• Title/Summary/Keyword: hoist

Search Result 96, Processing Time 0.025 seconds

Implementation of Soft-starter with Large Scale Power Stack for High Voltage Induction Motor Driving (고압 유도전동기의 구동을 위한 소프트-스타터의 대용량 파워스텍 구현)

  • Ryu, Doo-young;Jeon, Hee-jong;Shon, Jin-geun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.2
    • /
    • pp.88-93
    • /
    • 2016
  • Soft starters are used with large induction motors in blowers, fans, pumps and the crane hoist drives. AC voltage controllers are used as soft starters in induction motors for starting and to adjust its speed. Soft-starter starting system uses phase control method of input electric source through the setting of the thyristor(SCR) firing angle ${\alpha}$, and it can control input electric source stably and continuously from beginning of starting to ending of starting. In this paper, it is verified that power stack of high-voltage with SCR series system possesses dielectric strength and input electric source is controlled stably by phase control. Especially, from the driving experimental of proposed soft-starter operating, a smoothing acceleration and inrush current decrease can be achieved by the series SCR trigger.

Shock Separation Test of KOMPSAT-II (다목적 실용위성 2호 충격 분리 시험)

  • 우성현;김홍배;문상무;김영기;김규선
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.11a
    • /
    • pp.1000-1005
    • /
    • 2003
  • The shock separation test simulates the environmental effects of the spacecraft separation from launch vehicle. The shock separation test for a structural model of KOMPSAT-Ⅱ(Korea Multi-Purpose SATellite Ⅱ) was performed in SITC(Satellite Integration & Test Center) launch environmental test hall at KARI(Korea Aerospace Research Institute) to verify the shock test requirement of the spacecraft, to predict the induced acceleration responses on the primary structures and payloads by the explosion of pyre-lock and to perform mechanical fit check. The spacecraft with S/A was mated vertically to LV(Launch Vehicle) adapter simulator via a clamp band, then hoisted and suspended above a foam test bed by four isolation springs secured to the spacecraft hoist fittings to isolate the payload platform shock wave from the sling elements. For separation process, real pyre-devices were used and the time response signals from 60 accelerometers installed on the interested points was acquired and recorded. The SRS responses for each response channels were calculated and the achieved SRS's on the separation plane was reviewed and evaluated in comparison to the ICD(Interface Control Document) value.

  • PDF

Anti-swing of the Nonlinear Overhead Crane Using Partial State Feedback Control (부분상태 궤환제어를 이용한 비선형 천정크레인의 진자각제어)

  • Lee, Jong-Kyu;Lee, Sang-Ryong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.21 no.6
    • /
    • pp.907-917
    • /
    • 1997
  • The purpose of this study is to design an anti-sway motion for industrial overhead cranes which transport objects on a horizontal plane by adjusting movements of a trolley motor and a girder motor. The movement of a hoist motor has not been considered at this time since its role was assumed to move objects only vertically, therefore, not to affect the swing motion of objects. The dynamic behavior of the swing motion shows nonlinear characteristics, which makes the design of anti-sway motion controller difficult. First of all, the nonlinear state equation for the motion of industrial overhead cranes has been derived. Then they have been linearized about normal operating states determined by the dynamic characteristics of motor motion-acceleration, constant speed, and deceleration, and deceleration, during transportation. The partial state feedback control algorithm based on this linearized state equation has been developed on order to suppress the swing motion. The simulation results have demonstrated satisfactory performance of the proposed controller.

Anti-Sway Control of a Jib Crane Using Time Optimal Control (시간최적제어를 이용한 지비크레인의 흔들림제어)

  • KANG MIN-WOO;HONG KEUM-SHIK
    • Journal of Ocean Engineering and Technology
    • /
    • v.19 no.1 s.62
    • /
    • pp.87-94
    • /
    • 2005
  • This paper investigates the constant-level luffing and time optimal control of jib cranes. The constant-level luffing, which is the sustainment of the load at a constant height during luffing, is achieved by analyzing the kinematic relationship between the angular displacement of a boom and that of the main hoist motor of a jib crane. Under the assumption that the main body of the crane does not rotate, the equations of motion of the boom are derived using Newton's Second Law. The dynamic equations for the crane system are highly nonlinear; therefore, they are linearized under the small angular motion of the load to apply linear control theory. This paper investigates the time optimal control from the perspective of no-sway at a target point. A stepped velocity pattern is used to design the moving path of the jib crane. Simulation results demonstrate the effectiveness of the time optimal control, in terms of anti-sway motion of the load, while luffing the crane.

