• Title/Summary/Keyword: highway capacity

Search Result 280, Processing Time 0.025 seconds

Fatigue Characteristics of Precast Concrete Bridge Decks under Wheel Load Condition (윤하중조건에서의 프리캐스트 콘크리트 바닥판 피로특성)

  • Joo, Bong-Chul;Park, Hung-Seok;Kim, Young-Jin;Song, Jae-Joon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.394-397
    • /
    • 2006
  • For checking fatigue safety and endurance of precast concrete deck and loop joint system in the steel plate girder composite bridge, the test composite bridge model was made for the fatigue experiment by the wheel load machine. The fatigue tests of 1,000,000 cycles were implemented according to wheel load condition of DB24 rear axle of Korea Highway Design Code. From the test results, the loop joint system for the precast deck has a sufficient flexural capacity. Although a little lower longitudinal continuity capacity is evaluated than general sound cast-in-place RC bridge deck, there is no problem about the safety. The overall fatigue level of safety defined by the code is satisfied.

  • PDF

Analytical Study on Inelastic Behavior and Ductility Capacity of Reinforced Concrete Bridge Columns with Lap Splices (주철근 겹침이음을 갖는 철근콘크리트 교각의 비탄성 거동 및 연성능력에 관한 해석적 연구)

  • 김태훈;김운학;신현목;정영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.931-936
    • /
    • 2003
  • Lap splices were located in the plastic hinge region of most bridge piers that were constructed before the adoption of the seismic design provision of Korea Highway Design Specification on 1992. Lap splicing is also permitted if hoops or spiral reinforcement are provided over the lap length in the current seismic design provision. But sudden brittle failure of lap splices may occur under inelastic cyclic loading. The purpose of this study is the analytical prediction of nonlinear hysteretic behavior and ductility capacity of reinforced concrete bridge piers with lap splices under cyclic loading. For this purpose, a nonlinear analysis program, RCAHEST(Reinforced Concrete Analysis in Higher Evaluation System Technology) is used. Lap spliced bar element is developed to predict behaviors of lap spliced bar. Maximum bar stress and slip of lap spliced bar is considered.

  • PDF

A Study on the Traffic Flow Characteristic Analysis and Applicability of Work Zones (도로 공사중의 교통류 특성분석과 적용성에 관한 연구 -고속도로를 중심으로-)

  • Lim, Chae-Moon;Lee, Ju-Ho;Lee, Young-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.5 no.4
    • /
    • pp.329-337
    • /
    • 2002
  • It is the actual condition that the increasing traffic delay and accident caused by inefficient management on various construction by occupying the roadways. Since almost roadway improvements are for the public convenient, negative effects by them are ignored. But now due to the increase of traffics demand and limitation of road supply, the positive management scheme and treatment plan on the constructions must be considered. Thus, to the extent of this study divides uninterrupted flow into freeways and the Highway, yielding the time spread between under construction and not, that is delay time, we build capacity and delay model in the change of traffic volume and occupying length.

  • PDF

Estimation of the Through Car Equivalent for Left-Turn Movement According to the Left-Turn Curve Radius in the Signalized Intersection (신호교차로에서 곡선반경에 따른 좌회전의 직진환산계수 산정)

  • 오영태;김기형
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.2
    • /
    • pp.21-28
    • /
    • 2001
  • This study is to estimate the through car equivalent for left-turn movement according to left turn radius in the signalized intersection. The saturation flow rate for left-turn movement in 92' KHCM(Korea Highway Capacity Manual) is the same as that for through movement in the signalized intersection where the left turn radius is over 20m. This study uses Duncan 'Test's Test in order to find out the saturated position for queued vehicle in the signalized intersection. It found that the saturated flow rate of left-turn movement in the signalized intersection is less than that of through movement where the left-turn radius is less than 20m. It found that the through car equivalents for left-turn movement according to left-turn radius(8m-20m) are between 1.05 and 1.14.

  • PDF

Application of Recycled Aggregate in Job site as Anti-freezing and Lean Concrete Base Materials (현장파쇄 재생골재의 동상방지층 및 빈배합 콘크리트 기층 시험시공연구)

  • Kim, Jin-Cheol;Shim, Jae-Won;Cho, Kyou-Sung;Choi, Go-Il
    • International Journal of Highway Engineering
    • /
    • v.6 no.4 s.22
    • /
    • pp.25-33
    • /
    • 2004
  • The waste concrete produced by the process of the highway construction and management, has been crushed in-situ, and the waste aggregate has been experimentally used for anti-freezing layer and lean concrete. After testing the bearing capacity on anti-freezing layer, it was found that when the waste aggregates mixed with natural sand would be within the required gradations, the layer meets the requirements of limitation and the percentage to passing 2$\sim$20mm sieve increased by 5$\sim$13% because the flimsy mortars on aggregate were re-crushed by vibrated-roller compactor. The compressive strength of lean concrete using recycled aggregate was 71$\sim$85% of the natural coarce aggregate made, but nevertheless the recycled aggregates are applicable to the lean concrete because they largely exceeded the required strength, $57.5kgf/cm^2$.

