• 제목/요약/키워드: hot weather concrete

검색결과 55건 처리시간 0.024초

Effect of Mixing and Placing in Hot Weather on Hardened Concrete Properties

  • Ham, Suyun;Oh, Taekeun
    • International Journal of Concrete Structures and Materials
    • /
    • 제7권2호
    • /
    • pp.165-174
    • /
    • 2013
  • Portland cement concrete exposed to high temperatures during mixing, transporting, casting, finishing, and curing can develop undesirable characteristics. Applicable requirements for such the hot weather concrete differ from country to country and government agencies. The current study is an attempt at evaluating the hardened properties of the concrete exposed to hot weather in fresh state. First of all, this study reviews the current state of understanding and practice for hot weather concrete placement in US and then roadway sites with suspected hot weather concrete problems were investigated. Core samples were obtained from the field locations and were analyzed by standard resonance frequency analysis and the boil test. Based on the results, there does not appear to be systematic evidence of frequent cracking problems related to high temperature placement. Thus, the suspicious deteriorations which are referable to hot weather concreting would be due to other factors.

서중(暑中) 환경에서 현장 콘크리트 시험을 통한 재료 품질관리 방안 (A Study on Concrete Material Quality Management Based on Various Test of Construction Condition under Hot Weather Circumstance)

  • 박신
    • 한국건축시공학회지
    • /
    • 제5권3호
    • /
    • pp.91-99
    • /
    • 2005
  • It is required to study systematical on the concrete quality management to extend structure life because rebuilding effect is reducing under present condition of large sized and high stories structure. Concrete, which shows its intensity by hydrating action and a big change in quality according to hot weather and temperature, produces a lot of qualify problem under hot and cold weather Because of each specification and construction plan which does not have basic standard on site, concrete's quality is irregular and makes some defect. As a result, Daegu is turned out to be the longest area after investigating application period and days focused on 8 cities weather information about relationship between hot weather circumstance and construction environment. Therefore, we first surveyed the concrete material in the region and found out the problem of quality nanagement. Then figure out the way of solution. Moreover, we integrated concrete material quality management, which is applied differently to each site, to have equal quality and to reduce defect from construction site. And then, based on various test of construction condition and analysis of quality management item, we suggest effective concrete quality management to make concrete material construction standard guide and plan under hot weather.

경년변화에 따른 우리나라 서중 콘크리트 적용기간의 변천 (Variation of the Period of Hot Weather Concrete with Elapse of Age in Korea)

  • 최성용;홍석민;이충섭;김성일;한민철;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.53-56
    • /
    • 2008
  • This paper is to investigate the change of the period of hot weather concrete with elapse of age based on climate data. Climate data for 30 years and 5 years are used respectively. Determination of the period of hot weather concreting on architectural execution in Korea according to the specifications of AIJ, KSCE, and ACI are discussed. According to the research, the period of hot weather concreting with each specification in most regions lasts over 35 days. Compared with the period of cold weather concreting in hillside and inland area, coastal areas have shorter period in the same latitude. The period of hot weather concreting tends to decrease with high latitude. As expected, with the elapse of age, the period of hot weather concrete exhibited to decrease, especially, big city like Seoul, Busan etc had remarkably increased period by as much as a week. This is due to the global warming and industrialization effect with the elapse of age.

  • PDF

표면 양생시트 조합에 의한 서중콘크리트 표면온도 이력 비교 (Comparison of Temperature History of Concrete with the Combination of the Various Surface Curing Sheets at Hot Weather Condition)

  • 이주석;김종백;김종;한민철;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 추계 학술논문 발표대회 논문집
    • /
    • pp.87-90
    • /
    • 2006
  • This study investigates the temperature history of slab mock-up specimens for hot weather concreting applying various surface insulating methods, in order to improve concrete quality at hot weather condition. Test showed that the use of insulating blanket or a bubble sheet on upper section of slab prevented from abrupt increase of temperature and vaporization of moisture during early curing at hot weather circumstance. In addition, it secured higher strength at early age. Therefore it is concluded that concrete construction insulating with the bubble sheet will reduce the plastic and drying shrinkage as well as improve strength at early age, thus securing concrete duality.

  • PDF

플라이애쉬를 다량 치환한 콘크리트의 초기강도성상에 관한 실험적 연구 (The Experimental Study on Early Strength Properties of High Volume Fly-Ash Concrete)

  • 이동하;김상미;강태경;백민수;이영도;정상진
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.281-286
    • /
    • 2002
  • To study of binder and fine aggregate a lot of replacement fly-ash concrete, initial characteristics, standard environment of curing temperature $20^{\circ}C$, hot-weather environment of curing temperature $35^{\circ}C$, . Flesh concrete tested slump. air contest and Hardening concrete valuated setting period of form, day of age 1, 3, 5. 7, 10, 28 compression strength in sealing curing. Purpose of study is consultation materials in field that variety of fly-ash replacement concrete mix proportion comparison and valuation. (1) Experiment result age 28day compression strength more higher plan concrete then standard environment in curing temperature $20^{\circ}C$, , most strength F43 is hot-weather environment in curing temperature $35^{\circ}C$, replacement binder 25%, fine aggregate 15%. (2) Hot-weather environment replacement a mount of fly-ash is a same of plan concrete setting period of form. Age 28day compression strength replacement a mount of fly-ash more hot-weather concrete then plan concrete.

