PURPOSES : Daejeon is basically divided into an old downtown and a new downtown, and the recent relocation of the Chungcheongnam-do Provincial Government of Republic of Korea from the old downtown and the opening of governmental buildings in the new downtown as well have made this new downtown only densely populated with industrial and business facilities. Such changes in the downtowns have promoted the conditions of the new downtown while, consequently, dragging down the old downtown. Out of concern for those unbalanced developments of the two downtowns, Daejeon is now carrying out several city projects to revive the old downtown. In the light of that, as a part of the project to promote the old downtown, this study aims to conduct an evaluation on landscape of the culture and arts street in Daeheungdong which was built upon those ideas of a theme street project by Daejeon. METHODS : Based on the findings from the questionnaire not only on the components that would design the streetscape of the culture and arts street but also on the public satisfaction with the streetscape, the study defined how those changes in the components affect emotional factors of the pedestrians. In order to achieve the research goal, the study made changes in D/H ratio of the street structural components as well as the roadside trees. In terms of the questionnaire method, the study used the SD scale, and proceeded with its investigation through the frequency analysis, the principal component analysis (the factor analysis) and the structural equation model. RESULTS : According to the results from the factor analysis and the regression analysis, of those three factors, such as the openness, the comfortable sensation and the safety, the openness followed by the comfortable sensation and the safety was determined to have the most positive influence on the total satisfaction. The structural model analysis reported that the D/H and the structural components of the roadside trees and planting have a positive effect on the emotional image, and this emotional image also appeared to be positively related to the total satisfaction. CONCLUSIONS : This study looked into how the changes in the street structural components of the culture and arts street in Daeheungdong would affect the satisfaction with the streetscape, and finally confirmed that the D/H and the planting are what would have a positive effect on this satisfaction. What has been learned from this study will be the basic data to figure out how to promote and improve the culture and arts street in Daeheung-dong as this data will also help designing and developing of those specialized streets in other regions.
The KHC Test Road project was initiated on 1991 to develop Korean Pavement Design Guide. It was constructed along the Joongbu Inland Expressway line between Yeoju and Gamgok. It is two-lane wide expressway containing fifteen asphalt and twenty-five Portland cement concrete test pavement sections. Various sensors were installed in the Test Road to evaluate the behavior of test pavement sections under the influence of traffic load and environmental change. The most important issues in the sensor installation are the accurate location and long-term survivability. They are directly influenced by the sensor installation methodology. The methodology for asphalt strain gages is mainly discussed in this paper because it is the second important sensors in the KHC Test Road project. In order to find the best methodology, we evaluated existing methodology from prior experience and several conducted test installations. We have tried mound, block out, and trench cuts since 2000. Among three methods, block out was the most effective one in terms of accurate location, long-term survivability, and material homogeneity. However, this method cannot be applied to the wearing coarse so that the mound method was used as an alternative. The block out method was applied to base and intermediate layers while the mound method was used to the wearing coarse. Three hundred seventy-four asphalt strain gauges were installed on asphalt pavement sections from September 3rd to November 18th in 2002. According to the sensor measurement evaluation, 6.3% of sensor demonstrated over ranged readings for mound method installation and 2.5% did for block out method installation. We lost only two sensors during the installation. It is 99.5% survival and it is excellent survival rate according to other experience.
For a private toll road project, deciding optimal toll is an important element of economic analysis for the project and a challengeable work. In this study, the optimal toll of a private toll bridge, Geoga Bridge which connects Geoje Island of Gyeongnam Province and Gaduk Island of Busan was estimated using Stated Preference (SP) data. The SP data were collected by interviewing the passenger car drivers travelling on the National Road 14. They are latent users of the bridge. A fuzzy approximate reasoning model to estimate the optimal toll was built using the SP data. For the input variable of the model, the saved travel time and toll level were employed and the diversion rate to the bridge was employed for the output variable. The diversion rates for each toll level and saved travel time were estimated and the toll level which had maximized the toll revenue was decided as optimal toll. The optimal toll was tested by comparing with the average pay rate of passenger car drivers. Since the optimal toll for passenger cars at one hour saving, the 6,250 won is about 50 % of the average pay rate of passenger car divers, the toll was evaluated not to be high. The technique employed in this study may be used for the estimation of the optimal tolls for other kinds of vehicles.
