^3$/sec and 3.5m respectively. Electric generation rate based on this feasibility study was estimated to be 86.3kW/h. Yearly electric generation rate was expected to be 932.4MMh. Proposed small hydro-power plant construction in Gumi STP is to be reasonable.

Performance Characteristics of Small Tubular-type Hydroturbine according to the Guide Vane Opening Angle by Experiment and CFD (실험 및 CFD에 의한 가이드베인 개도에 따른 소형 튜블러 수차의 성능특성)

  • Nam, Sang-Hyun;Kim, You-Taek;Choi, Young-Do;Lee, Young-Ho
    • The KSFM Journal of Fluid Machinery
    • /
    • v.11 no.5
    • /
    • pp.44-49
    • /
    • 2008
  • As the alternative energy, renewable energy should have been developing by many techniques, in order to substitute the fossil fuel which will be disappeared in the near future. One of the small hydropower generator, main concept of tubular turbine is based on using the different water pressure levels in pipe lines, energy which was initially wasted by using a reducing valve at the end of the pipeline, is collected by turbine in the hydro power generator. A propeller shaped hydro turbine has been used in order to use this renewable pressure energy in order to acquire basic design data of tubular type hydraulic turbine, output power, head, efficiency characteristics due to the guide vane opening angle are examined in detail. First, it ensures the reliance of CFD by that of compared with experiment data. After all, the results of performance characteristics of the CFD and experiment show to confirm the data that power, head and efficiency of less than 4%, 2% and 5% respectively. Moreover influences of pressure, tangential and axial velocity distributions on turbine performance are investigated.

Optimized Sealing Profile Design of Mechanical Face Seals for a Hydro-power Turbine (소수력 터빈용 기계평면시일의 최적형상설계에 관한 연구)

  • Kim, Chung-Kyun;Kim, Jung-Il;Sihn, Ihn-Cheol;Lim, Kwang-Hyeon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.499-502
    • /
    • 2006
  • This paper presents computed results of FEM analysis on the tribological contact behaviors of a primary sealing components of mechanical face seals for a small hydro-power turbine. The FEM computed results present that the contact area between seal rings and seal seats is very important for a good tribological performance such as low friction heating, low wear, high contact normal stress in a primary seal ing components. Based on the FEM computation, model III in which has a small sealing contact area shows low dilatation of primary sealing components, and high contact stress between a seal ring and a 1)seal seat.

  • PDF

Modeling and Simulation of Loss of Excitation of Hydro Generator Control System (수력 발전기 제어시스템의 계자상실 모델링과 시뮬레이션)

  • Park, Chul-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.2
    • /
    • pp.74-80
    • /
    • 2014
  • Generator protection device has to detects an internal fault conditions in generator and abnormal operating conditions must be due to the hazards. Loss of excitation may cause generator itself failure as well as serious operating problem in power system, and then requires an appropriate response of generator protection device. Details modeling of generator control system and analysis of transient states in generator are important for optimal operation in power plants. In addition, the fault simulation data are also used for testing the characteristics of IED. In this paper, the hydro generator control system using PSCAD/EMTDC, visual simulation for power systems, was modeled. The generator control system which is composed of generator, turbine, exciter, governor was implemented. The parameters of generator control system model were obtained from field power plant. Loss of excitation simulations were performed while varying the fixed load. Several signals analysis were also performed so as to analyze transients phenomena.

Structural Safety Evaluation by Analysis of Pressure Variation Characteristics of Small Hydro Power Hydraulic Turbine Blades in Sewage Treatment Plant (하수처리장 소수력 수차 블레이드의 압력변화 특성 분석을 통한 구조안전성 평가)

  • Park, Yoo-Sin;Kim, Ki-Jung;Youn, Byong-Don
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.6
    • /
    • pp.126-131
    • /
    • 2017
  • Numerical analysis using commercial CFD code was carried out to develop the drag force type vertical axis hydraulic turbine for the improvement of the production efficiency of small hydro energy at low flow velocity condition. Blade pressure changes and internal flows were analyzed according to the presence or absence of the hydraulic turbine blade holes at flow velocity of less than 1.0~3.0 m/s. According to the numerical results, the pressure and flow velocity is severly affected by the flow velocity in turbine blade with no holes, while the influence of flow velocity is comparatively decreased in turbine blade with holes. It is also found that the pressure and flow velocity on the blade surface with holes are evenly distributed with no singular location and it is believed that forming a hole in the blade may be helpful in terms of structural safety.

A Study on the Microcomputer-based PID Governor for Small Hydro Power Plant (마이크로 컴퓨터를 이용한 소수력발전소 PID 조속기에 관한 연구)

  • 신동렬;이규현;이원용
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.36 no.7
    • /
    • pp.492-500
    • /
    • 1987
  • Microcomputer-based PID governor which can be provided either stability or rapid response for small hydro power plant at low cost is developed and adapted to the 5 KW model hydro power for the performance test. The effects of PID gains on stability boundaries of the hydraulic turbine generating system is investigated. For the optimum selection of the PID gains, general equations are derived on the base of the experiments. This control system has a good performance at the model of hydro power plant. For the prediction of the control system, a mathematical model was developed and the results of the simulation using this model was matched with the experimental results.

  • PDF

Digital controller for turbine simulator (터빈 시뮬레이터용 수치제어기에 관한 연구)

  • Kim, Seog-Hwan;Hahn, Song-Yop
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.29-32
    • /
    • 1987
  • Hydro turbine, steam turbine and their generators can be described by one general model. To realize the turbine simulator, personal computer, D.C. motor and three phase thyristor converter have been used. In the experiments for the improvement of power system stability, that is, steady state, dynamic and transient stability, the characteristics of turbine simulator proposed by this paper have shown that of real prime mover.

  • PDF