• Title/Summary/Keyword: hole connection

Search Result 103, Processing Time 0.029 seconds

Connection Admission Control Using RA Based Dynamic Spectrum Hole Grouping in Multi-classes Cognitive Radio Networks (다중 클래스 인지 라디오 망에서 RA기반 동적 스펙트럼 홀 그룹핑에 의한 연결 수락 제어)

  • Lee, Jin-yi
    • Journal of Advanced Navigation Technology
    • /
    • v.26 no.4
    • /
    • pp.219-225
    • /
    • 2022
  • In this paper, we propose a CAC exploring a RA based dynamic spectrum hole grouping for secondary users' QoS enhancement in multi-classes cognitive radio networks. The RA based dynamic spectrum hole grouping uses SU multi-classes overlaying spectrum structure suggested here. Multiclass SUs are divided into real and non real, and real SUs have a priority for resource utilization against non real. The amount of resource required by real SUs is supported by Wiener prediction and the dynamic spectrum hole grouping, and that required by non real SU is supported by the remained available amount without prediction. In the simulations, we compare the proposed CAC performances using the dynamic spectrum hole grouping in terms of SU connection's blocking(dropping) rate and resource utilization efficiency according to multi-classes traffic characteristics, and then we show the proposed CAC can guarantee the desired QoS of multi-classes secondary users.

A re-examination of the current design rule for staggered bolted connections

  • Xue-Mei Lin;Michael C.H. Yam;Ke Ke;Binhui,Jiang;Qun He
    • Steel and Composite Structures
    • /
    • v.46 no.3
    • /
    • pp.403-416
    • /
    • 2023
  • This paper summarised and re-examined the theoretical basis of the commonly used design rule developed by Cochrane in the 1920s to consider staggered bolt holes in tension members, i.e., the s2/4g rule. The rule was derived assuming that the term two times the bolt hole diameter (2d0) in Cochrane's original equation could be neglected, and assuming a value of 0.5 for the fractional deduction of a staggered hole in assessing the net section area. Although the s2/4g rule generally provides good predictions of the staggered net section area, the above-mentioned assumptions used in developing the rule are doubtful, in particular for a connection with a small gauge-to-bolt-hole diameter (g/d0) ratio. It was found that the omission of 2d0 in Cochrane's original equation appreciably overestimates the net section area of a staggered bolted connection with a small g/d0 ratio. However, the assumed value of 0.5 for the fractional deduction of a staggered hole underestimates the staggered net section area for small g/d0 ratios. To improve the applicability of the above two assumptions, a modified design equation, which covers a full range of g/d0 ratio, was proposed to accurately predict the staggered net section area and was validated by the existing test data from the literature and numerical data derived from this study. Finally, a reliability analysis of the test and numerical data was conducted, and the results showed that the reliability of the modified design equation for evaluating the net section resistance of staggered bolted connections can be achieved with the partial factor of 1.25.

Shear behavior of multi-hole perfobond connectors in steel-concrete structure

  • Xing, Wei;Lin, Xiao;Shiling, Pei
    • Structural Engineering and Mechanics
    • /
    • v.56 no.6
    • /
    • pp.983-1001
    • /
    • 2015
  • This study focuses on the load carrying capacity and the force transfer mechanism of multi-hole perfobond shear connectors in steel-concrete composite structure. The behavior of multi-hole perfobond shear connector is more complicated than single-hole connector cases. 2 groups push-out tests were conducted. Based on the test results, behavior of the connection was analyzed and the failure mechanism was identified. Simplified iterative method and analytic solution were proposed based on force equilibrium for analyzing multi-hole perfobond shear connector performance. Finally, the sensitivity of design parameters of multi-hole perfobond shear connector was investigated. The results of this research showed that shear force distribution curve of multi-hole perfobond shear connector is near catenary. Shear forces distribution were determined by stiffness ratio of steel to concrete member, stiffness ratio of shear connector to steel member, and number of row. Efficiency coefficient was proposed to should be taking into account in different limit state.