According to the revision of the Housing Act in 2013, it has been possible to carry out an apartment remodeling project involving two to three floor vertical extension. The remodeling project with vertical extension requires foundation reinforcement because structural safety due to additional load and enhanced seismic criteria must be met. In this case, structural analysis is performed to analyze the load distributed to existing PC pile and reinforced additional pile. The vertical stiffness ($K_v$) of the pile is required for structural analysis, but the research on the 20~30 year old PC pile stiffness is very limited. In this paper, the stiffness of the PC pile in accordance with the change of diameter and length was analyzed by examining the results of 38 field pile load tests performed during the construction of the apartments in the 1990's. As a result of the analysis, the pile stiffness decreases with the increase of the length-diameter ratio (L/D). In addition, the results of on-site pile load test are compared with the coefficient 'a' for estimating pile stiffness proposed in Korea Highway Bridge Design Standard (2008) and the Pile Foundation Design Guideline of Korea Railroad Corporation (2012). It shows that 'a' obtained through the estimation of the literature is very similar to the field test results in the range of 10
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.1D
/
pp.95-103
/
2006
One of the main functions of the 4D system includes visualizing numerical schedule data in construction. The existing 4D tools have an excellent function for simulating building projects that all activities are progressed according to vertical work zone. However, it is not easy to implement all of it in the civil engineering project because the construction activities of highway and railway projects are progressed on the horizontal work zone and the 4D simulation for those projects should include earthwork objects that depend on the natural ground condition. This study suggests a new methodology for improving those limitations of 4D system for the civil engineering project and develops a new system by the suggested methodology. To verify the developed system, this study attempts to simulate 4D object for horizontal elements such as earthwork, paving work and tunneling work. The morphing and multi-texturing techniques developed in the study can be new approaches to simulate 4D object for the earthwork such as cutting and banking whose activities are progressed on the natural ground condition. The research results can be expected as a draft function for improving the application of 4D system in civil engineering projects.
KSCE Journal of Civil and Environmental Engineering Research
/
v.32
no.4D
/
pp.305-311
/
2012
With the rapid deployment of hipass$^{(R)}$, the congestion is inevitable due to the operation of the hipass lane system. Recently, SMART Highway project have developed a multi-lane mainline tolling system, called SMART Tolling system. To analyze the effectiveness of the system in terms of capacity, this study tries to estimate the capacity and its improvement of multi-lane tolling system based on current hipass$^{(R)}$ data. The methodology uses the saturation time headway. This follows three steps; 1) estimate the saturation time headway, using hipass$^{(R)}$ data, and capacity. 2) estimate two factors (the first one is dividing the one side lane width and lateral clearance factor ($f_w$) into two side one, the second one is dividing the capacity of hipass lane operating a circuit breaker into the capacity of hipass lane not operating, the last one is increasing factor of lane width). 3) calculate the capacity of multi-lane mainline tolling system. The results of method produced 2172~2187 veh/hour as smart tolling capacities, respectively. Those are higher about 370 veh/hour than the values from existing literature reviews. Additionally, saturation time headways were identified as lower by 0.5 seconds/veh than existing headways based on hi-pass$^{(R)}$ based one, which naturally implies the improvement in capacity. Some limitations and future research agenda have also been discussed.
Recently, the new pavement design method considering Korean environment and the specification for improving performance of pavement are being developed in Korea. The Jointed Concrete Pavement Program Applying Load Discretization Algorithm (called HEART-JCP) is one of the results of Korea Pavement Research Project in Korea. HEART-JCP program is developed to analyze various loading condition using the load discretization algorithm without mesh refinement. In addition, it can be modified easily into multi-purpose concrete pavement nidyses program because of the modularized structure characteristic of HEART-JCP. The program consists of basic program part and load discretization part. In basic program part, the displacement and stress are computed in the concrete slab, sub-layer, and dowel bar, which are modeled with plate/shell element, spring element and beam element. In load discretization program part, load discretization algorithm that was used for the continuum solid element is modified to analyze the model with plate and shell element. The program can analyze the distributed load, concentrated load, thermal load and body load using load discretization algorithm. From the result of verification and sensitivity study, it was known that the loading position, the magnitude of load, and the thickness of slab were the major factors of concrete pavement behavior as expected. Since the result of the model developed is similar to the results of Westergaard solution and ILLISLAB, the program can be used to estimate the behavior of jointed concrete pavement reasonably.
