• 제목/요약/키워드: hydro energy

검색결과 486건 처리시간 0.029초

자연에너지를 이용한 소수력 출력증대 방안 연구 (A Study on Output Increase of Small Hypro Power using Nature Energy)

  • 채지석;윤이수;김태호;김영일;마범구;최장규
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.1129-1130
    • /
    • 2011
  • The output of small hydro power plant was generated less than rated output under high temperature. We Installed the artificial ventilation that blow cold wind from water supply pipe tunnel to small hydro power plant. The temperature of small hydro power has been decreased. The output of small hydro power plant has been increased from 405kW to 445kW.

  • PDF

Hydro-Reactive 엔진의 산화제 분사각도에 따른 연소특성에 대한 연구 (Effects of Oxidizer Inject Angle on Combustion Characteristics in Hydro-Reactive Engine)

  • 원종한;이성남;백승욱;황창환;김경무
    • 한국연소학회지
    • /
    • 제19권2호
    • /
    • pp.1-7
    • /
    • 2014
  • In this study, the variation of the flow field in Hydro-reactive engine combustor was numerically studied through 2-dimensional axisymmetric model with aluminum and heated water vapor. For calculating all velocity fields, compressible Navier-Stokes equation was used with Pre-conditioning. AUSM+up(p) method was used to exactly calculate mass flow in the control volume. As using SST model that is a turbulent model, the result had high accuracy for free stream and the flow near the wall. The effects of the temperature, variation of the flow field and distribution of chemical products on inject angle of heated water vapor were studied.

부유식 풍력발전 해석 프로그램 WindHydro 특성 연구 (A Study on the Characteristics of WindHydro - a Floating Wind Turbine Simulation Code)

  • 송진섭;임채환;이성균
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 추계학술대회 초록집
    • /
    • pp.37.1-37.1
    • /
    • 2011
  • A floating wind turbine dynamic simulation program, 'WindHydro', is newly developed. In order to investigate the characteristics of the program, a series of loading cases are simulated such as (1) wind only case, (2) free decay cases with initial displacement, (3) wave only case (4) wind and wave case. The simulations are carried out for the 5-MW OC3-Hywind model which has a spar buoy and catenary mooring lines. As a result, the reliability of WindHydro is verified in most viewpoints although additional study is still necessary to clear out some uncertainty of the program.

  • PDF

에너지제약을 갖는 발전기의 운전을 고려한 기동정지계획에 관한 연구 (Unit Commitment Considering Operation of Energy Constrained Units)

  • 송길영;이범;김용하
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.117-119
    • /
    • 1993
  • This paper presents a new method for solving unit commitment problem including hydro and pumped storage hydro units in a large scale power system. The proposed method makes it possible to get variable power of hydro and pumped storage hydro units and results in the better unit commitment with good convergency. Moreover this paper proposes an unit commitment algorithm to consider variable power of these units effectively by Lagrangian Relaxation method. By applying the proposed method to the test system, it is verified the usefulness of this method.

  • PDF

신재생에너지 발전(태양광, 풍력, 소수력, 바이오가스)의 경제성 분석 연구 (A study on economic analysis of new renewable energy power(photovoltaic, wind power, small hydro, biogas))

  • 김종민;김기영
    • 한국태양에너지학회 논문집
    • /
    • 제28권6호
    • /
    • pp.70-77
    • /
    • 2008
  • The purpose of this study evaluates a feasibility and economical efficiency of new renewable energy. According as weather change is serious problem now days, every people make attention to the reduction of greenhouse gas. The revitalization of new renewable energy creates the variety of energy source, stability of energy supply and reduction of greenhouse gas. In this study evaluates a feasibility and economical efficiency from new renewable energy of various photo voltaics, wind power, small hydro and biogas. Feasibility does in standard of technical characteristic, politic support, marketability, establishment present condition and development aim. Economical efficiency does in standard of developmental unit cost, utilization factor, equipment life, politic support cost, interest ratio. The results of this study were as follows photo voltaics, wind, small hydropower, biogas in order feasibility is high. Developmental unit cost, utilization factor, equipment life, politic support cost and analyzed the relationship of interest ratio fluctuation and economical efficiency. From all new renewable energy the utilization factor most is important in economical efficiency but necessary utilization factor is difficult because environmental problem.

