• Title/Summary/Keyword: highway project

Search Result 200, Processing Time 0.023 seconds

Development of Evaluation Method for Environmental Friendly Property in National Highway (일반국도의 환경친화성 평가방법론 개발)

  • Jeon, Woo-Hoon;Lee, Young-Ihn
    • International Journal of Highway Engineering
    • /
    • v.12 no.3
    • /
    • pp.87-92
    • /
    • 2010
  • As the Concept "how environmental friendly" becomes more and more important in road construction. However, so far there is no estimation method. Environmental friendly concept can be incorporated at the plan level in order to influence decision making, and support policies that affect environment. The overall goal of this study was to develop environmental friendly concept measures for the national highway and to develop a methodology to implement a more environmental friendly concept. The research identified 8 performance measures through a project analysis that could address environmental impact assessment system's ten strategic goals - Topography, Wildlife, hydrology, landuse, air quality, water quality, soil, waste, noise, landscape. The qualitatively and quantitatively evaluation approach was selected as the decision support framework and performance measure were investigated using the AHP(Analytic Hierarchy Process) and pilot corridor for a 10 section and calculate the index values. The methodology was applied to a pilot corridor comprised of a 120km section of national highway in korea. The methodology made it possible to identify the specific performance measures that need improvement to enhance the overall environmental friendly concept. It is fairly intuitive, based on readily available data, and is easy to apply. It provides a powerful tool for government to assess the relative environmental friendly conceptof their transportation corridors now and in the future. It allows for comparisons within a corridor and with other corridors and identifies the improvements needed to enhance the environmental friendly concept.

Construction Partnering on Alternative Project Delivery Methods: A Case Study of Construction Manager/General Contractor Partnered Transportation Projects

  • Adamtey, Simon A.;Kereri, James O.
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.4
    • /
    • pp.1-15
    • /
    • 2019
  • Since its adoption by the transportation sector in the early 1990s, partnering has been broadly used with the traditional delivery method by many agencies with significant reported benefits. During the same era, a number of transportation agencies (DOTs) started experimenting with a wide variety of alternative project delivery methods (APDMs) aimed at improving the delivery of highway construction projects. The effect of collaborative working strategies such as partnering, together with the APDMs have become somehow interrelated posing a potential challenge on how to effectively integrate partnering as a concept in the APDMs. The salient question has been if the collaborative nature of these APDMs has affected how partnering is being used by state DOTs. Through an extensive literature review, analysis of 32 CMGC RFPs/RFQs and review of three CMGC case studies, the study found that there is limited information in state DOT documents that show procedures on the usage of partnering with CMGC projects. Majority of DOTs are relying on the inherent nature of the CMGC contract to promote healthy collaborative practices and there is the need to consider partnering during preconstruction and construction separately to cater for any personnel change over. The study also revealed that partnering may become less important at the construction phase due to overlap between partnering and CMGC practices. In support of this finding, a CMGC partnering model was developed that can be adopted by DOTs. This paper contributes to both research and practice by expanding the existing knowledge on partnering on APDMs.

Comparing the Effectiveness of Road Safety Features by Spatial Scope of Safety Improvement Project (도로안전개선사업의 공간적 범위에 따른 도로안전시설물의 효과도 비교)

  • Park, Gyu-Yeong;Kim, Tae-Hui;Kim, Seong-Uk;Lee, Su-Beom
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.4 s.90
    • /
    • pp.31-42
    • /
    • 2006
  • The purpose of this study is to compare the effectiveness of road safety features by spatial scope Spot & Section-based safety Improvement project. Empirical data was collected from black-spot study of Jeonbuk and "Traffic Safety Improvement Project on National Highway 17". Evaluation model of effectiveness was developed by using Empirical Bayes (EB) method. And Relative Effectiveness was measured by Odds Ratio. The result indicates that Section-based safety improvement was $7.09{\sim}77.27%$ more effective than the spot-based. It means that section-based improvement projects should be expanded while considering the characteristics of the section in spot based improvement.

