• Title/Summary/Keyword: high current cable

검색결과 301건 처리시간 0.028초

DFIG 풍력발전기가 연계된 배전선로의 고조파 공진 특성에 관한 연구 (A Study on Harmonic Resonance in a DFIG Wind Turbine-generator Connected to a Distribution Power Line)

  • 최형주;이흥호
    • 전기학회논문지
    • /
    • 제62권10호
    • /
    • pp.1383-1389
    • /
    • 2013
  • There were telecommunication noise and malfunctions of the electronic devices occurred over a wide area due to the high harmonic voltage and/or current levels of the Back-to-back converter in the DFIG wind power system even though the magnitude of all harmonics is within the international standards. The triangular carrier signals of the PWM used in the power converter system is related to the telecommunication noise because they are in the range of audible frequencies and amplified by a variety of the standing waves that were excited by harmonic voltage sources in the weak grid system such as a long distance distribution transmission lines. This paper describes the characteristics of the harmonics in the wind turbine-generator, numerical analysis and simulation of the harmonics resonance phenomena in the distribution lines as well as measuring induced voltage of the telecommunication lines in parallel with power lines in order to verify the root cause of the telecommunication noise. These noise problems can occur in a wind turbine power system with a non-linear converter at any time, as well as photovoltaic power system. So, the preliminary review of suitable filter devices and switching frequencies of the PWM have to be required by considering the stability of the controller at the design stage but as part of the measures the effect of the telecommunication cable shields was analyzed by comparing the measured data between multi-conductor with/without shields so as to attenuate the sources of the harmonics voltage induced into the telecommunication lines and to apply the most cost-effective measures in the field.

XLPE 절연체의 트리 채널내 보이드방전에 의한 AE신호로 절연열화 검출 기법 연구 (Fundamental Study of Degradation Diagnosis using AE Signals with Void Discharge in XLPE Insulation)

  • 이상우
    • 조명전기설비학회논문지
    • /
    • 제20권2호
    • /
    • pp.75-80
    • /
    • 2006
  • 본 논문은 전력 케이블의 절연체인 XLPE 시료에 상용주파수 교류전압을 인가하였을 때, 절연열화에 의한 보이드방전 펄스신호와 AE신호 및 트리진전 특성을 검출하고 관찰하였다. 또한 XLPE 절연체의 트리 채널내 인가전압에 따라 보이드방전 펄스신호와 AE신호를 각각 관측하였다. 실험 결과 전력 케이블의 절연체인 XLPE 시료의 보이드 존재 유 무에 따른 트리진전 형상은 보이드 존재시에는 수지형으로 성장하였으나, 무보이드시에는 수초형으로 성장하였다. XLPE 절연체내의 트리진전 특성은 보이드 존재시에는 열화시간이 경과함에 따라 급격히 증가하였으나, 무보이드시에는 열화 시간이 경과함에 따라 트리의 성장 형상은 감소되는 것으로 나타났다. 전력 케이블 절연체인 XLPE의 트리 채널내 보이드방전에 의한 AE신호의 주파수 스펙트럼으로 분석한 결과, AE신호의 크기에 따라 변화되었으며 그 주파수 영역은 대략 1.0[MHz] 이하의 분포인 것으로 관측되었다.

지역필터를 이용한 수변전실 접지저항의 새로운 측정방법 (A New Measurement Method of the Ground Resistance Using a Low-pass Filter in Energized Substations)