  • PDF

서중환경에서 표면피복 양생재 종류변화가 콘크리트의 초기 온도이력 및 균열발생에 미치는 영향에 관한 현장적용성 평가 (Field Application to Evaluate the Effect of Various Surface Covered Curing Blankets on Temperature Profile and Crack Occurrence of the Concrete under Hot Weather Condition)

  • 한민철;이상운
    • 대한건축학회논문집:구조계
    • /
    • 제34권5호
    • /
    • pp.27-34
    • /
    • 2018
  • Concrete placed under hot weather condition suffers from larger slump loss, rapid moisture evaporation due to high air temperature. Proper measures for material, transportation and curing should be taken to prevent the quality deterioration of the concrete under hot weather condition. In Korea, Although the period of hot weather concrete in Korea occupies only 2 months, there are a lot of quality problems including plastic, drying shrinkage and cold joint. Therefore, the objective of this paper is to investigate and compare the temperature history and crack occurrence of the concrete, which was placed in the actual apartment house construction field under hot weather condition, in response to the application of surface covered curing blankets including PE film, single layer clear bubble sheet, white colored bubble sheet and aluminum metalized bubble sheet. Test results indicated that the application of white colored bubble sheet and aluminum metalized bubble sheet showed most favorable results in terms of reduction in temperature rise and crack occurrence as well as easiness in handling. But, due to light reflection by aluminum metalized bubble sheet, it is believed that white colored bubble sheet is preferable.

표면개량 버블시트 종류 변화가 서중환경 콘크리트의 온도 및 균열발생에 미치는 영향 (Effect of the Kind of Modified Bubble Sheets on the Temperature Profiles and Crack Reduction of the Concrete under Hot Weather)

  • 이상운;한민철
    • 한국건축시공학회지
    • /
    • 제18권3호
    • /
    • pp.251-257
    • /
    • 2018
  • 여름철 콘크리트는 수분증발에 의한 소성 및 건조수축균열, 슬럼프 저하, 콜드조인트 발생 등 다양한 문제가 발생한다. 이에 국내에서는 수분증발을 방지하고, 단열성능을 확보하기 위해 표면피복 양생을 위한 다양한 형태의 버블시트를 제작하여 사용하고 있으나, 여름철에는 적용사례가 없었다. 따라서 본 연구에서는 여름철 시공중인 아파트 현장에 1중의 투명, 백색 및 알루미늄 증착 버블시트와 PE필름 및 표면노출의 5가지 표면피복 양생재를 적용하여 콘크리트의 온도 및 균열특성 등 품질에 미치는 영향을 분석하였다. 실험결과 알루미늄 증착 버블시트가 온도저감, 균열저감 면에서 가장 뛰어난 것으로 나타났지만, 알루미늄 재질의 특성상 빛이 반사되어 시공자의 눈부심에 따른 시각공해가 발생하기 때문에 백색 버블시트의 사용이 가장 효과적인 것으로 밝혀졌다.

플라이애시를 다량 사용한 콘크리트의 강도특성에 관한 연구 (The Study on the Strength Properties of High Volume Fly-Ash Concrete)

  • 백민수;이영도;정상진
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.169-176
    • /
    • 2002
  • To study of binder and fine aggregate a lot of replacement fly-ash concrete, initial characteristics, standard environment of curing temperature $20^{\circ}C$, hot-weather environment, cold weather environment of curing temperature $5^{\circ}C$. Flash concrete tested slump, air contest, setting and Hardening concrete valuated setting period of form, day of age 3, 7, 28 compression strength in sealing curing. Underwater curing specimen compression strength of age 3. 7, 28day used strength change accordingly fly-ash concrete curing temperature. Purpose of study is consultation materials in field that variety of fly-ash replacement concrete mix proportion comparison and valuation. (1) Setting test result, fly-ash ratio of replacement higher delay totting time. Same volume of fly-ash ratio of replacement is lower fly-ash ratio of replacement fine aggregate delay setting time. Setting test in curing temperature $35^{\circ}C$ over twice fast setting in curing temperature $20^{\circ}C$ and all specimen setting delay in curing temperature $5^{\circ}C$. F40 specimen end of setting about 30 time. (2) Experiment result age 28day compression strength more fisher plan concrete then standard environment in curing temperature $20^{\circ}C$, cold weather environment in curing temperature $5^{\circ}C$, most strength F43 is hot-weather environment in curing temperature $35^{\circ}C$ replacement binder 25%, fine aggregate 15%. (3) Hot-weather environment replacement a mount of fly-ash is a same of plan concrete setting period of form. Age 28day compression strength replacement a mount of fly-ash more hot-weather concrete then plan concrete.