• 제목/요약/키워드: high-speed railroad

검색결과 802건 처리시간 0.027초

일반철도 강화노반 두께의 고속철도 적용 가능성 연구 (Examine the Applicability of the Thickness of Conventional Railroad Reinforced Roadbed at High-speed Railroad)

  • 이진욱;이성혁;사공명
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.3166-3171
    • /
    • 2011
  • The design standard for the thickness of reinforced roadbed is divided into high-speed and conventional railroad because dynamic characteristics of train loadings differ depending on the train speed. Due to the national plan for increasing the train speed for both conventional and new railroad lines, it is necessary to examine the applicability of concrete tracks and feasibility of the train speed increase on the conventional lines with the current thickness of the reinforced roadbed. In this study, a real-scale test was performed to monitor the dynamic characteristics of the reinforced roadbed with a thickness of 20cm and the train speed of 200km/h, 300km/h, and 400km/h. The test results were then compared with the design code to investigate the applicability of the conventional reinforced roadbed when the trains operate with higher speed.

  • PDF

Design of Position Estimator for Propulsion Inverter Driving Long Stator LSM in High Speed Maglev

  • Jo, Jeong-Min;Lee, Jin-Ho;Han, Young-Jae;Lee, Chang-Young
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • 제3권3호
    • /
    • pp.252-255
    • /
    • 2014
  • In the case of long-stator linear drives, unlike rotative drives for which speed or position sensors are a single unit attached to the shaft, these sensors extend along the guideway. The position signal transmitted from maglev vehicle can't meet the need of the real-time propulsion control. In this paper the position estimator for propulsion inverter driving long stator linear synchronous motor (LSLSM) in high speed maglev train is proposed. In order to get the higher resolution of the position information transmitted from vehicle, Full order state observer is proposed for position estimator.

팬터그래프와 전차선간 최소 이선아크 지속시간에 따른 이선율 변화량 분석 (Analysis of Percentage of Arcing between Pantograph and Overhead Contact Line as a Function of Duration of Arc)

  • 박영;이기원;권삼영;박철민;김재광;최원석
    • 전기학회논문지
    • /
    • 제63권6호
    • /
    • pp.855-859
    • /
    • 2014
  • Quality criteria for interaction between a pantograph and overhead contact wire is a most important requirement to assess of the performance for the current collection system. Interaction performance between pantograph and catenary system is subject to approval by the infrastructure manager when a new design and contraction of overhead contact line and pantograph are installed. Among the various performance, percentage of arcing at maximum line speed is a simple test method compared with contact force of pantograph due to direct sensing of pantagraph, calibrations, installations of train, and etc. On the other hand, percentage of arcing is need to reliable arcing detector and general requirements with accordance with EN 50317. In this paper, percentage of arcing are investigated on the function of duration of arc and proposed which is satiable of percentage of arcing. As a results, we proposed which duration of arcs are unsuitable from infrastructures point of view as performance testing for quality of current collection.

고속화물열차 화물안전보안 기술요구사항 검토 (Review of technology requirements of safety, security cargo for High speed freight train)

  • 한성호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.1595-1596
    • /
    • 2015
  • This study presents the review of technical requirements of safety and security for the developed high-speed freight train which will be serviced on the existing route of the high-speed line. There is no any experience to make a system design of high-speed freight train in Korea until now. We need to make a new regulations of commercial service.

  • PDF

신뢰성에 기초한 고속철도 교량의 내하력평가 (Reliability-Based Capacity Rating of High-Speed Rail-Road Bridges)

  • 조효남;이승재
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1995년도 봄 학술발표회 논문집
    • /
    • pp.73-81
    • /
    • 1995
  • In Korea, the pilot construction of the first high-speed railroad on the Seoul-Pusan has already started 2 years ago. In the thesis, an attempt is made to develop reliability-based integrity-assessment models for the computer-aided control and maintenance of high-speed railroad bridges. The strength limit state models for PC railroad bridges encompass the bending and shear strengths as well as the strength interaction equations which simultaneously take into the element and system reliablities of the proposed limit states and reliability models. Then, the actual load carrying capacity and the realistic safety of bridges are evaluated using the system reliability-based equivalent strength, and the results are compared with those of the element reliability-based or conventional methods. Various parametric studies are performed for the proposed reliability-based safety and integrity-assessment models using the actual PC box girder bridges used in the pilot construction. And the sensitivity analyses are performed for the basic random variables included in strength limit state models. It is concluded that proposed models may be practically applied for the rational assessment of safety and integrity of high speed railroad bridges.

