• Title/Summary/Keyword: high speed railway communications

Search Result 27, Processing Time 0.02 seconds

Analysis of Return Current Effect for Track Circuit on Ho-Nam high Speed Line (고속열차 운행에 따른 호남고속철도 궤도회로 귀선전류 영향 분석)

  • Baek, Jong-hyen
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.42 no.5
    • /
    • pp.1110-1116
    • /
    • 2017
  • Depending on the operating characteristics, track circuit is installed for the purpose of direct or indirect control of the signal device, point switch machine and other security device. These are mainly used for train detection, transmission of information, broken rail detection and transmission of return current. Especially, the return current is related to signal system, power system and catenary line, and track circuit systems. It is one of the most important component shall be dealt for the safety of track side staff and for the protection of railway-related electrical system according to electrification. Therefore, an accurate analysis of the return current is needed to prevent the return current unbalance and the system induced disorder and failure due to an over current condition. Also, if the malfunction occurred by the return current harmonics, it can cause problems including train operation interruption. In this paper, we presented measurement and analysis method at return current and it's harmonics by high speed train operation on the honam high speed line.

Finite Element Analysis and Static Load Test of a Wheelset of Gwangju EMU for Measuring Wheel/Rail Force (차륜/궤도 작용력 측정을 위한 광주전동차 윤축의 구조해석 및 정하중 시험)

  • Jeon Eung-Sik;Ham Young-Sam;Chung Woo-Jin
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.762-767
    • /
    • 2003
  • The railroad is a means of large transportation which has many talents such as a safety and a regularity. That is a results from various confidential performance tests and evalutions of the system. The railroad system consist of various subsystems - vehicle, power spply, signal communications, track structures, operations, etc. Among them as an item of safety evaluation there is a measurement of wheel/rail force, so called a measurement of derailment coefficient. This is a very important item because a derailment of a train will bring about a big accident. Especially it is more important in high speed rail of which operation speed is over two times as fast as existing rail. In this paper, it is introduced to preprocess the wheelset for measuring wheel/rail force of Gwangiu EMU, such as to treat a measuring wheelset its finite element analysis, adhesion of strain gauges and static load test.

  • PDF

Development of Satellite and Terrestrial Convergence Technology for internet Service on High-speed Mobile vehicles (고속이동체 인터넷 위성무선연동 시스템 개발)

  • Kim, Pan-Su;Jang, Dae-Ik;Lee, Ho-Jin
    • Satellite Communications and Space Industry
    • /
    • v.14 no.1 s.29
    • /
    • pp.102-109
    • /
    • 2007
  • 본 논문은 고속열차와 같은 고속 이동체에서 위성무선연동 전송기술을 이용하여 지상무선망과 동일한 수준의 인터넷 서비스를 제공하기 위한 이동형 위성 인터넷 접속기술에 관한 것이다. 이러한 서비스 제공을 위해서는 터널이나 역사(Railway Station)와 같은 N-LOS 환경에 대한 대처기술이 필요하며, LOS 환경에서도 철로상에 설치되어 있는 Electronic Power Post나 Power Bridge 등으로 인한 주기적이고 짧은 시간동안의 신호열화 현상이나 고속 이동에 따른 도플러 현상에 대한 극복기술이 필요하다. 이러한 기술들이 집약된 본 시스템을 소개한다.

  • PDF

Parallel Descrambling of Transponder Telegram for High-Speed Train (고속철도용 트랜스폰더 텔레그램의 병렬 디스크램블링 기법)

  • Kwon, Soon-Hee;Park, Sungsoo;Shin, Dong-Joon;Lee, Jae-Ho;Ko, Kyeongjun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.41 no.2
    • /
    • pp.163-171
    • /
    • 2016
  • In order to detect the exact position of high-speed train, it is necessary to obtain location information from the transponder tag installed along the track. In this paper, we proposed parallel descrambling scheme for high-speed railway transponder system, which aims for reducing the processing time required to decode telegram. Since a telegram is stored in a tag after information bits are scrambled by an encoder, decoding procedure includes descrambling of received telegram to recover the original information bits. By analyzing the structure of the descrambling shift register circuit, we proposed a parallel descrambling scheme for fast decoding of telegram. By comparing the required number of clocks, it is shown that the proposed scheme significantly outperforms the original one.