Automated Prioritization of Construction Project Requirements using Machine Learning and Fuzzy Logic System

  • Hassan, Fahad ul;Le, Tuyen;Le, Chau;Shrestha, K. Joseph
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.304-311
    • /
    • 2022
  • Construction inspection is a crucial stage that ensures that all contractual requirements of a construction project are verified. The construction inspection capabilities among state highway agencies have been greatly affected due to budget reduction. As a result, efficient inspection practices such as risk-based inspection are required to optimize the use of limited resources without compromising inspection quality. Automated prioritization of textual requirements according to their criticality would be extremely helpful since contractual requirements are typically presented in an unstructured natural language in voluminous text documents. The current study introduces a novel model for predicting the risk level of requirements using machine learning (ML) algorithms. The ML algorithms tested in this study included naïve Bayes, support vector machines, logistic regression, and random forest. The training data includes sequences of requirement texts which were labeled with risk levels (such as very low, low, medium, high, very high) using the fuzzy logic systems. The fuzzy model treats the three risk factors (severity, probability, detectability) as fuzzy input variables, and implements the fuzzy inference rules to determine the labels of requirements. The performance of the model was examined on labeled dataset created by fuzzy inference rules and three different membership functions. The developed requirement risk prediction model yielded a precision, recall, and f-score of 78.18%, 77.75%, and 75.82%, respectively. The proposed model is expected to provide construction inspectors with a means for the automated prioritization of voluminous requirements by their importance, thus help to maximize the effectiveness of inspection activities under resource constraints.

  • PDF

Contingent Valuation of Wildlife-Vehicle Collision Prevention Projects (조건부가치측정법을 이용한 야생동물 교통사고 예방사업의 경제적 가치 추정)

  • Lee, Namhyung;Park, Sang Soo;Bae, Inchul;Lee, Chung-Ki
    • Journal of Environmental Impact Assessment
    • /
    • v.25 no.1
    • /
    • pp.1-14
    • /
    • 2016
  • With the continuous expansion of highway network and its traffics, neighboring wildlife habitats are splitted into smaller and more isolated patches. The infrastructures contribute to the wildlife-vehicle collision by creating barriers to animal movement. This kinds of traffic accidents are dangerous factors to the drivers' safety and the facilities on the highway as well as to the wildlife themselves. One of the most common ways to prevent habitat fragmentation are fauna crossings and fences. The cost of the mitigation measures to prevent wildlife-vehicle collision could be monetized. However their economic benefits are difficult to be measured. Using contingent valuation method, this study tries to estimate the economic valuation of wildlife collision prevention projects on the Korean highways. The result shows that 43.88% of Korean household had the positive willingness pay to the projects. Moreover, we found that the recognition of the project or the favourable attitude to the environmental issues could raise the willingness-to-pay. Therefore, active public relation on the project could make the friendly public opinion and increase the number of the household which has the positive willingness-to-pay on the project.

Microsurfacing Successes and Failures (마이크로서페이싱의 성공과 실패 사례)

  • Kim, Hyun Hwan;Benjamin, Broughton;Lee, Moon Sup;Lee, Soon Jae
    • International Journal of Highway Engineering
    • /
    • v.17 no.2
    • /
    • pp.71-78
    • /
    • 2015
  • PURPOSES: This study set out to investigate the current state of microsurfacing in Texas and compared the results with the current state of the practice nationwide. METHODS: For this study, case studies were extracted from the existing literature and compared with the data obtained both from site visits by the research team and data obtained from a survey by Texas Department of Transportation (TxDOT) personnel. The successes and failures of microsurfacing are detailed and explanations of different issues are outlined. Forensic studies from Texas are included in the descriptions of those microsurfacings that failed when configured as part of the cape seals. RESULTS : Microsurfacing has been shown to be an effective pavement preservation technique when applied to an appropriate road, at an appropriate timing, and as a remedy for certain issues. The failures experienced in Texas can mostly be attributed to cape seals and an inability to recognize structurally faulty pavement. CONCLUSIONS : When applied to an appropriate road, at an appropriate timing, and as a remedy for certain issues, microsurfacing has been shown to perform well in numerous case studies. The majority of microsurfacing failures are the result of poor project selection, usually involving the treatment being applied to structurally unsound pavement.