  • PDF

전차선로 동적특성에 따른 설치상태 분석 (Analysis on Installation Condition According to Dynamic Characteristics for Overhead Catenary System)

  • 박영;이기원
    • 전기학회논문지
    • /
    • 제65권9호
    • /
    • pp.1605-1609
    • /
    • 2016
  • The measurement of current collection performance between pantograph and contact wire of overhead catenary system is intended to prove the safety of operation and the quality of the current collection system. The results of interaction performance of current collection system are required for approving with commercial operation on railway lines. The methods of interaction performance of current collection system are defined on interactional standards such as IEC 62486 and EN 50317. In this paper, the interaction performance is evaluated by the percentage of arcing on Honam high-speed line and the results are used for adjustment of the overhead catenary line structure. The experimental results in Honam high-speed line confirm that the duration of an arc lasting longer 25 ms between pantograph and contact wire was depended on the conditions of overhead contact line after installation.

Comparative study on displacement measurement sensors for high-speed railroad bridge

  • Cho, Soojin;Lee, Junhwa;Sim, Sung-Han
    • Smart Structures and Systems
    • /
    • 제21권5호
    • /
    • pp.637-652
    • /
    • 2018
  • This paper presents a comparative study of displacement measurement using four sensors that are being used in the field: they are a ring gauge, a laser Doppler vibrometer (LDV), a vision-based displacement measurement system (VDMS), and an optoelectronic displacement meter (ODM). The comparative study was carried out on a brand-new high-speed railroad bridge designed to produce displacements within a couple of millimeters under the loading of a high-speed train. The tests were carried out on a single-span steel plate girder bridge two times with different train loadings: KTX and HEMU. The measured displacement is compared as raw and further discussion was made on the measurement noise, peak displacement, and frequency response of four sensors. The comparisonsare summarized to show the pros and cons of the used sensors in measuring displacement at a typical high-speed railroad bridge.

KTX의 모터블록 성능부족 개선 실행 (Action to improve 'lack of performance' of KTX motor bloc)

  • 강기석;김진규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1139-1163
    • /
    • 2009
  • Since opening of the high speed railroad in Korea, service result of the last 5 years is commandable. About 236million passengers had taken KTX until February 2009, and number of trains in service per day during week-end increased from 128 to 181, meaning that it's grown about 40%. And MKBSF, one of indicators of the high speed railroad's reliability, registered 680,469Km at the end of the year 2008, witch is 6 times more than 121,000Km, contract base when KTX was introduced. With increasing number of trains in service, not only passengers use the high speed railroad more frequently, but also we assure its reliability through maintenance based on reliability. And actually we gather information concerning all kind of defects occurred during train circulation and then, analyse them, and eradicate their causes in order to improve the high speed railroad's reliability. This paper describes a verification test process to analyse causes of defective function about train's traction.

  • PDF

고속전철 급전계통에서의 고조파 측정 방안 (Scheme for Harmonics measurement in feeding System of high speed railroad)

  • 최흥관;황치우;윤재영
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 추계학술대회 논문집 학회본부A
    • /
    • pp.304-307
    • /
    • 1998
  • High speed railway is under construction from Seoul to Pusan. A traveling train is large single phase load that consumes 14MW power in feeding system of high speed railroad. In this paper, measurement scheme and method of power system harmonics which are generated from those loads in railroad supply system are described. This measurement scheme will be used as a first step to pave a way to power quality management due to harmonic distortion by the highspeed rail way.

  • PDF