A Study on Road Safety Evaluation Method for Improvement Project of Two-Lane Road (2차로 시설개량 사업의 도로 안전성 평가방법 연구)

  • Shin, Chul-Ho;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.1
    • /
    • pp.105-114
    • /
    • 2019
  • Recently, the paradigm of road policy has been focused on user safety. Recently, the number of road facility improvement project has been continuously increased but the economic feasibility (B/C ratio) is insufficient. Therefore, it is necessary to select a reasonable road improvement project through accurate and objective analysis of the road safety evaluation. In this study, to develop a new road safety evaluation method, data were collected based on the current road safety evaluation method for 75 routes including national roads and provincial ones. Based on the collected data, problems were analyzed and utilized as the basic factors of the new road safety evaluation method. Therefore, in this study, traffic accidents were reflected as a general evaluation item by weighing to solve these problems, and the evaluation items were added from experiences and ideas of the local public officials. For each evaluation item, a reasonable weight was determined through AHP (Analytic Hierarchy Process) questionnaire evaluation with highway experts. In addition, the safety index was determined based on the evaluation criteria for each evaluation item. The criteria for evaluating the danger zone are determined by the overall safety index. Finally, the criteria for selection of road improvement projects based on the overall risk level were derived.

Effect of Inadequate Design on Cost and Time Overrun of Road Construction Projects in Tanzania

  • Rwakarehe, Eradius E.;Mfinanga, David A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.15-28
    • /
    • 2014
  • Completing road construction projects within the budget and time has been a problem for the Tanzania National Roads Agency (TANROADS); and the major problem highlighted in almost all projects being inadequate design. However, the extent to which inadequate design contributes to both time and cost overruns and its causes remained under-studied. The objective of this study is therefore to determine the extent of the effect of inadequate design, its causes and remedial measures. The methodology used in this study includes reviewing recent projects completion reports, holding roundtable discussions with consultants and TANROADS officials and analyzing the information. Cost and time overruns for the reviewed projects averaged 44% and 26% respectively. Similarly, the extents to which inadequate design contributes to cost and time overruns were on average found to be 61% and 85% respectively. The overruns are predominantly related to problems that occurred during the design process. To alleviate the problem, TANROADS is advised to improve the management of design projects, enhance the process of reviewing design reports, improve the design process including introducing Road Safety Audit and geometric design manuals, and increase staff to match the work-load.

A Study on the Factors Affecting the Intention to Use of Smart Tolling Service (스마트톨링 서비스 이용의도에 영향을 미치는 요인에 관한 연구)

  • Hur, Seong-Il;Choi, Jeongil;Han, Kyeong-Seok
    • Journal of Information Technology Services
    • /
    • v.17 no.3
    • /
    • pp.139-156
    • /
    • 2018
  • Smart tolling, which improved the drawbacks of the existing high-pass system, was developed and built through the Smart Highway R & D project in 2007. In order to successfully introduce and spread Smart Tolling, it is need to analyze factors that affected by intent to use. This study conducted research based on literature studies and empirical studies, and developed a research model to analyze factors affecting the users' intention of smart tolling system based on technology acceptance model (TAM) and value based acceptance model. The main variables of the research model are service characteristics (convenience, reliability), technical characteristics (flexibility, stability), environmental characteristics (switching cost, effectiveness of policy) and intention to use. To test the hypotheses set in this study, frequency analysis, exploratory factor analysis, and confirmatory factor analysis were performed using the SPSS 22.0 program statistical package and AMOSS 18.0. The convenience and reliability presented by service characteristics did not affect the intention to use of smart tolling service.

The Extract of 3D Road Centerline Using Video Camera (비디오 카메라를 이용한 3차원 도로중심선 추출)

  • Seo Dong-Ju;Lee Jong-Chool
    • International Journal of Highway Engineering
    • /
    • v.8 no.1 s.27
    • /
    • pp.65-75
    • /
    • 2006
  • According to development of computer technology, the utilization of the fourth generation of digital photogrammetry progresses favorable. Especially the method of using digital video camera is very practicable and has an advantage such as a profitability for the amateur. In road field which if centrical facilities of national industry, this method was utilized to acquire road information for the safety diagnosis or maintenance. In this study, 3-dimensional position information of road centerline was extracted using digital video camera which has practicality and economical efficiency. This data could be a basic source in road information project.

  • PDF

Development of the Analysis Methodology for Interrelationship between Transportation Facilities (교통시설 상호연관성 분석방법론 개발)

  • Namkung, Baekkyu;Chung, Sungbong;Chang, Yu-Jin
    • International Journal of Highway Engineering
    • /
    • v.15 no.3
    • /
    • pp.169-176
    • /
    • 2013
  • PURPOSES : Lots of criticism such as over/duplication investment, inconsistency of the policies among local governments and national plans etc. has been aroused due to the policy of supply-driven construction for transportation facilities. Recently, according to the environmental-friendly transportation policy, the investment of railroad has been expanded gradually, however the duplication with existing road facility makes it difficult to construct railroad. Thus it is necessary to evaluate the interrelationship between new project and existing facilities in the planning stage. However the method and the criteria for analyzing the duplication and over-investment of projects are not established in the manual, thus the feasibility of these projects are carried out from the economic point of view. METHODS: First, It reviewed about interrelationship criteria(domestic, overseas) and proposed implications and this study directions. Next, It developed the methods of evaluating independency, competitiveness and complementarity. RESULTS : In this study, the methods of evaluating independency, competitiveness and complementarity etc. are suggested to analyze the interrelationship between transportation facilities. The case study was carried out to examine the applicability of the methods. CONCLUSIONS: The methods raise rationality of decision-making compared to existing one. In the future, these methods are introduced into the manual of pre-feasibility study and feasibility study, more efficient decision-making and investment are expected.