Tensile Strength of Plate with Bolt Hole and Bearing Strength of Bolted Connection by Oxygen Torch Cut (볼트홀을 산소토치로 천공한 강재의 인장강도 및 지압이음강도)

  • Park, Yong Myung;Lee, Kun Joon;Kim, Dong Hyun;Ju, Ho Jung
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.6
    • /
    • pp.617-626
    • /
    • 2014
  • In this paper, experiments for the evaluation of tensile strength of steel plate with bolt hole and bearing strength of bolted connection were performed, where bolt holes were punched by drilling and oxygen torch, respectively. For the tensile tests, drilled and oxygen torch punched steel plate specimens of 10mm and 15mm thickness were made from structural angles and H-shapes, respectively. For the bearing strength evaluation, test specimens were fabricated with base plates and splice plates those were also punched by drilling and oxygen torch, respectively. The Vicker's hardness were measured around the bolt hole to investigate material property change due to heat effect by oxygen torch cut. Numerical analysis was also performed to investigate the bearing strength of bolted joints due to the increase of hardness around the bolt hole by oxygen torch cut.

Distribution of shear force in perforated shear connectors

  • Wei, Xing;Shariati, M.;Zandi, Y.;Pei, Shiling;Jin, Zhibin;Gharachurlu, S.;Abdullahi, M.M.;Tahir, M.M.;Khorami, M.
    • Steel and Composite Structures
    • /
    • v.27 no.3
    • /
    • pp.389-399
    • /
    • 2018
  • A perforated shear connector group is commonly used to transfer shear in steel-concrete composite structures when the traditional shear stud connection is not strong enough. The multi-hole perforated shear connector demonstrates a more complicated behavior than the single connector. The internal force distribution in a specific multi-hole perforated shear connector group has not been thoroughly studied. This study focuses on the load-carrying capacity and shear force distribution of multi-hole perforated shear connectors in steel-concrete composite structures. ANSYS is used to develop a three-dimensional finite element model to simulate the behavior of multi-hole perforated connectors. Material and geometric nonlinearities are considered in the model to identify the failure modes, ultimate strength, and load-slip behavior of the connection. A three-layer model is introduced and a closed-form solution for the shear force distribution is developed to facilitate design calculations. The shear force distribution curve of the multi-hole shear connector is catenary, and the efficiency coefficient must be considered in different limit states.

A Study on Serviceability of Oversized Bolt Hole in High-Tension Bolt Joint Subjected to Bending (휨을 받는 고장력볼트 체결부에서 과대공에 따른 사용성에 관한 연구)

  • Park, Jeong-Ung;Yang, Seung-Hyun;Jang, Suk-In
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2831-2836
    • /
    • 2009
  • If a design load exceeding the frictional force of the contact surface is applied to the connection of steel members using a high-tension bolt friction joint, sliding occurs and the connection of the steel members bears the design load through the shear strength and bearing strength of the bolt and the base plate. The sliding distance can be determined by the tensile force of the bolt, the friction coefficient of the contact surface, and the position of the bolt in the base plate hole. This study measured and analyzed sliding according to standard bolt hole and oversize bolt hole when pure bending moment and tensile force were applied to high-tension bolt joints with different sizes of bolt holes made in the base plate and the cover plate. In a high-tension bolt joint receiving pure bending moment and tensile force, the load causing sliding in an oversize bolt hole was $74\sim94%$ of that in a standard bolt hole. In a member receiving tensile force, the sliding load ratio was lower when the size of oversize bolt holes in the base plate and the cover plate was large. In addition, the size of the oversize bolt hole in the base plate was more closely correlated with the change of sliding loadthan the size of the oversize bolt hole in the base plate.