  • 이복희;엄주홍;이승칠;김성원;안창환
    • 대한전기학회논문지:전기물성ㆍ응용부문C
    • /
    • 제50권8호
    • /
    • pp.387-393
    • /
    • 2001
  • This paper describes an advanced measuring method and precise evaluation of the ground resistance for the grounding system of energized substations and power equipments. A grounding system of substations consists of all interconnected grounding connections of grounded conductors, neutral ground wires, underground conductors of distribution lines, cable shields, grounding terminals of equipments, and etc. It is very difficult to measure the accurate ground resistance of the grounding terminals of equipments, and etc. It is very difficult to measure the accurate ground resistance of the grounding system of high voltage energized substations because of harmonic components caused by switched power supplies or overloads. The conventional fall-of-potential method may be subject to big error if stray ground currents and potentials are present. In this work, to improve the precision in measurements of the ground resistance by eliminating the effects of harmonic components and stray currents and potentials, the investigations of the ground resistance measurement by using a low pass filter in a model energized grounding system were conducted. The accuracy of ground resistance mesurements was evaluated as a function of the ratio of the test signal to noise (S/N). The errors due to the proposed ground resistance measurement method were decreased with increasing S/N and were less than 5[%] as S/N is 10. The proposed ground resistance measurement method appears to be considerably more accurate than the conventional fall-of -potential method. It is allows cancellation of the parasitic resistance of energized grounding systems, to employ the measurement method that allows cancellation of the parasitic effects due to other circulating ground currents and ground potential rises in practical situations.

  • PDF

Aero-elastic response of transmission line system subjected to downburst wind: Validation of numerical model using experimental data

  • Elawady, Amal;Aboshosha, Haitham;El Damatty, Ashraf
    • Wind and Structures
    • /
    • 제27권2호
    • /
    • pp.71-88
    • /
    • 2018
  • At the University of Western Ontario (UWO), numerical tools represented in semi-closed form solution for the conductors and finite element modeling of the lattice tower were developed and utilized significantly to assess the behavior of transmission lines under downburst wind fields. Although these tools were validated against other finite element analyses, it is essential to validate the findings of those tools using experimental data. This paper reports the first aeroelastic test for a multi-span transmission line under simulated downburst. The test has been conducted at the three-dimensional wind testing facility, the WindEEE dome, located at the UWO. The experiment considers various downburst locations with respect to the transmission line system. Responses obtained from the experiment are analyzed in the current study to identify the critical downburst locations causing maximum internal forces in the structure (i.e., potential failure modes), which are compared with the failure modes obtained from the numerical tools. In addition, a quantitative comparison between the measured critical responses obtained from the experiment with critical responses obtained from the numerical tools is also conducted. The study shows a very good agreement between the critical configurations of the downburst obtained from the experiment compared to those predicted previously by different numerical studies. In addition, the structural responses obtained from the experiment and those obtained from the numerical tools are in a good agreement where a maximum difference of 16% is found for the mean responses and 25% for the peak responses.

단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산 (Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve)

  • 최귀열
    • 한국농공학회지
    • /
    • 제7권1호
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

박판 자성 재료를 이용한 전력 케이블 인근의 자기장 차폐 (Magnetic Shielding with Thin Magnetic Materials near Power Cables)

  • 김상범;소준영;신구용;정진혜;명성호
    • 한국전자파학회논문지
    • /
    • 제20권7호
    • /
    • pp.639-647
    • /
    • 2009
  • 본 연구에서는 자기장 차폐를 위하여 3상 전력 케이블을 얇은 자성 판재로 둘러싸는 방법을 제안한다. 두꺼운 상용 뮤-메탈, 방향성 및 무방향성 규소 강판을 출발 재료로 하여 두께 0.1 mm의 차폐재 3종류를 제조하였다. 3상 전류일 때, 차폐재 위치의 자기장이 100 ${\mu}T$ 정도이면 뮤-메탈이 (SF<0.1) 가장 효과적이었고, 500 ${\mu}T$ 이상 이면 규소 강판이 (SF 0.3${\sim}$0.4) 더 효과적이었다. 또한, 안쪽에 방향성 규소 강판, 바깥쪽에 뮤-메탈을 함께 둘러쌀 경우 500 ${\mu}T$까지도 SF 를 0.1 이하로 할 수 있었다. 한편, 단상 전류에서는 고 투자율 소재의 적용은 오히려 자기장을 증가시키는 결과를 보였다. 이상의 결과는 자기장 강도 H의 크기에 따라 각 소재의 투자율 우열이 서로 다른 점과 이로 인해 차폐재 내에 유도되는 자기장 벡터와 원래의 자기장 벡터의 상호 상쇄 및 중첩 작용으로 설명할 수 있었다.

