• Title/Summary/Keyword: hospital buildings

Search Result 103, Processing Time 0.023 seconds

Prevention of Human injury and Countermeasure of evacuation about Fire of Nursing Homes by Conversion of existing buildings - Focused on rural areas in Gwangju and Jeonnam - (기존 건축물을 용도변경한 노인의료복지시설의 화재 인명피해 예방과 피난 대책 -광주·전남 농촌지역을 중심으로-)

  • Kim, Hyun-Tae;Kim, Won-Jin
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.20 no.1
    • /
    • pp.27-36
    • /
    • 2018
  • At present, the elderly population in Korea is 14% of the total population and then We has entered an the society of advanced age. Along with this, elderly people with dementia and palsy are also increasing. The demand for elderly nursing homes for elderly people with severe diseases such as dementia and stroke is also increasing, and the existing buildings are being secured by Conversion of existing buildings. However, it is difficult to evacuate and fire due to the out of date of buildings by Conversion of existing buildings. For example, there is a fire in the Indukukwon, Pohang City and Hyosung Geriatric Hospital, Jangseong in Korea, which have changed the use of existing buildings. Many elderly people died in a night fire. It was because of the sandwich panel walls and PVC flooring material produced toxic gas instantly. In this study, we investigated the nursing home that changing the use and established fire prevention of human injury and countermeasure of evacuation. First, the sandwich panels which leading to deaths due to the toxic gas were installed in most nursing home. We recommend the RC, the masonry wall, and the glass fiber panel instead of the sandwich panels, In addition, the PVC flooring is most used in nursing home, the flooring material is considered such as the building stones, the tile, and the yellow soil closing instead of the PVC flooring. Second, we investigated the installation status of fire fighting equipment. As a result, the automatic-emergency open&shut equipment, the smoke ventilator and the evacuation slide were rarely installed. In order to secure the golden time in case of fire and to prevent the asphyxia caused by the toxic gas, the law should be amended to install the equipment.

A Study on Load Characteristics for Hospital, Hotel and Department (전력다소비 건축물의 부하 사용특성 분석)

  • Kim, Se-Dong;Choi, Do-Hyuk;Ryu, Seung-Gi;Moon, Hak-Ryong
    • Proceedings of the KIEE Conference
    • /
    • 1997.07a
    • /
    • pp.247-249
    • /
    • 1997
  • This paper shows a load characteristics for hospital, hotel and department, that was made by the systematic and statistical way considering actual conditions, such as investigated electric equipment capacity, electric power consumption, load characteristics, etc for 58 buildings.

  • PDF

A Case Study on Extension Design of Seoul National University Bundang Hospital (분당 서울대학교병원 증축 설계 사례 연구)

  • Pak, Sungsine;Moon, Changho
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.16 no.3
    • /
    • pp.27-36
    • /
    • 2010
  • Recently general hospitals in Korea have been actively remodeled. Remodeling is required to extend the hospitals' area and to meet the new medical demand. Eventually it aims for achieving ideal healing environment. Seoul National University Bundang Hospital has also developed the schematic design to open the new hospital in 2012. This large scale of extension is the first step in its expected remodeling cycle. It is essential for the extension of hospital to create an architectural system on the basis of function, and to keep the balance with both the existing buildings and natural context simultaneously. To connect the existing hospital and the new hospital, a hospital street should be designed to make it function as a main pedestrian spine. Space design marketing of general hospital is effective in promoting the hospital image. It can be realized by emphasizing hospital identity through combining cultural program and commercial facilities. Developing hospital design should be encouraged under the EBD (Evidence Based Design) concept spread in USA.