Analysis of queuing mine-cars affecting shaft station radon concentrations in Quzhou uranium mine, eastern China

  • Hong, Changshou;Zhao, Guoyan;Li, Xiangyang
    • Nuclear Engineering and Technology
    • /
    • v.50 no.3
    • /
    • pp.453-461
    • /
    • 2018
  • Shaft stations of underground uranium mines in China are not only utilized as waiting space for loaded mine-cars queuing to be hoisted but also as the principal channel for fresh air taken to working places. Therefore, assessment of how mine-car queuing processes affect shaft station radon concentration was carried out. Queuing network of mine-cars has been analyzed in an underground uranium mine, located in Quzhou, Zhejiang province of Eastern China. On the basis of mathematical analysis of the queue network, a MATLAB-based quasi-random number generating program utilizing Monte-Carlo methods was worked out. Extensive simulations were then implemented via MATALB operating on a DELL PC. Thereafter, theoretical calculations and field measurements of shaft station radon concentrations for several working conditions were performed. The queuing performance measures of interest, like average queuing length and waiting time, were found to be significantly affected by the utilization rate (positively correlated). However, even with respect to the "worst case", the shaft station radon concentration was always lower than $200Bq/m^3$. The model predictions were compared with the measuring results, and a satisfactory agreement was noted. Under current working conditions, queuing-induced variations of shaft station radon concentration of the study mine are not remarkable.

Safety Verification of Gantry Cranes using Hydraulic Cylinders (유압실린더를 사용한 갠트리 크레인의 안전성 검증)

  • Ko, Seong-Hoon;Lee, Kwang-Hee;Lee, Chul-Hee
    • Journal of Drive and Control
    • /
    • v.16 no.2
    • /
    • pp.8-14
    • /
    • 2019
  • A typical gantry crane is generally used to lift and transport objects in various workplaces. Most of the supporting structures in a gantry crane are fixed on the ground while the moving hoist is running overhead along the girder. There are some disadvantages to its long installation time and high installation cost. Therefore, a hydraulic based gantry crane was studied to solve the issues of typical gantry cranes. The supporting structure of the proposed gantry crane consisted of a hydraulic cylinder and telescopic boom. The dimension of the proposed gantry crane can be decreased due to its simplified structure. The analytical and theoretical methods were used to verify the structural stability of the proposed crane. The most severe load condition was considered for the analysis, and the stress and deflection of the structure are analyzed. The simulation results were as expected from the theoretical analysis. Finally, the structural and dynamic safety of the proposed hydraulic based gantry crane was validated. The obtained results can be used as guidelines in the design process of the hydraulic based gantry crane.

DEVS Based OHT System Simulation Design (DEVS 기반 OHT 시뮬레이션 시스템 설계)

  • Lee, Bok-Ju;Kang, Bong-Gu;Kwon, Yong-Hwan;Choi, Young-Kyu;Han, Kyung-Ah;Seo, Kyung-Min
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2020.05a
    • /
    • pp.368-371
    • /
    • 2020
  • 반도체 제조시설의 효율성을 위해 대부분의 현장에서는 물류 자동화 시스템 (AMHS, Automated Material Handling System)을 도입하여 운영하고 있다. OHT(Overhead Hoist Transfer)는 반도체 공정에서 주로 활용되는 Monorail 컨베이어 형태의 자동 반송 시스템의 일종으로 작업물을 들고 제조라인 위에 설치된 레일을 따라 자율적으로 이동하는 방식으로 운영된다. 도체 물류 시스템의 계층적인 구조적 특징과 고가의 재료를 다루고, 외부유출이 어려운 실제 공정 현장, 실험 환경의 시간, 공간적 구축 등의 현실적 특징 때문에 반도체 제조 공정의 자동화 물류시스템에 대한 모델링 및 시뮬레이션을 통한 연구의 필요성이 대두되고 있다. 본 논문에서는 OHT를 효율적으로 제어하기 위해 DEVS(Discrete Event System Specifications) 형식론을 기반으로 OHT 시스템 모델링 및 시뮬레이션 설계 방법을 제안한다. 이를 위해 반도체 제조 시스템의 전반적인 물류 과정에 대해 분석하고, DEVS 형식론에 대해 연구하며, 이를 바탕으로 반도체 물류 시스템을 위한 모델링 및 시뮬레이션을 설계하였으면, 실험을 통해 제안된 모델리 반도체 물류 시스템 시뮬레이션을 수행할 수 있음을 보인다.