Development of ATP Train Separation Control Simulator for Radio-based Train Control System (무선통신기반 열차제어시스템 ATP 열차간격제어알고리즘 시뮬레이터 개발)

  • Yoon, Yong-Ki;Oh, She-Chan;Choi, June-Young;Park, Jae-Young;Yang, Hai-Won
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.1
    • /
    • pp.29-36
    • /
    • 2012
  • This paper includes ATP(Automatic Train Protection) simulator development and ATP algorithm verification to allocate wayside and train-borne and verify ATP functions of communications based train control system. The train control system has some characteristics such as simple structure and high safety when wireless communication technology is applied to the train control system. Especially, vital functions can be performed with in wayside and train-borne ATP. However, different system can be realized because I/F contents vary in accordance with vital functional allocation of ATP. Drawing characteristics in accordance with wayside and train-borne functional allocation and drawing I/F details affected by such characteristics are needed accordingly. This paper includes ATP simulator development creating train location information by direct activation of an electric motor, verifies train safety distance control algorithm of ATP by functional allocation such as train movement authority and train speed limit to ATP, and draws any supplementation needed. Appropriate simulated environment for verify ATP algorithm and main factors that affect to the ATP function were confirmed.

Outage Probability and Throughput Management Using CoMP under the Coexistence of PS-LTE and LTE-R Networks (안전망과 철도망 공존환경에서 협력통신을 이용한 아웃티지 및 수율 관리)

  • Lim, WonHo;Jeong, HyoungChan;Ahmad, Ishtiaq;Chang, KyungHi
    • Journal of Advanced Navigation Technology
    • /
    • v.20 no.6
    • /
    • pp.595-603
    • /
    • 2016
  • In the Republic of Korea, the LTE-based public safety (PS-LTE) network is being built for the 700 MHz frequency band. However, the same bands are also assigned to the LTE-based high-speed railway (LTE-R) network. Therefore, it is essential to utilize the co-channel interference management schemes for the coexistence of two LTE networks in order to increase the system throughput and to reduce the user outage probability. In this paper, we focus on the downlink (DL) system for the coexistence of PS-LTE and LTE-R networks by considering non radio access network (RAN) sharing and LTE-R RAN sharing by PS-LTE users (UEs) to analyze the UE throughput. Moreover, we also utilize the cooperative communications schemes, such as coordinated multipoint (CoMP) for the coexistence of PS-LTE and LTE-R networks in order to reduce the UE outage probability. We categorize the coexistence of PS-LTE and LTE-R networks into four different scenarios, and evaluate the performance of each scenario by the important performance indexes, such as UE average throughput and UE outage probability.

Preliminary Field Trial of Improved Train Control System Using on-board Control (선로변 시설물 차상 제어를 위한 차상중심 열차제어시스템 예비 현장시험)

  • Park, Chul Hong;Choi, Hyeon Yeong;Baek, Jong-Hyen
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.39C no.3
    • /
    • pp.298-306
    • /
    • 2014
  • The railway signalling system for safe train operation regulates the train speed to ensure the safety distance between consecutive trains by using wayside facilities such as track circuits and interlocking systems. In addition, this signalling system controls the trackside equipment such as a railway point along the train line. This ground-equipment-based train control systems require high CAPEX and OPEX. To deal with these problems, the train control system using the on-board controller has been recently proposed and its related technologies have been widely studied. The on-board-controller-based train control system is that the on-board controller can directly control the trackside equipment on the train line. In addition, if this system is used, the wayside facilities can be simplified, and as a result, the efficient and cost-effective train control system can be realized. To this end, we have developed the prototypes of the on-board controller and wayside object control units which control the point and crossing gate and performed the integrated operation simulation in a testbed. In this paper, before the field test of the on-board-controller-based train control system, we perform the preliminary field trial including the installation test, wireless access test, interface test with other on-board devices, and normal operation test.