A Study on Estimation of Cooling Load for Effective Control of Ice Thermal Storage System (빙축열 시스템의 효율적인 제어를 위한 냉방부하 예측에 관한 연구)

  • Yoo, Seong-Yeon;Han, Kyu-Hyun;Lee, Je-Myo;Han, Seung-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.2
    • /
    • pp.128-136
    • /
    • 2008
  • It is necessary to estimate the cooling load of the next day for effective control of ice thermal storage system. In this paper, new methodology is proposed to estimate the cooling load using design parameters of building and predicted weather data. Only six input parameters such as sensible heat coefficient and constant, latent heat coefficient and constant, maximum and minimum temperature are necessary to obtain hourly distribution of cooling load for the next day. Two benchmarking buildings(hospital and research institute) are selected to validate the performance of the proposed method, and the estimated cooling loads in hourly and daily bases are calculated and compared with the measured data for E hospital. The estimated results show fairly good agreement with the measured data for both buildings.

A Study on the Remodeling Construction Execution Strategy of General Hospitals in Korea (국내 종합병원의 리모델링 공사수행전략에 관한 연구)

  • Kim, Ha-Jin;Yang, Nae-Won
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.11 no.1
    • /
    • pp.33-41
    • /
    • 2005
  • The construction can proceed in different ways according to the acquired profitability of the hospital during the construction and to the features of departments or areas. This study is an analysis of remodeling construction processes to resolve major tasks of remodeling. The remodeling strategies gained from this study can be summed up as follows: 1) Remodeling work in hospitals involves the acquire relocation of space through extensive area renovations and then moving back to the space, and lastly working on the empty space. Thus, it is more advantageous in terms of construction work to demolish the existing buildings than to acquire the relocation space through extensions or renovations. That is, demolition after the maximum utilization of the existing buildings is the most desirable in terms of space availability. 2) The construction methods for remodeling are two: a method of carrying out construction by dividing the plane areas into several individual ones and of working on it floor by floor. In case of ward areas, and the outpatient area, the construction proceeds after securing the relocation space and partially setting construction areas in order to minimize the decrease in profitability due to the smaller number of beds and treatment rooms during construction. If the outpatient diagnosis/ treatment area and the supply area relocate together with the ward areas, there may be extra expenses. Thus, doing construction by area, while partially operating those areas or after relocating the whole areas.

  • PDF

Comparing the dynamic behavior of a hospital-type structure with fixed and isolated base

  • Nasery, Mohammad Manzoor;Ergun, Mustafa;Ates, Sevket;Husem, Metin
    • Earthquakes and Structures
    • /
    • v.9 no.3
    • /
    • pp.657-671
    • /
    • 2015
  • The level of ductility is determined by depending on the intended use of the building, the region's seismic characteristics and the type of structural system when buildings are planned by engineers. Major portion of seismic energy is intended to be consumed in the plastic zone in structural systems of high ductility, so the occurrence of damages in load bearing and non-load bearing structural elements is accepted in planning stage under severe earthquakes. However, these damages must be limited among specific values in order not to endanger buildings in terms of the bearing capacity. Isolators placed between the basement and upper structure make buildings behave elastically by reducing the effects of seismic loads and improving seismic performance of building significantly. Thus, damages can be limited among desired values. In this study, the effectiveness of seismic isolation is investigated on both fixed based and seismic isolated models of a hospital building with high ductility level with regard to lateral displacements, internal forces, structural periods and cost of the building. Layered rubber bearings are interposed between the base of the structure and foundation. Earthquake analysis of the building are performed using earthquake records in time domain (Kocaeli, Loma Prieta and Landers). Results obtained from three-dimensional finite element models are presented by graphs and tables in detail. That seismic isolation reduces significantly the destructive effects of earthquakes on structures is seen from the results obtained by seismic analysis.