RIMS project application raising for a public transportation immediacy operation (공공교통 전동차 안전운행을 위한 RIMS 프로젝트 적용 제고)

  • Son Young-Jin;Lee Kang-won;Bang yeon-goon;Lee do-sun
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.897-901
    • /
    • 2005
  • 21 century as the knowledge information anger society now our society industry of all fields the rolling stock maintenance conservative standardization enterprise where information anger is being turning out construction Ministry of Transportation supported with continuous development of the supply section substitution quantity information processing system which the information highway is quick and the Korean railroad technical research worker propelled the enterprise as the subjective agency, it contracted this for a vehicle field information anger system construction in link of the enterprise our construction and an agreement, information technique composed the consortium t9day and it propelled a system codevelopment. The SMSC who is a front-runner of Maj loach city railroad operation agency to 'here business relates with a vehicle field maintenance conservativeness an immediacy operation and generally and information anger it will plan it will integrate it will own jointly and business efficiency and in the dictionary an obstacle occurrence electromotive car maintenance conservative information and it will improve only maintenance conservativeness of preventive maintenance of the electromotive car it knows it will prevent to construct the maintenance conservative system of the preventive maintenance, it applied the RIMS project to sleep.

  • PDF

CRITICAL DRIVING FORCE FOR CONTRACTOR'S OPPORTUNISTIC BIDDING BEHAVIOR IN PUBLIC WORKS

  • Min-Ren Yan ;Wei Lo ;Chien-Liang Lin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.417-423
    • /
    • 2005
  • Contractor's opportunistic bidding behavior refers to contractor's deliberate low-bid, which cannot accord with the cost, and expectation for beyond-contractual reward (BCR), the compensation earned through cutting corners or claims after undertaking the construction project. This research applies System Dynamics to develop a model of contractor's pricing with consideration for dimensions of "cost", "market competition", and "BCR". Iterative computer simulations were performed to analyze the effects of contractor's pricing on the market price. The results were then examined by statistical analysis on data collected from 44 highway projects in Taiwan. It is found that the critical force driving the contractors to bid opportunistically is their excessive expectations in BCR under the current environment. Within the price competition mechanism, if the problem of BCR exists, even if the bidding system is further improved, contractors would still prefer opportunistic bidding behavior, and eventually make the whole construction industry operate ineffectively. Therefore, it is crucial to remedy the aforementioned BCR problem by more effective management policy.

  • PDF

COST BENEFIT ANALYSIS OF HIGHWAY SYSTEMS

  • Darren Thompson;Don Chen;Nick Walker;Neil Mastin
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.494-496
    • /
    • 2013
  • Cost-Benefit Analysis (CBA) is a systematic optimization process that allows users to compare different alternatives and to determine if a project is a solid investment. Many state DOTs have included CBA in their pavement management systems (PMSs) to help allocate state funds for maintenance, rehabilitation, resurfacing, and reconstruction of pavements. In a typical CBA, each pavement type has an assigned weight factor which represents the level of importance of this pavement type. To conduct an accurate CBA, it is essential to select appropriate weight factors. Arbitrarily assigning weights factors to pavements can lead to biased and inaccurate funding allocation decisions. The purpose for this paper is to outline a method to develop an ideal set of weight factors that can be utilized to conduct more accurate CBA. To this end, a matrix of all possible weight factors sets was developed. CBA was conducted for each set of weight factors to obtain a population of possible optimization solutions. Then a regression analysis was performed to establish the relationship between benefit and weight factors. Finally, a multi-objective genetic algorithm was applied to select the optimal set of weight factors. The findings from this study can be used by state DOTs to strategically manage their roadway systems in a cost effective manner.

  • PDF

Valuation of highway O&M contract using real option (실물옵션을 활용한 고속 도로 유지관리 계약의 가치산정)

  • Park, Taeil;Shin, Eun-Young;Lee, Yoo-Sub
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5964-5970
    • /
    • 2013
  • The recent budget planning for highway infrastructure implied that the investments for Operation & Maintenance(O&M) became greater than that for new construction. This circumstance made many stakeholders pay attention to the O&M of road infrastructure and adopt other countries' policies and system for effective management. In other countries, most O&M for road infrastructure have been done by private entities using long-term contract and Korea is about to shift from one year contract to long-term contract. The most important parts for the expansion of the long-term O&M contract for road infrastructure are valuation of the O&M contract based on accurate prediction of O&M costs and instrument for proper risk sharing between contracting parties. Thus, this study provides a methodology to estimate a reasonable O&M contract price and a framework to share contract risk between contracting parties using real option. The analysis results showed that the contract price and ceiling and floor conditions for the 20 year-contract of 20 km-highway project were 45.7, 60 and 42.3 billion won, respectively.