Development of 3-Dimensional Stress Measurement System by Bore hole Bottom Deformation Method (공저변형법에 의한 3차원응력측정 시스템의 개발)

  • Lee, Ki-Ha;Ishijima, Yoji;Fujii, Yoshiaki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.34-41
    • /
    • 2006
  • A 3-dimensional stress measurement system based on the bore hole bottom deformation method, which is one of the stress relief methods, was developed. A pilot bore hole is drilled from the bottom of a bore hole and the stress meter is inserted into the pilot bore hole in the method. The bore hole is advanced as an over coring and the deformations in seven directions are measured by cantilever type-sensors. Using the cantilever type-sensors saves time for hardening of glue. No cable connection between the stress meter and a data logger is necessary since a compact data logger is installed in the stress meter. The accuracy of the stress meter was confirmed by a biaxial test for a Shikotsu welded tuff block although in-situ tests have not been carried out yet.

  • PDF

Development of Connection between CFT Column and Pier Foundation for Top-Down Construction (Top-Down 공사용 원형충전강관기둥과 피어기초의 개발)

  • Jeong, Mee-Ra;Rhim, Hong-Chul;Kim, Seung-Weon;Kim, Dong-Gun;Kang, Seung-Ryong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.29-32
    • /
    • 2009
  • Building foundations for Top-Down construction require a special setting, because the foundations have to be placed way before excavation for the substructure of main building, Usually, the foundation goes into the layer of rock and it is often called rock-pier foundation, Currently, a cage of steel reinforcing bars is inserted to the pre-excavated hole in the rock layer, hanging down from the wide flange steel column above. This paper presents a new method for connecting the prefounded column and the steel cage with a coupler for better connection between the two, The use of a circular Concrete Filled Tube (CFT) as a prefounded column makes it possible to have this type of connection. The details of the connection and application to a Top-Down construction site is also included in this paper.

  • PDF

Experimental study on through-beam connection system for concrete filled steel tube column-RC beam

  • Tian, Chunyu;Xiao, Congzhen;Chen, Tao;Fu, Xueyi
    • Steel and Composite Structures
    • /
    • v.16 no.2
    • /
    • pp.187-201
    • /
    • 2014
  • A new through-beam connection system for a concrete filled steel tube column to RC beam is proposed. In this connection, there are openings on the steel tube while the reinforced concrete beams are continuous in the joint zone. The moment and shear force at the beam ends can be transferred to column by continuous rebar and concrete. The weakening of the axial load and shear bearing capacity due to the opening of the steel tube can be compensated by strengthening steel tube at joint zone. Using this connection, construction of the joint can be made more convenient since welding and hole drilling in situ can be avoided. Axial compression and reversed cyclic loading tests on specimens were carried out to evaluate performance of the new beam-column connection. Load-deflection performance, typical failure modes, stress and strain distributions, and the energy dissipation capacity were obtained. The experimental results showed that the new connection have good bearing capacity, superior ductility and energy dissipation capacity by effectively strengthen the steel tube at joint zone. According to the test and analysis results, some suggestions were proposed to design method of this new connection.

Evaluation of Moment Resisting Post-Base Connection Using Multi-directional Connector (다방향 접합철물 삽입형 기둥-기초 접합부 모멘트 저항성능평가)

  • Kim, Keon-Ho;Lee, Sang-Joon
    • Journal of the Korea Furniture Society
    • /
    • v.25 no.4
    • /
    • pp.331-337
    • /
    • 2014
  • The purpose of this paper is to evaluate the moment resistance of glulam post-to-base connections by applying quasi-static cyclic loads. The connectors consisted of inserted plates and drifted pins according to the load direction. The connection types employed in this study were total three including two unidirectional types (H, V) and the multi-directional type (M). The moment resistance of 8 mm-plate M-type is compared to 6 mm plate. Total four types of Post-to-base connection are prepared and tested under pseudo-static reversed cyclic loading. Test results showed that the yield moment of multi-directional connection is about 2 times higher than that uni-directional connections. The ductility ratio of multi-directional connection determined by EEEP was higher that that of uni-directional connection. It was becoming higher as the thickness of plate is increased. The Finite Element Analysis was conducted to estimate the stress distribution behavior of tested connections. Results showed the failure of multi-directional type were caused by the split of pined hole and the shear failure of lifted part of post.

  • PDF