  • PDF

Case History Evaluation of Axial Behavior of Micropiles (소구경말뚝의 축방향 거동에 대한 사례 연구)

  • Jeon Sang-Soo
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.7
    • /
    • pp.25-32
    • /
    • 2004
  • This paper examines the results of full-scale field tests on micropiles and side resistance is evaluated with respect to axial displacements and soil properties. Both cohesive and cohesionless soils are included in this evaluation. For all practical purposes, the developed load-displacement relationship and the geotechnical soil properties for each micropile and soil type can be used to represent the available data well through normalized average values and empirical correlations. There is a significant difference in load-carrying capacity between micropiles and drilled shafts that results primarily from the micropile pressure-grouting installation effects on the state of stress in the ground. The results show that micropiles can have a significant increase of capacity over larger-diameter drilled shafts at shallower depths with D/B < 100 or so. In cohesive soils, the typical increase is on the order of 1.5 with values as high as 2.5. For cohesionless soils, the typical increases are in the range of 1.5 to 2.5 with values as high as 6.

A Study on Optimization of Lane-Use and Traffic Signal Timing at a Signalized Intersection (신호교차로의 차로 배정과 신호시간 최적화 모형에 관한 연구)

  • Kim, Ju Hyun;Shin, Eon Kyo
    • International Journal of Highway Engineering
    • /
    • v.17 no.5
    • /
    • pp.93-103
    • /
    • 2015
  • PURPOSES : The purpose of this study is to present a linear programing optimization model for the design of lane-based lane-uses and signal timings for an isolated intersection. METHODS: For the optimization model, a set of constraints for lane-uses and signal settings are identified to ensure feasibility and safety of traffic flow. Three types of objective functions are introduced for optimizing lane-uses and signal operation, including 1) flow ratio minimization of a dual-ring signal control system, 2) cycle length minimization, and 3) capacity maximization. RESULTS : The three types of model were evaluated in terms of minimizing delay time. From the experimental results, the flow ratio minimization model proved to be more effective in reducing delay time than cycle length minimization and capacity maximization models and provided reasonable cycle lengths located between those of other two models. CONCLUSIONS : It was concluded that the flow ratio minimization objective function is the proper one to implement for lane-uses and signal settings optimization to reduce delay time for signalized intersections.

Three-dimensional numerical modelling of geocell reinforced soils and its practical application

  • Song, Fei;Tian, Yinghui
    • Geomechanics and Engineering
    • /
    • v.17 no.1
    • /
    • pp.1-9
    • /
    • 2019
  • This paper proposes a new numerical approach to model geocell reinforced soils, where the geocell is described as membrane elements and the complex interaction between geocell and soil is realized by coupling their degrees of freedom. The effectiveness and robustness of this approach are demonstrated using two examples, i.e., a geocell-reinforced foundation and a large scale retaining wall project. The first example validates the approach against established solutions through a comprehensive parametrical study to understand the influence of geocell on the improvement of bearing capacity of foundations. The study results show that reducing the geocell pocket size has a strong effect on improving the bearing capacity. In addition, when the aspect ratio maintains the same value, the bearing capacity improvement with increasing geocell height is insignificant. Comparing with the field monitoring and measurement in the project, the second example investigates the application of the approach to practical engineering projects. This paper provides a practically feasible and efficient modelling approach, where no explicit interface or contact is required. This allows geocell reinforced soils in large scale project can be effectively modelled where the mechanism for complex geocell-soil interaction can be explicitly observed.

Comparative Analysis of Bearing Capacity by Road Pavement Method Using Geocell (Geocell을 활용한 도로포장 공법별 지지력 비교 분석)

  • Suhyung Lee;Hyunwoo Jin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.12
    • /
    • pp.19-29
    • /
    • 2023
  • The main problem with roads is that cracks and settlement occur over time due to loads acting from the surface layer. One way to solve this problem is to use Geocell. Geocell can be used for structural reinforcement for erosion prevention, ground stabilization on flat and steep slopes, load bearing, and ground preservation. In this study, analyzed road pavement application cases using Geocell and purpose of this study is to analyze the bearing capacity of a road paving method including Geocell using field tests and LFWD(Light Falling Weight Deflectometer) equipment. In addition, the bearing capacity was compared and analyzed with the existing traditional road pavement method.

Investigation of Current Practice on Hot In Place Recycling (HIR) in USA: Literature Review (현장가열재생 아스팔트 포장의 현재 미국 내의 적용 현황 연구: 문헌조사)

  • Im, Jeong Hyuk;Cho, Seong-Hwan;Hwang, Sung-Do
    • International Journal of Highway Engineering
    • /
    • v.16 no.2
    • /
    • pp.73-89
    • /
    • 2014
  • PURPOSES : The objective of this study is to investigate the current state of the practice, examining the steps in the process recommended by various agencies and the Asphalt Recycling and Reclaiming Association (ARRA)-namely mix design, structural design, structural capacity evaluation, and material characterization-in order to better understand the implications of hot in-place recycling (HIR). METHODS : In addition, the current practice of state departments of transportation (DOTs) is here reviewed with the purpose of learning from successful past experiences so as to forestall any difficulties that may emerge under similar circumstances. Also, HIR benefits, including reduced costs, improved construction processes, and environmental friendliness are presented, as well as advantages and disadvantages of HIR application. RESULTS : Most of the United States highway system is now deteriorating so that rehabilitation or reconstruction techniques are required for the most distressed roads, taking into account ways to increase the effectiveness of existing budgets. Several options are available in rehabilitating distressed roads, and the choice among these depends on many factors, including pavement distress condition, funding, and design life. Among these techniques, Hot In-Place Recycling (HIR) has emerged as a cost-effective treatment for deteriorated pavements, and has been proven an effective long-term strategy for pavement rehabilitation.