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.1D
/
pp.7-15
/
2011
The travel time value is important factor for the evaluation of feasibility the transportation facility investment. The existing method for calculation of the travel time for each mode uses daily average trip purpose. So the value of travel time is constant because it is estimated with only daily average proportion. This daily constant time value can distort the results of future demands of toll roads or economic appraisals for the projects. The proportion of the trip purpose varies by time periods. Accordingly the value of travel time also varies by time periods. In this study, times periods are classified as morning peak, evening peak, business time off-peak, and non-business time off-peak. And trip purpose proportions are sorted by each time period from raw data of Seoul household trip study, then the value of travel time for each time period is estimated with these sorted purpose proportions. A case study of Seoul Jung-gu and Yongsan-gu performed with newly estimated time value by time periods. The result of benefit calculation with the daily constant time value is overestimated approximately annual 2.5 billion Won compared by time values by time periods. The demands of toll roads are also overestimated with the existing daily constant time value by daily 3,500 vehicles and total revenue of toll roads are overestimated by annually 1 billion Won. In conclusion, the value of travel time by each time period enables the more precise economic evaluation of the transportation facility investment projects, mode choice behavior, and route choice behavior especially for toll roads.
The purpose of this paper is "A Study on the Establishment of Distribution and Logistics System in the unified Korea". The main conclusion of this paper are as follows : North and South Korea shall conjunctionally foster the exchange and cooperation area and operate the joint pilot project to combine distribution and logistics system. To solve the problems of the maritime affairs, Fisheries, and international logistics, the cooperative agreement between North and South Korea will be needed to protect and develop of shipping, aviation and shipbuilding industry. Unification of two Koreas must be prepared as stage by stage ; ${\cdot}$Stage1(preparation period) : initiation of peace area. ${\cdot}$Stage2(development period) : forming the exchange and cooperation area ${\cdot}$Stage3(settlement period) : establishing peace belt on border area. After the unification, two Koreas must plan and undertake the construction of the distribution and logistics infrastructures, establishment of SCM system through Network and the connection to China through railway and road Network.
The on-land seismic survey in Korea was begun in mid-1960s. Kim et al.(1967) of Korea Geological Survey reported on the result of gravity and seismic reflection surveys conducted in the Pohang area for the period of 1963-64 to assess its possibility of oil entrapment. Hyun and Kim (1966) carried out a refraction survey on the tunnel wall. Since then, the KGS geophysicists had conducted seismic surveys on Kyungsang sedimentary basin as a main project for several years. In 1970s, on-land seismic surveys had been conducted for various purposes such as site investigation for the nuclear power plants and industrial complex, exploration for ground water, mineral resources and underground tunnel. The first reflection survey with CMP acquisition was attempted in 1978 by using a digital recording system. But most of on-land seismic surveys had employed the refraction method until 1980s. In 1990s, high resolution reflection and various borehole seismic surveys such as tomography, uphole, downhole, cross-hole methods have been attempted by universities and engineering companies. The applications of on-land seismic surveys have been enlarged for both academic and industrial purposes such as investigation of geologic structure of the fault and tidal flat area, construction of highway, railroad and dam, geothermal energy and mineral resource exploration, environmental assessment for waste disposal sites and archaeological investigations. In 2002, the first crustal seismic survey was carried out on the profile of 294km length across the whole peninsular. It is expected that the advanced technology and experience acquired through offshore seismic surveys, which have been conducted in continental shelf of Korea and foreign oil fields, will stimulate the more active on-land seismic explorations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.