IP 기반 고정형 및 맞춤형 동영상 모자익 EPG 서비스 구축방법 (A construction method for IP-based Fixed and Personalized A/V Mosaic EPG service)

  • 송치양;최락권
    • 한국컴퓨터정보학회논문지
    • /
    • 제11권5호
    • /
    • pp.39-52
    • /
    • 2006
  • 초고속 통신망의 기술진화와 방송망의 디지털 가속화에 따른 위성망/케이블망/지상파망을 통한 TV 채널 서비스는 성숙의 단계에 접어들었고, IP(Internet Protocol)망을 이용한 TV 채널 서비스도 가시화되고 있는 실정이다. 그러나, 현재 채널 가이드를 위한 모자익 EPG(Electronic Program Guide) 서비스의 경우, IP망을 이용한 구현이 미미하고, 특히, 개인 맞춤형 모자익 EPG는 전혀 제공되지 않고 있다. 본 논문은 IP망을 통해 IPTV 시청자들에게 고정형과 맞춤형의 모자익 EPG 서비스를 제공하기 위한 시스템의 구축방법을 제시한다. 고정형 A/V(Audio/Video) 모자익 EPG는 H/E(HeadEnd)단에서 정해진 다채널로 구성된 모자익 동영상을 생성하여 IP망의 멀티케스팅을 통해 전송된 후, STB (Set-Top-Box) 단이 수신하여 TV상에 서비스하는 시스템 모델과 구축을 보인다. 또한, 개인의 선호에 따라 모자익 EPG의 채널을 구성하여 볼수 있는 개인 맞춤형 A/V 모자익 EPG 서비스를 위한 모델을 제공한다. 기대효과로서, IP망을 통한 TV 채널 가이드 서비스는 IP 기술을 통한 다채널 수용의 확장성과 실용성을 통해 사용자의 채널 접근을 보다 쉽게 하였으며, 특히 개인 맞춤형 A/V 모자익 EPG 제공을 통해 개인별 선호 채널 모자익 화면을 구성하고, 동시에 성인물의 배제를 쉽도록 하였다.

  • PDF

참조채널 유도분극탐사기술에 의한 해수침투대 인지 (Recognition of Seawater Intrusion Using Reference IP Technique)

  • 이상규;황학수;황세호;박인화;신제현
    • 지구물리와물리탐사
    • /
    • 제5권1호
    • /
    • pp.56-63
    • /
    • 2002
  • 해수침투에 관한 연구는 해수침투대가 저비저항 이상대로 나타나기 때문에 주로 전기탐사를 이용한 방법이 있었으나, 우리 나라 서$\cdot$남해안 대부분의 임해 지역은 실트층 또는 점토층과 같은 양전도성 지층을 협재하고 있기 때문에 전기비저항의 대비만으로 해수침투의 여부에 대한 판정을 할 경우 오류를 범할 수도 있다. 따라서 본 논문에서는 해수침투대와 양전도성 지층을 효과적으로 식별하여 해수침투대를 정확히 파악하고자 전라북도 김제와 전라남도 영광 지역에 참조채널 유도분극탐사를 실시하였다. 전자결합을 최소화하는 차폐 전선을 사용하였으며 수신전위 파형은 물론 송신전류 파형도 참조채널에서 함께 측정하는 주파수 영역 참조채널 유도분극탐사기술을 적용하여 겉보기 비저항은 물론 유도분극 효과도 보다 정밀하게 산출하였다. 이러한 현장 탐사에서 참조채널 유도분극탐사를 활용하여 저비저항 특성만으로는 구별할 수 없었던 유도분극 효과가 큰 점토층과 유도분극 효과가 낮은 해수침투대를 구분함으로써 보다 정확한 해석을 가능하게 하였다.