A Study on the Remodeling Strategy for the Equipment Intensive Areas of General Hospitals - Focused on the Diagnosis/Treatment Areas, the Supply Areas - (종합병원 설비집약적인 부문의 리모델링 방안에 관한 연구 - 중앙진료부와 공급부를 중심으로 -)

  • Kim Ha-Jin
    • Korean Institute of Interior Design Journal
    • /
    • v.14 no.1
    • /
    • pp.100-108
    • /
    • 2005
  • If remodeling is defined as activities that restore the overall function of a building up to the standards currently demanded rather than as a simple replacement or repair of old facilities and equipment, the main task of remodeling should be the reduction in differences between areas, establishment of a functional linkage between departments and setup of a smooth circulation system. Therefore, this study is an analysis of remodeling strategies and construction processes to resolve major tasks of remodeling. Through this research we acquire concluding remarks. 1) The remodeling strategies of equipment-intensive areas can be divided into two measures: utilizing the existing buildings (the main buildings) the most, and of concentrated relocation in the new buildings. The former method is advantageous in that the main building serves as a center in hospital layouts because concentrated placement of the diagnosis/ treatment area and the supply area benefit the overall operation in terms of functions. However, the measure has limits in that it is difficult to install the facilities and equipment of the new demands due to the low ceilings, which serve as a potential challenge in future growth and changes. 2) The latter measure is the one in which equipment-intensive areas and the areas that are absolutely short of space are first placed in the new buildings while other areas (the outpatient area, the administration area and the miscellaneous areas) are in the existing building (main building). Given the possibility of development In the future, concentrated placement in the new buildings can be said to be more effective order to actively address future growth and changes.

A study on the vertical expansion of the urban hospital - Focused on the case of the M Cancer Center in Manhattan, NY - (도심지 병원의 수직 증·개축 사례 연구 - 뉴욕 맨해튼에 위치한 M 암 전문병원의 증·개축 사례를 중심으로 -)

  • Lim, Yeong-Hwan
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.13 no.1
    • /
    • pp.37-44
    • /
    • 2007
  • With the rapid changes in healthcare system, the impact on healthcare design is significant and constantly changed. Because of emergence of new technology, far-advanced methods of healthcare delivery, and changing social and environmental issues, the healthcare planners and architects have to make sure that future expansion are taken into consideration when they design the hospitals. This thesis aims to investigate the hospital remodeling cases in Korea and USA and find the solutions for the vertical expansion of the hospitals in the metropolitan area where the buildings may be limited to be horizontally expanded. The M Cancer center in Manhattan, NY is selected to be carefully investigated and analyzed. Based on this analysis, the strategy for the vertical expansion of the hospital will be suggested.

  • PDF

A Study on the Architectural Planning of the Spaces Related With Digital Network System in General Hospital (병원 정보화 관련 실(室) 계획에 대한 연구)

  • Lim, Sung-Jae
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.6 no.11
    • /
    • pp.107-116
    • /
    • 2000
  • The digital network system is one of the most important features in the resent hospital buildings. This study is to lay out a guideline of architectural planning according to the hospitals with digital network system. First, this study develops the concept of hospital building digital network system and reports the survey results of domestic general hospitals for this matter. Required spaces by digital network system in general hospital are classified into two categories. One is equipment room, main equipment room and a telecommunication closet, to accommodate network facilities. The other is the spaces related with medical information, medical archives and the department of radiology, because digital network system makes a change the form and use of information. In result, this study proposes models for each equipment room and raises the possibility of size change of information-spaces.

  • PDF

A Study on the Development of the Expert System for the Architectural Programming in General Hospital (종합병원의 건축 프로그래밍을 위한 전문가 시스템 개발에 관한 연구)

  • Mun, Yun-Gi;Lee, Nak-Woon
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.3 no.5
    • /
    • pp.41-52
    • /
    • 1997
  • The purpose of this thesis is to develop the new method of the expert system as a new approach of the architectural programming in general hospital. Theoretical and field investigations have been made for this study, and finally, the computer pro gram for the architectural programming of general hospital was established. The architectural programming of general hospital is more complex than any other types of buildings and has been changed rapidly according to the social, cultural and environmental factors. Hence, a new approach method is necessary for corresponding to the complexity and these factors. Therefore, the computer should be used as a tool in order to operate more logical and systematic programming.

  • PDF