Agent-based Lift-car Group Operation Optimization Model in High-rise Building Construction

  • Jung, Minhyuk;Park, Moonseo;Lee, Hyun-soo;Hyun, Hosang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.221-225
    • /
    • 2015
  • To hoist construction workers to their working space is directly related to the productivity of building construction since hoisting tasks are carried out during the working time. In order to reduce hoisting time in the condition that the number of construction lift-cars is limited, various types of the lift-cars group operation plans such as zoning and sky-lobby have been applied. However, previous researches on them cannot be compared in the performance due to their methodological limitation, discrete-event simulation methods, and cannot be find better solution to increase the performance. Therefore, this research proposed the simulation-based optimization model combining the agent-based simulation method to the scatter search optimization methods. Using the proposed model, this paper carried out the comparison analysis on the performance of typical operation plans and also optimize an operation plans by controlling the service range of lift-cars, the size and number of service zones. In this case study, it is verified that better alternatives than typical operation plans can be exists and it is possible to increase the productivity of building construction.

  • PDF

Sliding-Mode Control of Container Cranes (컨테이너크레인 시스템의 슬라이딩모드제어)

  • Lee Suk-Jae;Park Hahn;Hong Keum-Shik
    • Journal of Navigation and Port Research
    • /
    • v.29 no.8 s.104
    • /
    • pp.747-753
    • /
    • 2005
  • In this paper, as an anti-sway control strategy of container cranes, we investigate a variable structure control in which the moving load follows a given trajectory, whereas both the trolley and hoist controllers achieve their positioning problems. It is crucial, in an automated container terminal, that collisions should be avoided during the transference of containers from one place to another. It is also necessary, in the case of a quay crane, to select suitable loading and unloading trajectories of containers, so that possible collisions with surrounding obstacles are avoided. After a brief introduction of the mathematical model, a robust control scheme (i.e., a second-order sliding mode control that guarantees a fast and precise transference and a suppression of the resulted swing) is presented. Despite model uncertainties and unmodeled actuators dynamics, the swing suppression from the given trajectory is obtained by constraining the system motion on suitable sliding surfaces, which include both the desired path and the swing angle. The proposed controller has been tested with a laboratory-size pilot crane. Experimental results are provided.

The Performance Evaluation of a Hydraulic and Magnetic Clamp Device Manufactured to Transport with Safety the Curved Steel Plate Required for Shipbuilding

  • Moon, Byung Young;Park, Kwang Bok;Hong, Young Jun;Lee, Sung Bum;Lee, Ki Yeol
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.5
    • /
    • pp.527-535
    • /
    • 2015
  • As a new technical approach, a hydraulic and magnetic clamp device was attempted to realize a magnetic clamp crane system that uses 8 simultaneously actuating individual hydraulic cylinders. Through this approach, a Sr type of ferritic permanent magnet ($SrO{\cdot}6Fe_2O_3$), not the previously employed electro-magnet, was utilized for the purpose of lifting and transporting the heavy weighted and oversized curved steel plates used for manufacturing the ships. This study is aimed at manufacturing and developing the hydraulic magnetic clamp prototype, which is composed of three main parts - the base frame, cylinder joint, and magnet joint - in order to safely transport such curved steel plates. Furthermore, this research was pursued to conduct a performance evaluation as to the prototype manufacture and acquire the planned quantity value and the development purpose items. The most significant item for a performance evaluation was estimated for the magnetic adhesive force (G) and in this process, a ferritic permanent magnet (Sr type) with 3700~4000 G of residual induction (Br) and 2640/2770 Oe of coercive force (Hc) was utilized. In addition, other relevant items such as hoist tension (kN), transportation time (sec), and the applied load (Kgf) exerted on the hydraulic cylinders were also evaluated in order to acquire the optimum quantity value. As a result of the evaluation, the relevant device turned out to be suitable for safely transporting the curved steel plates.