되메움재 특성을 고려한 전력구 열환경 변화 예측 수치해석모델 개발 (Development of numerical model for estimating thermal environment of underground power conduit considering characteristics of backfill materials)

  • 김경훈;박상우;김민주;이대수;최항석
    • 한국터널지하공간학회 논문집
    • /
    • 제19권2호
    • /
    • pp.121-141
    • /
    • 2017
  • 최근 전력구 지중 송전선의 허용 전류용량에 대한 정부규제로 인해 전력구 공사에 현장 되메움재의 열적 거동에 대한 연구가 중요해졌다. 점차 증대되는 고용량 전력공급에 대한 수요와 더불어, 허용 전류용량을 산정하기 위해, 전력 케이블 주변 온도 증가를 유발하는 요인을 예측하고 분석하는 것이 시급하다. 전력구 내부의 과도한 열확산으로 인한 지중 송전선로 주변의 온도 증가는 지중 송전선 자체의 열저항을 증가시켜 절연 파괴 및 열 폭주 현상을 야기한다. 따라서 전력구 설계 및 시공시, 되메움재에 따른 전력구 현장 열거동 메커니즘을 규명하는 것이 매우 중요하다. 본 논문에서는 현장 시험시공을 기반으로, 전력구내부와 주변지반의 온도 변화 및 열저항을 산정하기 위한 수치해석 모델을 개발하였다. 전력구 열거동 파악을 위한 수치해석은 현장시험 시공시 획득한 4개의 다른 종류의 되메움재의 열적 그리고 물리적 물성치를 기반으로 수행되었다. 또한, 실내 시험을 통해 산정한 각 되메움재의 열저항을 수치해석 모델에 입력변수로 적용했다. 전력구 내부에 일정한 열량이 공급될 때, 되메움재의 단위중량, 함수비, 열적 특성 등 여러 변수를 고려한 열거동 메카니즘을 모사할 수 있도록 열거동 수치해석 모델을 구성하고 1년 동안의 수행된 현장계측값과 비교를 통하여 개발된 수치해석 모델을 검증하였다.

고강도 암반에서 수직구 기계굴착을 위한 연마재 워터젯 활용에 관한 연구 (A study on the utilization of abrasive waterjet for mechanical excavation of hard rock in vertical shaft construction)

  • 조선아;정주환;류희환;박준식;오태민
    • 한국터널지하공간학회 논문집
    • /
    • 제25권5호
    • /
    • pp.357-371
    • /
    • 2023
  • TBM을 이용한 전력구 공사에서 수직구는 TBM 장비 및 전력선의 진출입을 위해 필수적인 구조물이다. 수직구는 지반을 수직으로 관통하여 굴착하기 때문에 암반을 굴착하는 경우가 많다. 암반 지반은 대부분 발파나 할암 공법을 적용하여 굴착하므로 이때 발생하는 소음 및 진동, 도로 점유로 인해 민원이 발생하고 있다. 따라서 기존 공법의 대안으로 기계식 굴착장비를 이용한 수직구 굴착을 고려하였다. 다만, 현 기술 수준에서 수직구 굴착장비는 암반의 압축강도 약 120 MPa 이상에서는 굴착성능이 현저히 저하되어 고강도 암반 지반 적용에 한계가 있다. 본 연구에서는 암반에서 기계식 굴착 성능 개선을 위해 연마재 워터젯 기술을 굴착 보조공법으로 활용하는 방안에 대해 검토하였다. 연마재 워터젯 절삭성능에 대한 검증을 위해 암석 절삭실험을 수행하고, 실험결과로부터 이격거리, 이송속도, 수압 조절을 통해 지반조건 변화에 대응하여 굴착성능을 확보하는 것이 적절할 것으로 판단하였다. 또한, 일축압축강도와 RQD, 굴진율의 관계를 이용하여 연마재 워터젯을 이용한 인위적인 절리생성을 통해 굴착성능을 향상시키는 방안을 제시하였다. 본 연구결과는 향후 수직구 기계식 굴착장비 도입을 위한 기초자료로 활용될 수 있을 것으로 기대된다.