TORANOMON HILLS - Super High-Rise Building on Urban Highway -

  • Hitomi, Yasuyoshi;Takahashi, Hiroshi;Karasaki, Hidenori
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.3
    • /
    • pp.167-171
    • /
    • 2014
  • TORANOMON HILLS is the main building of a large-scale re-development project located in the center of Tokyo. This high-rise building has a height of 247 m and 52 floors above ground, 5 floors below ground, and $62m{\times}80m$ in plan. It is used as hotel, residential facilities, offices, shops and conference facilities. The super structure is mainly a rigid steel frame with response-control devices, using concrete-filled steel tube columns. The underground section is a mixed structure composed of steel, steel-reinforced concrete and reinforced concrete framings. The piled-raft foundation type is used. The remarkable feature of this high-rise building is that the motorway runs through the basements of the building, which makes it stand just above the motorway. This condition is an important factor of the building design. The plan shape is designed to fit along the curve of the motorway. Special columns at the corners are required to avoid placing columns in the motorway. This special column is a single inclined column in the lower floors that branches into two columns in the mid-floors to suit the column location in the upper floors. The cast steel joint is used for the branching point of each special column to securely transfer the stress.

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

Cover Requirements for Corrugated HDPE and PVC Pipes Used for Cross-drains in Highway Construction (고속도로 하부 횡단 배수시설로 사용되는 파형 플래스틱 관의 덮개 요건)

  • Kang, Junsuk;Davidson, James S.;Lim, Jeong-Hyeon;Kang, Young Jong
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.4 no.1
    • /
    • pp.15-24
    • /
    • 2013
  • This project investigated the use of two types of thermoplastic pipes, High-Density Polyethylene (HDPE) and Poly-vinyl Chloride (PVC), as cross-drains under highways. Pipes ranging from 0.3 m (12 in.) to 1.5 m (60 in.) in diameter were evaluated under deep fills, minimum cover, and construction loads. In addition to a comprehensive literature review, an analytical study into the allowable fill heights for thermoplastic pipes and a field study to observe the installation and performance of the pipe in service conditions were conducted. Based on the study findings, recommendations regarding how and when thermoplastic pipe should be installed are provided.

Rutting Potential Evaluation of Asphalt Mixtures by Repeated-Load Creep Test (반복하중 크리프시험에 의한 아스팔트 혼합물의 소성변형특성 평가)

  • Zhu L.Y.;Fwa T.F.
    • International Journal of Highway Engineering
    • /
    • v.8 no.3 s.29
    • /
    • pp.21-28
    • /
    • 2006
  • Field or laboratory wheel tracking tests have been employed for the evaluation of the rutting potential of asphalt paving mixtures. Compared to field tests, laboratory wheel tracking tests are much less expensive and more manageable for most road projects. However, most test laboratories are not equipped to perform such tests because there does not exist any standard test procedure, and the required equipment is rather expensive. Futhermore, the size of test specimens and the relatively large quantity of test mixture required present difficulties for laboratory specimen mixing and compaction. This paper describes a project conducted to study the feasibility of replacing wheel tracking testsby a repeated-load creep test for rutting potential evaluation. Comparisons were made between the results of the two tests for different test temperatures, loading speeds and applied pressures. Three types of asphalt mixtures were studied in the test program. Favorable conclusions concerning the use of the repeated-load test for rutting potential evaluation were drawn based on the findings of the experimental test results. The correlation between the two types of tests was found to be good for all threeasphalt mixtures. Adopting the repeated-load creep test would lead to cost savings since it employs standard test equipment already available in most laboratories. It would also result in substantial time savings due to the much smaller quantity of mix needed, and the ease in specimen preparation.

  • PDF

Evaluation of Field Application and Laboratory Performance of Warm-Mix Asphalt According to the Dosage Rate of Additive (중온화 첨가제 첨가비율에 따른 현장 적용성 평가 및 실내 역학적 거동 특성 연구)

  • Yang, Sunglin;Baek, Cheolmin;Hwang, Sungdo;Kwon, Soo-Ahn
    • International Journal of Highway Engineering
    • /
    • v.15 no.4
    • /
    • pp.117-125
    • /
    • 2013
  • PURPOSES : The purpose of this study is to evaluate of field application and laboratory performance of warm-mix asphalt (WMA) according to the dosage rate of organic-based WMA additive. METHODS: Three asphalt mixtures, i.e., hot mix asphalt (HMA), WMA with the dosage rate of 1.5%, WMA with the dosage rate of 1.0%, were sampled from the asphalt plant when the field trial project were constructed. With these mixtures, the laboratory testings were performed to evaluate the linear viscoelastic characteristics and the resistance to moisture, rutting and fatigue damage. RESULTS : From the laboratory test results, it was found that the WMA with the reduced dosage rate of additive would be comparable to HMA and WMA with the original dosage rate in terms of the dynamic modulus, tensile strength ratio, rutting resistance. However, the fatigue reisistance of WMA with the reduced dosage rate was slightly worse but it should be noted that the fatigue performance is necessarily predicted by combining the material properties and pavement structure. CONCLUSIONS: Through the field construction and laboratory testings, the dosage rate of organic-based WMA additive could be reduced from 1.5% to 1.0% without the significant decrease of compactability and laboratory performance. The long-term performance of the constructed pavement will be periodically monitored to support the findings from this study.