마이크로웨이브-질산용출과자력/수력선별에의한자연금및자철석의선별효과 (The Selection Effect of Native Gold and Magnetite by Microwave-nitric Acid Leaching and Magnetic/hydro Separation)

  • 이종주;박천영
    • 자원환경지질
    • /
    • 제53권2호
    • /
    • pp.183-196
    • /
    • 2020
  • 본 연구는 마이크로웨이브-질산용출과 자력/수력선별을 이용하여 정광으로부터 자연 금을 회수하는 것을 목표로 하였다. 마이크로웨이브-질산용출실험을 통해 용출용액으로부터 불용성-잔류물을 여과하였다. 용출용액을 원자흡수분광기(AAS)로 분석한 결과 Au는 전혀 용출되지 않은 것을 그리고 불용성-잔류물을 후방산란전자영상(BSE)으로 관찰한 결과 자연 금이 단체분리된 것으로 확인되었다. 불용성-잔류물을 자력/수력선별 하여 자성광물과 비-자성광물로 선별하였다. 자성광물에서 자철석이 회수되었고, 비-자성광물을 다시 수력선별한 결과 자연 금이 회수되었다. 자연 금은 X선 회절 분석(XRD)과 BSE 영상에서 확인되었다.

유입량변화에 의한 소수력발전소의 수문학적 성능특성 변화 (Hydrologic Performance Characteristics Variation of Small Scale Hydro Power Plant with Variation of Inflow)

  • 박완순;이철형
    • 한국수자원학회논문집
    • /
    • 제43권4호
    • /
    • pp.393-398
    • /
    • 2010
  • 하천의 유입량 변화와 이로 인한 소수력발전소의 수문학적 성능변화에 대한 연구가 수행되었다. 하천에서의 유입량변화를 분석하기 위하여 유량지속특성을 예측할 수 있는 모델이 개발되었고, 이를 기반으로 하여 소수력발전소의 수문학적 성능특성을 예측할 수 있는 모델이 개발되었다. 개발된 모델의 효용성을 확인하기 위하여 안동댐에서 32년간 측정된 월유입량자료를 분석하였으며, 안동댐 상류에 위치한 소수력발전소를 대상으로 하여 수문학적 성능특성을 분석하였다. 안동댐에서의 장기유입량과 기존의 소수력발전소를 대상으로 분석한 결과, 본 연구에서 개발된 예측모델로부터 획득한 결과가 실측자료와 잘 일치하였다. 최근 유입량증가로 인하여 소수력가용량을 증가하였으나 기존의 소수력발전소의 가동률을 증가시키지는 못한 것으로 나타났다. 본 연구에서 개발된 모델은 소수력발전소의 초기설계제원과 유입량을 예측하는데 유용하게 사용될 수 있다는 것이 밝혀졌다.

APR1400 안전관련계통 정비효과감시 프로그램 개발 (Development of Maintenance Effectiveness Monitoring Program for APR1400 Safety Related Systems)

  • 염동운;현진우;송태영
    • 에너지공학
    • /
    • 제23권2호
    • /
    • pp.191-198
    • /
    • 2014
  • 국내 가동중 원전은 발전소 안전성 및 신뢰성을 향상시킬 목적으로 정비효과감시 프로그램(정비규정)을 개발하여 2009년부터 이행 중에 있다. 정비효과감시 프로그램은 발전소 전 계통을 기능단위로 분류한 후 관리대상 선정, 안전중요도 결정 및 성능기준 수립을 통해 발전설비의 정비효과를 감시하는 프로그램이며, NUMARC 93-01 방법론을 기반으로 발전소별 고유 설계특성을 반영하여 개발하고 있다. 최근 건설 중인 APR1400형 원전도 운영초기 단계부터 정비체계 정착을 목적으로 안전관련계통 정비효과감시 프로그램을 개발하였으며, 향후 초기 성능평가를 통해 프로그램의 적합성을 검증할 예정이다. 결과적으로 고유 설계특성을 반영하여 개발한 정비효과감시 프로그램의 이행을 통해 APR1400형 원전의 안전성 및 신뢰성이 향상될 것으로 기대된다.